Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9,875.03Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10,673.91+₹798.88 (8.09%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹11,761.27+₹1,886.24 (19.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹12,029.78+₹2,154.75 (21.8%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹12,065.29+₹2,190.26 (22.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
20 Apr 2026, 6:00 pmClosed
Executive Engineer PWD Division Gandoh
Executive Engineer PWD Division Gandoh
Stage Contract for Maintenance Repair of irrigation Malanoo Khul for the year 2026-27
2026_PWDJK_307560_2
E-NIT 03 of 2026-27
Open Tender
Civil Works
Percentage
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Stage Contract for Maintenance Repair of irrigati
₹20,000
24 Apr 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
20 Apr 2026
9 Apr 2026
9 Apr 2026 - 13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in All kinds of soil : | - | cum | - | - |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in Ordinary Rock | - | cum | - | - |
| 3 | Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations | - | cum | - | - |
| 4 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. | - | no | - | - |
| 5 | Supply of Empty Cement poly Bags | - | no | - | - |
| 6 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry | - | cum | - | - |
| 7 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) wet | - | cum | - | - |
| 8 | Shingle clearance from canals Weed clearance
From canals(including extraction of roots). | - | sqm | - | - |
| 9 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead | - | sqm | - | - |
| 10 | 12mm Cement plaster of mix (1:4) fine sand. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_997693.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .