| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC | L1 | Accepted-AOC Being a
lowest
tenderer | |
| 2 | L2₹19.1 L+₹24,350 (1.29%)Rejected-AOC VILLAGE TAPARIYAN BABINA CANTT BABINA JHANSI UP 284401 | BABINA | JHANSI | UP | 284401 | L2 | Rejected-AOC Not being a
lowest
tenderer | |
| 3 | L3₹19.8 L+₹95,940 (5.08%)Rejected-AOC HOUSE NO 164 SHASTRI NAGAR NEAR JAL NIGAM BABINA CANTT DISTT JHANSI UP | BABINA CANTT | JHANSI | UTTAR PRADESH | L3 | Rejected-AOC Not being a
lowest
tenderer | |
| 4 | L4₹20.0 L+₹1.2 L (6.10%)Rejected-AOC 1442 1 NANADANPURA BABINA CANTT TEHSIL DISTT JHANSI UP | BABINA | JHANSI | UP | L4 | Rejected-AOC Not being a
lowest
tenderer |
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
25 Aug 2018, 6:00 pmClosed
Garrison Engineer Babina Cantt
Garrison Engineer Babina Cantt
OUTSOURCING OF MAINT AND OPERATION OF ELECTRICAL INSTALLATIONS COMPRISING OF EQPTS SUCH AS VCBS AND OCBS AND CONNECTED WORKS AT KLP BUNDELA CAMP AT BABINA CANTT
2018_MES_207723_1
GE/BAB/23 OF 2018-19
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
BABINA AND BUNDELA CAMP
as per tender
8 documents required · 8 mandatory
₹500
Yes
Garrison Engineer Babina Cantt
₹42,000
Yes
6 Nov 2020
10 Aug 2018
31 Aug 2018
10 Aug 2018
25 Aug 2018
17 Aug 2018
Amount
Manning and operation of MES electric installations (33 KV Main Receiving Station) by deploying with 01 Electrician for successfully running/ functioning of complete HT/LT installations in each shift of 08 hours (01 Electrician x 03 shifts) incl sunday and holidays all as specified and directed by Engr-in-charge.
Manning and operation of MES electric installations (Under 11 KV Sub Stations at Tankodrome area) by deploying with 01 electrician (for successfully running/ functioning of complete HT/LT installation) in each shift of 08 hours (01 Electrician x 03 shifts) incl sunday and holidays all as specified and directed by Engr-in-charge.
Manning and operation of MES electric installations (Under 11 KV Sub Stations at SAF Camp Bundela) by deploying with 01 electrician (for successfully running/ functioning of complete HT/LT installation) in each shift of 08 hours (01 Electrician x 03 shifts) incl sunday and holidays all as specified and directed by Engr-in-charge. Notes : Quoted rates inrespect of Item Nos 1, 2 and 3 shall include the followings :- (a) The manning staff will enter the complaints of 11 KV sub stations and connected external electric nature and street/ security lights of indlividual responsibility areas at Babina Cantt in complaint register and prepare the complaint slip and will detail the electrician for attending complaint and will take the signature of users/JE E/M as completion of completaint on complaint slip then same should be pasted in record duly signed in complaint register after its rectification satisfactorily. (b) Stationary i.e. complaint slips, complaint register, tripping record register, handing taking over register etc will be provided by the contractor & no extra payment will be made by the department. (c) The detail record should be maintained for shut down of the respective areas on standard MES type format i.e. log sheet will be provided by the contractor with out any extra cost. (d) The manning staff will maintain the detail record of breakdown of power supply from UPPCL/MES and shut down/ breakdown due to MES over head lines maintain on log sheet register. (e) He will be responsible for keeping the receiving sub station, power house and all HT & LT installation neat & clean so that those are maintained in presentable condition. (f) Proper handing taking over will be done during shift change between manning staff. (g) In case any person becomes absent/ not found on duty or late coming / absent due to non issue of pass etc, the recovery will be made @ double the rate quoted by contractor for the day. The necessary passes provision for manning staffs from concerned authority be the responsibility of contractor. Remarks made by Engr-in-charge on log sheet in this regard will be final . (h) Some other urgent work viz roistering of electricity and attending complaint shall also be completed in time as given by Engr-in-Charge & No extra claim shall be given on this account . (j) He will also be responsible for timely switching OFF & ON street lights for the responsibility areas as per schedule of time. (k) If required, contractor will employ more manpower to carryout the duties assigned above no extra payment shall be given on this account. (l) All the manning staff shall bear uniform and shoe (Colour of the uniform shall be decided by the Engr in Charge) which shall be provided by the contractor at his own cost. (m) All tools, T & P, testing equipments, safety equipments such as gloves, safety belt, gum boot, bamboo ladders, discharge rod etc shall be provided by the contractor. The cost for this provision is deemed to be included in the quoted rates. (n) The tradesman employed should be ITI passed or having three years of work experience/ electrician license from state Govt.and three year experience having good knowledge of operation, Maint & repair of HT and LT over head electric lines transformers, OCB/ VCBs etc and will have to produce certificate to Engr-in-charge. (p) The installation/machinery incl buildings shall be handed over to contractor in working conditions at the time of commencement of work and the contractor shall replace / repair the defective spare/ equipment become unserviceable due to improper operation at his own arrangement. On completion of contract, the contractor will hand over all E/M plants/machinery and bldg assets under manning contract to the Deptt. any loss/damage /deficiency shall be made good or regularised by the contractor.
M & L for providing highly skilled mechanic/specialist in electric HT breakers line for carrying out repair/servicing of SMC 1, MWF 1, HWX 1, SGB 1 mechanism, calibration of HT VCB by taking out trolley, dismantling mechanical system decarburizing of all parts using CRC-2 - 26 spray, checking of all fixed and moving parts, tightening of all nut & bolts dressing of contract by using emery paper for fine/smooth contact, tightening of all connections, checking of alignment for proper smooth operation of breaker, checking of ON/OFF operation with setting of buffer gap adjustment, contract/travel contact alignments, roller gap, hard or right setting of breaker, greasing of all moving mechanism, replacement of unserviceable spares, metering equipments etc, reconnecting & testing on connected load complete all as directed in instruction manual of VCBs complete all as specified and as directed by Engr in charge. Note : Any spares required at site measured and paid separately under respective items of BOQ.
S&F in replacement of unserviceable current transformer of 1 KV VCB panel indoor, comprising of 3 Nos single phase resin cast CTs of suitable ratio and class with suitable VA burden and accuracy suitable for protection & metering fixing in existing VCB panel and connection complete all as specified and as directed.
S&F in replacement of male contact of 11 KV vacuum circuit breaker of existing make and size complete all as specified and as directed.
S&F in replacement of female contact of 11 KV vacuum circuit breaker of existing make and size complete all as specified and as directed.
S&F in replacement of unserviceable bus bar spout suitable to fix with male contact of 11 KV vacuum circuit breaker of existing make and size complete all as specified and as directed.
S & F in replacement of unserviceable/faulty gear of trolley from 11 KV vacuum circuit breaker of existing make and complete all as specified and as directed by the Engr-in-Charge.
S&F in replacement ON Push button complete all as specified & directed
S&F in replacement of OFF push button complete all as specified & directed
S&F in replacement of indicator lamp as per sample complete all as specified & directed
S&F in replacement of OFF load isolator with earth switch mechanism complete all as specified & directed
S&F in replacement of Z type lever of OFF push button complete all as specified & directed
S&F in replacement of Z type lever of ON push button complete all as specified & directed
S&F in replacement of trip coil only Y1 control volt 24 VDC complete all as specified & directed
S&F in replacement of close coil only Y2 control volt 24 VDC complete all as specified & directed
S&F in replacement of spring charging motor with gear for suitable for 24 VDC complete all as specified & directed
S&F in replacement of standard spring charging motorized kit for V module complete all as specified & directed
S&F and testing in replacement of existing vaccum interrupter suitable for 400 Amp 11 KV VCB of make - crompton greaves complete all as specified and directed.
S&F in replacement of digital voltmeter of existing type and size complete all as specified and directed.
M&L in replacement of digital ammeter of existing size and type complete all as specified and directed.
S&F in replacement PVC flat weather proof cable twin core 10 Sqmm stranded aluminium cable complete all as specified and directed.
M&L for cutting of tree branches upto 2 mtr away from the over head line including removing outside the MOD land complete all as directed.
M & L for cutting of shrubs and unwanted wild growth including removal of roots completely and levelling the area to a finished surface and removal of debris at electric supply installations complete all as specified and directed
M/S Kharya Associates
m/s bobby enterprises
M/S SHIVA TRADERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .