| 1.00 | 1.Repairs to Keelavannam PUE School (1 class room) in Karuppilakattalai Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete | 40.22 | Sqm | 15 ₹603.30 | 9 ₹361.98 |
| 2.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 40.22 | Sqm | 315 ₹12,669.30 | 308.8 ₹12,419.94 |
| 3.00 | Provision for Name board | 1 | Nos | 3,000 ₹3,000 | 3,000 ₹3,000 |
| 4.00 | 2.Repairs to Karu.Senapathi PUM School (2 Class room) in Melakaruppur Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete | 109.17 | Sqm | 15 ₹1,637.55 | 9 ₹982.53 |
| 5.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 109.17 | Sqm | 315 ₹34,388.55 | 308.8 ₹33,711.70 |
| 6.00 | Provision for Name board | 1 | Nos | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 7.00 | 3.Repairs to Oriyur PUE School (Two class room) in Pungankuzhi Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete | 109.17 | Sqm | 15 ₹1,637.55 | 9 ₹982.53 |
| 8.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 109.17 | Sqm | 315 ₹34,388.55 | 308.8 ₹33,711.70 |
| 9.00 | Provision for Name board | 1 | Nos | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 10.00 | 4.Repairs to Edayatthankudi PUM School (3 Class room) in Edayathankudi Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete | 167.36 | Sqm | 15 ₹2,510.40 | 9 ₹1,506.24 |
Tender Value
₹2.3 L
EMD Value
₹2,330
Closing Date
12 Dec 2025, 5:00 pmClosed
The Block Development Officer (VP)
Panchayat Union, Ariyalur
Repairs of School building 5 Nos in Package No.1 at Karuppilakattalai, Melakaruppur, Pungankuzhi and Edayathankudi Panchayats under PUGF 2025-26
2025_RDTN_631452_1
R.C.NO.A4/3120/2025, Date.14.11.2025
Open Tender
Civil Works - Others
30 days
Ariyalur
As per tender documents
5 documents required · 5 mandatory
₹0
₹2,330
14 Jan 2026
12 Dec 2025
12 Dec 2025
12 Dec 2025
12 Dec 2025
12 Dec 2025
Amount
1.Repairs to Keelavannam PUE School (1 class room) in Karuppilakattalai Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Provision for Name board
2.Repairs to Karu.Senapathi PUM School (2 Class room) in Melakaruppur Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Provision for Name board
3.Repairs to Oriyur PUE School (Two class room) in Pungankuzhi Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Provision for Name board
4.Repairs to Edayatthankudi PUM School (3 Class room) in Edayathankudi Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Provision for Name board
5.Repairs to Edayatthankudi PUM School (2 Class room) in Edayathankudi Panchayat Clean removal of cement plaster from walls including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Shuruthi Engineering (BID ID -1532686)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
TechnicalBid1.pdf
Tender Documents • 0.34 MB
PriceBid1.pdf
Tender Documents • 0.23 MB
BOQ_755263.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid