| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC Work order Attached | |
| 2 | L2₹2.7 L+₹22,650 (9.11%)Rejected-Finance | L2 | Rejected-Finance Commercially L2 | |
| 3 | L3₹2.7 L+₹23,960 (9.63%)Rejected-Finance | L3 | Rejected-Finance Commercially L3 | |
| 4 | M/S A. V Electricals Rejected-Technical | - | Rejected-Technical Not technical accepted, details mentioned in attached TCR | |
| 5 | Rejected-Technical | - | Rejected-Technical Not technical accepted, details mentioned in attached TCR |
Tender Value
₹3.6 L
EMD Value
₹4,500
Closing Date
22 Jul 2022, 4:00 pmClosed
Staff Officer ENM
Office of Area General Manager, Chandrapur Area
Work for Dismantling, Diversion, Extension of LT overhead line, DOCM.
2022_WCL_246458_1
wcl-ch3150-enm-0013-2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Chandrapur area
Please read tender documents of NIT
3 documents required · 3 mandatory
₹4,500
Yes
21 Sept 2023
8 Jul 2022
23 Jul 2022
9 Jul 2022
22 Jul 2022
9 Jul 2022
9 Jul 2022 - 15 Jul 2022
Amount
Labour rate: Erection rolled steel joist ( girder ) pole 200 x 100 mm. (25.9 kg/m) with provided base plate in provided foundation
Material rate: Providing pipe type earthling with 40 mm dia. G.I. pipe or 20 mm dia G.I. Rod complete with all materials. As per specification no EA-EP.
Labour rate: Providing pipe type earthling with 40 mm dia. G.I. pipe or 20 mm dia G.I. Rod complete with all materials. As per specification no EA-EP.
Labour rate: Erecting MS pole bracket for LT OH conductor fabricated from 65 x 65 x 6 mm section, 1100 mm long for necessary nos. of provided insulators and erecting on pole with 50 x 6 mm clamp as per approved method of construction and complete
Labour rate: Erecting ACSR conductor of size - 6/1 -3.66mm complete (Mink) (255 Kg/Km)
Material Rate : Supplying hard drawn GI wire 8 SWG complete erected for overhead guarding with proper size of G.I. wire for binding with jumpering etc.
Labour Rate : Supplying hard drawn G.I. wire 8 SWG complete erected for overhead guarding with proper size of G.I. wire for binding spindle, nut bolts complete erected.
Material Rate : Supplying pin type LT medium insulator 100 mm x 62 mm dia with suitable G.I. spindle, nut bolts complete erected.
Labour Rate : Supplying pin type LT medium insulator 100 mm x 62 mm dia with suitable G.I. spindle, nut bolts complete erected.
Material Rate : Supplying porcelain shackle type LT medium insulator 75 mm x115 mm dia with G.I. (Shackle) strips, nuts and bolts complete.
Labour Rate : Supplying porcelain shackle type LT medium insulator 75 mm x115 mm dia with G.I. (Shackle) strips, nuts and bolts complete..
Labour Rate : Supplying G.I. stay set for poics, including locp insulators at inaccessible height complete with anchor plate 300 x 300 x 6 mm straining screws G.I. stay wire 7/10 SWG, G.I. stay rod 20 mm x 1.8 m length and polc clamps duty erected in provided cement concrete foundation.
Material Rate : Making cement concrete foundation including excavation (60 x 60 x 150) cm deep in 1.3.6 cement concrete, (20 to 25) mm stone metal with necessary curing and finishing complete (for stay).
Labour Rate : Making cement concrete foundation including excavation (60 x 60 x 150) cm deep in 1.3.6 cement concrete, (20 to 25) mm stone metal with necessary curing and finishing complete (for stay).
Material Rate : Making cement concrete foundation including excavation (60 x 60 x 150) cm deep in 1.3.6 cement concrete, (20 to 25) mm stone metal, 45 x 45 x 45 xm / 45 dia x45 cm height plinth duly plastered, with necessary curing and finishing complete. ( for above 6 m x to 9 m poles
Labour Rate : Making cement concrete foundation including excavation (60 x 60 x 150) cm deep in 1.3.6 cement concrete, (20 to 25) mm stone metal, 45 x 45 x 45 cm / 45 dia x45 cm height plinth duly plastered, with necessary curing and finishing complete. ( for above 6 m x to 9 m poles
Material Rate : Dismantling the existing pole above 6 m height with brackets, clamps, insulators, stay from the cement concrete foundation and making the site clear by refilling the pits with excavated material and bringing it to the ground level.
Labour Rate : Dismantling the existing pole above 6 m height with brackets, clamps, insulators, stay from the cement concrete foundation and making the site clear by refilling the pits with excavated material and bringing it to the ground level.
Labour Rate : Dismantling the existing overhead line including G.I. wires of all sizes without damaging & making the coils in suitable sizes.
Total impact of GST for the purpose of CTC or as applicable
SACHIN ELECTRICAL WORKS
SATISH ELECTRICAL ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .