Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 11 82 GROUND FLOOR BLOCK 11 KALYANPURI EAST DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | ₹1.0 Cr | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹1.1 Cr+₹10.0 L (9.69%)Rejected-Finance 33 CHANDASI HOUSE LANE NO 11 S K PURAM ARYA SAMAJ MANDIR ROAD RPS MORE BAILEY ROAD DANAPUR PATNA BIHAR 801503 | PATNA | PATNA | BIHAR | 801503 | ₹1.1 Cr+₹10.0 L (9.69%) | L2 | Rejected-Finance Not lowest bidder |
| 3 | L3₹1.2 Cr+₹16.1 L (15.5%)Rejected-Finance 38 49 D OLD IDGAH COLONY AGRA U P 282001 | AGRA | AGRA | UTTAR PRADESH | 282001 | ₹1.2 Cr+₹16.1 L (15.5%) | L3 | Rejected-Finance Not lowest bidder |
| 4 | L4₹1.3 Cr+₹25.2 L (24.3%)Rejected-Finance | ₹1.3 Cr+₹25.2 L (24.3%) | L4 | Rejected-Finance Not lowest bidder |
| 5 | L5₹1.4 Cr+₹39.8 L (38.4%)Rejected-Finance RZ 212F D BLOCK RAJ NAGAR PART II PALAM COLONY NEW DELHI 110077 | SOUTH WEST | DELHI | 110077 | ₹1.4 Cr+₹39.8 L (38.4%) | L5 | Rejected-Finance Not lowest bidder |
| Sl No | Description | Qty | Unit | MV Engineers And Contractors L5 | M/s Sagar Construction L4 | Bharat Sales Corporation L1 | KEWAL SONS L6 | GUPTA ENGINEERING WORKS L3 | Vijaypower Generators Limited L7 | Roy and Sons Infrastructures L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, install, testing and commisioning of DISTRIBUTION transformer mounted on massonry platform size as recommended by OEM stepdown , 11KV/0.415KV, Three Phase complying with IS:1180(part-1 2014), level-2 with latest ammendments, outdoor type, copper wound suitable for 50 Hz system of capacity 400 KVA , oil immersed naturally cooled delta connected on HT side and Star connected on LT side ,Vector Group Dyn11, provided with OFF load tap changer to vary secondary voltage from -7.5% to + 7.5% in steP of 2.5 %. . The transformers should be supplied with first filling of oil confirming to IS 335 .The transformer should have BOTH SIDE cable end box with neutral brought out complete all as directed by Engineer - in -Charge. Note :- Massonary plateform for Transformer shall be measured & paid separately. | 1 | Each | 29,90,000 ₹29,90,000 | 21,20,000 ₹21,20,000 | 14,70,000 ₹14,70,000 Lowest | 16,90,000 ₹16,90,000 | 19,38,000 ₹19,38,000 | 29,60,000 ₹29,60,000 | 15,60,000 ₹15,60,000 |
| 1.01(a) Lifting lugs for transformer and tank. | ||||||||||
| 1.02(b) Earthing terminal rating and diagram plate. | ||||||||||
| 1.03(c ) Air release valve with explosion vent. | ||||||||||
| 1.04(d) Oil filling inlet pipe with plug. | ||||||||||
| 1.05(e) Drain outlet pipe with brass gate valve. | ||||||||||
| 1.06(f) Conservator tank with oil level indicator | ||||||||||
| 1.07(g) Silica jel breather | ||||||||||
| 1.08(h) First fill of oil upto level including conservator tank with fresh new oil conforming to IS335. | ||||||||||
| 1.09(i) Type of connection Delta/Star | ||||||||||
Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
5 Jun 2026, 6:00 pmClosed
SHRI ANIL KUMAR, IDSE, SE, CWE
HQ CWE JHANSI
SPECIAL REPAIR FOR BALANCE TRANSFORMERS AGAINST BER ALONG WITH CONNECTING ITEMS UNDER GE GWALIOR
2026_MES_763619_1
CWE/JHA/GWL/TOKEN/19 OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
GWALIOR
AS PER NIT AND TENDER DOCUMENTS
9 documents required · 9 mandatory
₹1,000
GE GWALIOR
₹2.1 L
Yes
22 Jul 2026
6 May 2026
8 Jun 2026
6 May 2026
5 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, install, testing and commisioning of DISTRIBUTION transformer mounted on massonry platform size as recommended by OEM stepdown , 11KV/0.415KV, Three Phase complying with IS:1180(part-1 2014), level-2 with latest ammendments, outdoor type, copper wound suitable for 50 Hz system of capacity 400 KVA , oil immersed naturally cooled delta connected on HT side and Star connected on LT side ,Vector Group Dyn11, provided with OFF load tap changer to vary secondary voltage from -7.5% to + 7.5% in steP of 2.5 %. . The transformers should be supplied with first filling of oil confirming to IS 335 .The transformer should have BOTH SIDE cable end box with neutral brought out complete all as directed by Engineer - in -Charge. Note :- Massonary plateform for Transformer shall be measured & paid separately. | 1 | Each | - | - |
| 1.01 | (a) Lifting lugs for transformer and tank. | - | - | - | - |
| 1.02 | (b) Earthing terminal rating and diagram plate. | - | - | - | - |
| 1.03 | (c ) Air release valve with explosion vent. | - | - | - | - |
| 1.04 | (d) Oil filling inlet pipe with plug. | - | - | - | - |
| 1.05 | (e) Drain outlet pipe with brass gate valve. | - | - | - | - |
| 1.06 | (f) Conservator tank with oil level indicator | - | - | - | - |
| 1.07 | (g) Silica jel breather | - | - | - | - |
| 1.08 | (h) First fill of oil upto level including conservator tank with fresh new oil conforming to IS335. | - | - | - | - |
| 1.09 | (i) Type of connection Delta/Star | - | - | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Tenderdocuments19.pdf
Tender Documents • 1.39 MB
BOQ_855338.xls
BOQ • 0.81 MB
AMDT19.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .