| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.4 L+₹2.3 L (15.0%)Rejected-Finance | ₹17.4 L+₹2.3 L (15.0%) | L2 | Rejected-Finance L2 |
| 3 | L3₹17.6 L+₹2.5 L (16.8%)Rejected-Finance | ₹17.6 L+₹2.5 L (16.8%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Document Incomlete |
| Sl No | Description | Qty | Unit | MS ANIL KUMAR CONSTRUCTION L1 | Nepal Singh Contractor L3 | M/S A.P.SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required level and slope also including Carriage beyond 3.0 KM up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer -in-Charge. | 865.5 | cum | 250 ₹2,16,375 Lowest | 300.8 ₹2,60,342.4 | 296 ₹2,56,188 |
| 2.00 | Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M. | 110 | cum | 110 ₹12,100 | 110 ₹12,100 | 108 ₹11,880 Lowest |
| 3.00 | Cement concrete in 1:2:4 including all cost of material, labour , T&P etc. for completion of work. | 67 | cum | 5,500 ₹3,68,500 Lowest | 5,964.85 ₹3,99,644.95 | 5,875 ₹3,93,625 |
| 4.00 | Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work. | 0.28 | cum | 5,000 ₹1,400 | 4,936.84 ₹1,382.32 | 4,863 ₹1,361.64 Lowest |
| 5.00 | Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work. | 64 | cum | 5,500 ₹3,52,000 Lowest | 6,520.6 ₹4,17,318.4 | 6,423 ₹4,11,072 |
| 6.00 | First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work. | 44 | cum | 5,091 ₹2,24,004 Lowest | 5,352.8 ₹2,35,523.2 | 5,273 ₹2,32,012 |
| 7.00Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. | ||||||
| 7.01 | For CC work | 91 | sqm | 244 ₹22,204 | 245 ₹22,295 | 241 ₹21,931 Lowest |
| 7.02 | For RCC work | 24 | sqm | 466 ₹11,184 | 468 ₹11,232 | 461 ₹11,064 Lowest |
| 8.00 | Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work. | 13 | cum | 6,869 ₹89,297 | 6,867.6 ₹89,278.8 | 6,765 ₹87,945 Lowest |
Tender Value
₹17.6 L
EMD Value
₹35,000
Closing Date
11 Feb 2025, 2:00 pmClosed
EXECUTIVE ENGINEER
M.G.C.C.D. - 7 BIJNOR
Construction of Canal From km. 1.700 to Km. 1.850 and V.R.B. Cum Fall at Km. 1.830 of Fatehpur Mr.(Lot-03)
2025_UPIDC_1001451_3
03/EE/2024-25
Open Tender
Civil Works - Canal
Item Rate
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹35,000
14 Jul 2026
4 Feb 2025
11 Feb 2025
4 Feb 2025
11 Feb 2025
4 Feb 2025
Amount
Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required level and slope also including Carriage beyond 3.0 KM up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer -in-Charge.
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:2:4 including all cost of material, labour , T&P etc. for completion of work.
Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work.
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work.
For CC work
For RCC work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work.
200 mm thick Dry brick pitching laid dry filling joints including all cost of material, labour and T&P etc. all complete.
Providing and laying coarse sand under C.C. Block including all cost of material & labour & T&P etc.
Providing and laying 10-40 graded gravel under C.C. Block including all cost of material & labour & T&P etc.
Supply and laying Tarfelt sheet in two layers on Bed Block including all cost of material, labour and T&P etc. complete.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete.
Earth work in filling in Ramp including ramming and dressing the surface to be required level and slope also including carriage 3 KM up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete.
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete.
Making expansion/construction joints in c.c. roads including approved filler materials in joints. Including all cost of material,labour and T&P etc. for proper completion of work.
M/S A.P.SINGH CONTRACTOR (BID ID -4933692)
Nepal Singh Contractor (BID ID -4934321)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .