Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.3 L
EMD Value
₹6,500
Closing Date
2 Jan 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO VP
Block Development Office, Kodumudi
Construction of OHT at Kattur in Nanjai Kolanalli Panchayat in Kodumudi Block under JJM 2020-21
2022_RDTN_274580_7
Roc No.2676/2022/B2, Dated 20.12.2022
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kodumudi BLock
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹6,500
2 Jan 2023
23 Dec 2022
2 Jan 2023
23 Dec 2022
2 Jan 2023
23 Dec 2022
Amount
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
In hard stiff clay, stiff black cotton soil, hard red earth, sales, soil S.S. 20B
In soft disintegrated rock, laterite, soft rock or kankar not requiring blasting
In DMR not requiring blasting
Second Depth of 2m to 3.0m
PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL.
RCC 1:1 1/2: 3 using 20mm HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, finishing, curing etc.(Column footing below 1.50 m from GL)
Coloumn below GL upto 1.50 m
Column above GL upto 4.50 m
Column above 4.50 m upto 6.95 m
Braces at GL
Braces at 3.325 m from GL
RCC 1:1 1/2: 3 using 20mm HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, finishing, curing etc
Floor beam at 6.95m to 7 from G.L.
Floor slab from 7.2m to 7.35m above G.L.
Centering, soffits of RCC works including strutting and shuttertting Charges etc. complete for the following
Column footing (plane surface)
Square Column:
Colum above 3.3m to 4.3 ht from GL
Column above 4.30 m upto 5.30 m
Column above 5.30 m upto6.30 m
Column above 6.30 m upto7.18 m
Brace at Ground Level
Brace at 3.35 m above Ground Level
Roof slab at0- 3.30 m above floor slab
Curved Surface
Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods
Painting two coatsto the exposed surface of SR using cement paint
Supplying and fixing of cutstone in C M 1:3 below inlet pipe
Supply,delivery and fixing in position of MS ladder outside the Service reservoir
Supplying and fixing of CI manhole cover with frame of size 0.60 m x 0.60 m
Supplying and fixing of 100 mm dia AC Cowl for ventilators on the roof slab
Refilling the foundation with excavated soil (other than sand)
Providing RCC ladder inside the tank
Rain water harvesting
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
D . CHELLAMUTHU
stage.html
html • 0.02 MB
finance_326230.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .