| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85,291Accepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹1.1 L+₹5,068.28 (5.02%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹86,000
EMD Value
₹2,000
Closing Date
13 Aug 2021, 12:00 pmClosed
Superintending Engineer
Aman Saheed Hamirpur
Electrification of Line Under EDD Hamirpur
2021_DVVNL_603845_2
46/SE/EDCH/2021-22
Open Tender
Electrical Works
Item Wise
Hamirpur
PQC
2 documents required · 2 mandatory
₹1,180
SE, EDC
₹2,000
Yes
25 Sept 2021
4 Aug 2021
13 Aug 2021
4 Aug 2021
13 Aug 2021
4 Aug 2021
4 Aug 2021 - 13 Aug 2021
Amount
Cartage of Poles from Store center Hamirpur from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labor, T & P carrier etc. required for proper completion of work.
(A) 8.5 M PCC Pole
Cartage of line material viz. Weasel conductor, Gi earth wire, cross arm, angle, channel, insulator, clamps and other line material from Store center any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labor, T & P and carrier etc. required for proper completion of work.
Erection of Single Support pole on Poles including the work of complete H.T. fittings as per RESSPO manual and as per direction of Engineer incharge including the cost of labor, T&P and carrier etc. required for proper completion of work.
(A) 8.5 M PCC Pole
Erection of Double pole on Poles including the work of complete H.T. fittings as per RESSPO manual and as per direction of Engineer incharge including the cost of labor, T&P and carrier etc. required for proper completion of work.
(A) 8.5 M PCC Pole
Grouting of pole as per RESSPO manual and as per direction of Engineer incharge including the cost of labor, T&P and carrier etc. required for proper completion of work.
Erection and grouting of stay set including the work of nuzzling etc. as per RESSPO manual. And also including the cost of all grouting material ,labour T&P etc.required for proper completion of work.
Fixing of Ear thing rod as per RESSPO manual and as per direction of supervising engineer.
Laying, sagging, stringing, binding and jumpring etc. of ACSR Weasel conductor new/old on the newly erected pole as per RESSPO manual and as per direction of supervising engineer.
Safely Cartage of Transformer from store centre , hamirpur from pit site of work through the Kaccha Pacca road including the work of its loading & unloading etc. the respective Ends. and also including the work of Dragging..
(B) 25 KVA Transformers
Installation of transformer of the pilinth in proper alignment and as per direction of supervising engineer/RESSPO manual.
(B) 25 KVA Transformers
Febrication of Cross Arm 11 Kv
Febrication of Top Channel
Febrication of T-off Channel
Febrication of Base Angle
Febrication of Dropper Channel
Tree Chooping
M/S SAMAN SPARE PARTS AND WORKSHOP
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .