Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A355 BALAJI BHAWAN PLOT NO 42 A SECTOR 11 CBD BELAPUR NAVI MUMBAI 400614 MAHARASHTRA | NAVI MUMBAI | THANE | MAHARASHTRA | 400614 | Admitted-Finance |
| 2 | Admitted-Finance A 8 MOHAN CO OPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 INDIA | NEW DELHI | NEW DELHI | DELHI | 110044 | Admitted-Finance |
| 3 | Admitted-Finance A 21 BEHIND LIONS CLUB SCHOOL III PHASE THIRU VI KA INDUSTRIAL ESTATE GUINDY CHENNAI 600 032 | CHENNAI | TAMIL NADU | 600001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance HIG 6152 LEVEL I AND II KAMARAJAR ROAD AYAPAKKAM TIRUVALLUR TAMIL NADU 600077 | THIRUVALLUR | TAMIL NADU | 600077 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
29 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director (Projects)
Admin Building, Chennai Metro Rail Limited
Forecasting of Noise and Vibration levels in the proposed Chennai Metro Rail Phase II- Corridor -3,4 and 5 during Construction and Operation Phases using Software Modelling in accordance with the Federal Transit Administration (FTA) Guidelines
2020_CMRL_571603_1
CMRL/CON/Phase2/NV/Cor3-4-5/20
Open Tender
Civil Works
Works
45 days
Chennai
Please refer Tender documents.
9 documents required · 9 mandatory
₹8,000
CMRL BANK ACCOUNT
₹30,000
Admin Building CMRL
4 Aug 2020
16 Jul 2020
30 Jul 2020
16 Jul 2020
29 Jul 2020
24 Jul 2020
16 Jul 2020 - 21 Jul 2020
17 Jul 2020
60 days
NOTE: 1. Evaluation will be done by excluding provisonal sum and GST Amount 2. GST to be quoted @rate of 18% 3. This being percentage rate tender, bidder need to be fill (M14) at par/below/above% 4.Bidder need to fill (U14) if discount any in % 5. The bid price shall be net of input tax credit availed by the bidder i.e the base price shall not have any GST component in it. In effect,the clause 171 of GST, that is the Anti-profittering rule shall be adhered to. A self declaration from the bidder on clause 171, shall be attached with invoice. the output GST paid by the bidder shall be reimbursed by Chennai Metro Rail Limited on production of documentary evidence.
SUMMARY OF PRICE BID
Description of Work / Item(s)
Amount
Schedule-A- DSR Items - Forecasting of Noise and Vibration levels in the proposed Chennai Metro Rail Phase II- Corridor - 4 during Construction and Operation Phases using Software Modelling in accordance with the Federal Transit Administration (FTA) Guidelines”
Noise Modelling
i) To collect the necessary information associated with the area under study and the technical information which includes: land usage, types of building in the study area, geographical information etc… ii) To monitor the ambient noise levels at 10 sensitive receptors identified by the Environmental Consultant iii) To prepare and submit the noise measurement plan. iv) Railway induced noise prediction modelling: Post process the recorded noise levels to predict and analysis using acoustic simulations (software modelling) with respect to monitoring location along each proposed metro rail corridor during the construction and operation phase of the project.(Exterior noise emission at both sides of the metro alignment has to be computed) v) To identify the noise impact assessment along the alignment. vi) Mapping areas where mitigation measures are required. vii) To provide noise abatement solutions in the mapped areas
Vibration Modelling
i) To collect the necessary information associated with the area under study and the technical information which includes: land usage, types of building in the study area, geographical information etc… ii) Railway induced ground-borne vibration prediction modelling: Post process the baseline data provided by the client to predict and analysis using vibration simulation models in accordance with FTA guidelines along each proposed metro rail corridor during the construction and operation phase of the project. iii) To identify the vibration impact assessment along the alignment. iv) Mapping areas where mitigation measures are required. v) To provide vibration abatement solutions in the mapped areas
Description of Work / Item(s)
Amount
Schedule-B- DSR Items - Forecasting of Noise and Vibration levels in the proposed Chennai Metro Rail Phase II- Corridor - 3 during Construction and Operation Phases using Software Modelling in accordance with the Federal Transit Administration (FTA) Guidelines”
Noise Modelling
i) To collect the necessary information associated with the area under study and the technical information which includes: land usage, types of building in the study area, geographical information etc… ii) To monitor the ambient noise levels at 10 sensitive receptors identified by the Environmental Consultant iii) To prepare and submit the noise measurement plan. iv) Railway induced noise prediction modelling: Post process the recorded noise levels to predict and analysis using acoustic simulations (software modelling) with respect to monitoring location along each proposed metro rail corridor during the construction and operation phase of the project.(Exterior noise emission at both sides of the metro alignment has to be computed) v) To identify the noise impact assessment along the alignment. vi) Mapping areas where mitigation measures are required. vii) To provide noise abatement solutions in the mapped areas
Vibration Modelling
i) To collect the necessary information associated with the area under study and the technical information which includes: land usage, types of building in the study area, geographical information etc… ii) Railway induced ground-borne vibration prediction modelling: Post process the baseline data provided by the client to predict and analysis using vibration simulation models in accordance with FTA guidelines along each proposed metro rail corridor during the construction and operation phase of the project. iii) To identify the vibration impact assessment along the alignment. iv) Mapping areas where mitigation measures are required. v) To provide vibration abatement solutions in the mapped areas
Description of Work / Item(s)
Amount
Schedule-C- DSR Items - Forecasting of Noise and Vibration levels in the proposed Chennai Metro Rail Phase II- Corridor - 5 during Construction and Operation Phases using Software Modelling in accordance with the Federal Transit Administration (FTA) Guidelines”
Noise Modelling
i) To collect the necessary information associated with the area under study and the technical information which includes: land usage, types of building in the study area, geographical information etc… ii) To monitor the ambient noise levels at 10 sensitive receptors identified by the Environmental Consultant iii) To prepare and submit the noise measurement plan. iv) Railway induced noise prediction modelling: Post process the recorded noise levels to predict and analysis using acoustic simulations (software modelling) with respect to monitoring location along each proposed metro rail corridor during the construction and operation phase of the project.(Exterior noise emission at both sides of the metro alignment has to be computed) v) To identify the noise impact assessment along the alignment. vi) Mapping areas where mitigation measures are required. vii) To provide noise abatement solutions in the mapped areas
Vibration Modelling
i) To collect the necessary information associated with the area under study and the technical information which includes: land usage, types of building in the study area, geographical information etc… ii) Railway induced ground-borne vibration prediction modelling: Post process the baseline data provided by the client to predict and analysis using vibration simulation models in accordance with FTA guidelines along each proposed metro rail corridor during the construction and operation phase of the project. iii) To identify the vibration impact assessment along the alignment. iv) Mapping areas where mitigation measures are required. v) To provide vibration abatement solutions in the mapped areas
Pollucare Engineers India Pvt. Ltd.
AIMIL LIMITED
N V Dynamics
ABC TECHNO LABS INDIA PRIVATE LIMITED
Pollucare Engineers India Pvt. Ltd.
AIMIL LIMITED
N V Dynamics
ABC TECHNO LABS INDIA PRIVATE LIMITED
Pollucare Engineers India Pvt. Ltd.
AIMIL LIMITED
N V Dynamics
ABC TECHNO LABS INDIA PRIVATE LIMITED
Pollucare Engineers India Pvt. Ltd.
AIMIL LIMITED
N V Dynamics
ABC TECHNO LABS INDIA PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .