Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | ₹10.5 L | L1 | Accepted-AOC A |
| 2 | L2₹10.5 LRejected-Finance | ₹10.5 L | L2 | Rejected-Finance R |
Tender Value
₹10.6 L
EMD Value
₹22,000
Closing Date
14 Apr 2026, 12:00 pmClosed
EE REDBASTI
O/O EE REDBASTI
Vikas Khand Kudraha ke Gram Basiya Kala mein Aganbari Kendra ka Nirman karya
2026_REDUP_1134783_1
2688/RED/2025-26 Dt. 17.02.2026
Open Tender
Civil Works
90 days
works
as per sbd
2 documents required · 2 mandatory
₹944
₹22,000
Yes
13 May 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
14 Apr 2026
9 Apr 2026
9 Apr 2026 - 14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Cleaning grass and removal of rubish up to a distance of 30 m outside in periphery of the area as per Technical Specification in area of thorny jungle As per SI No. 259 | - | sqm | - | - | |
Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, watering and ramming of excavated earth into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P phowereh and basket etc. complete. | - | Cum. | - | - | |
Concrete with 4cm gauge brick ballast, sand of 1.25 F.M. and cement in proportion 10:5:1 in foundations and under floors including supply of all materials labour and tools and plants etc. required for proper complation of the work. | - | Cum. | - | - | |
R.C.C.Work with cement approved coarse sand and 2cm gauge stone girt (Dala) in the propotion of 1:1.5:3 (M-20) in Column Footing excluding supply of reinforcement and its bending but including fixing and bending the same with 24 B.W.G.G.I. banding wire and including necessary centering and shuttring etc.& also including supply of all materilas, labour and T&P etc. required for proper completion of work.As per S.I.No.287A | - | Cum. | - | - | |
R.C.C. Work with cement approved coarse sand and 20 mm gauge (nomianl size) dalla stone aggregate in the proporation of 1:1.5:3 M-20 in R.C.C. Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B W.G.G.I. binding wire and as required supply of all materials, labour centering and shuttering and removal of the same after completion of work. S.I.No. 288A | - | Cum. | - | - | |
Brick work in 1:4 cement and coarse sand of in foundation and plinth including supply of all material, labour tools and plants. etc. required for proper completion of work As per S.I. No. 305 | - | Cum. | - | - | |
Earth Work in cutting or embankment in ordinary soil including cartage of earth from 2 Km. distance S.I. No. 253 | - | Cum. | - | - | |
Brick work in 1:4 cement and coarse sand in super structure one brick thick wall including supply of all material, labour tools and plants. etc. required for proper completion of work. As per S.I. No. 305. 310. | - | Cum. | - | - | |
Brick work in 1:3 cement and C sand in 12 cm. thick wall including supply of all material, labour tools and plants. etc. required for proper completion of work. As per S.I. No. 307,310A | - | Cum. | - | - | |
RCC work with cement C sand and 20 mm Stone grit in 1:2:4 in plinth and lintels bends and sunshed of doors and window S.I. No.-283. | - | Cum. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_2118481.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid