Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 CrAccepted-AOC PANCHAK TENT KARWA SHRI SABHA MALLAN GARIR MAHARIYA JILA ROAD | BHIND | BHIND | MADHYA PRADESH | ₹40.5 Cr | L1 | Accepted-AOC sanjay sharma L1 |
| 2 | L2₹46.9 CrRejected-Finance AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | ₹46.9 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹47.4 Cr
EMD Value
₹24 L
Closing Date
28 Jul 2023, 5:30 pmClosed
Chief Engineer
Chief Engineer Indira Sagar Project (Canals) Sanawad Distt.Khargone
Construction of Bank protection work 07 Nos. Villages Group-IV of Tehsil - Budni, District- Sehore at Right Bank of Narmada River on Turn Key basis sa per scope of work.
2023_NVDA_285811_1
02/G/2023-24/
Open Tender
Civil Works - Bridges
325 days
Sehore
Please refer Tender documents.
5 documents required · 5 mandatory
₹50,000
₹24 L
31 Oct 2023
20 Jun 2023
31 Jul 2023
20 Jun 2023
28 Jul 2023
20 Jun 2023
Amount
GHAT & ALLIED WORKS DISTRICT SEHORE, GROUP-IV: Construction of (i) Ghat & RCC Retaining Wall at Village-Nandner, (ii) Ghat, RCC Retaining Wall and CC Approach Road at Village-Sardarnagar, Sudaniya, Baneta, Gwadia & Maukala (iii) RCC Retaining Wall at Village-Shahganj including detail Survey and investigation with expert suggestion design and drawings with vetting from NIT/IIT. Supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to complete entire work in 11 Months including maintenance of all structures for 3 years after completion as directed by Engineer-in-Charge.
GHAT & ALLIED WORKS DISTRICT SEHORE, GROUP-IV: Construction of (i) Ghat & RCC Retaining Wall at Village-Nandner, (ii) Ghat, RCC Retaining Wall and CC Approach Road at Village-Sardarnagar, Sudaniya, Baneta, Gwadia & Maukala (iii) RCC Retaining Wall at Village-Shahganj including detail Survey and investigation with expert suggestion design and drawings with vetting from NIT/IIT. Supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to complete entire work in 11 Months including maintenance of all structures for 3 years after completion as directed by Engineer-in-Charge.
LCC PROJECTS PVT. LTD.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid