EXECUTIVE ENGINEER PHE GROUND WATER DIV SRINAGAR
EXECUTIVE ENGINEER PHE GROUND WATER DIV SRINAGAR
Construction of Production Tube Well W.S.S Jaggerpora Nagri Handwara District kupwara.
2020_PHE_105157_1
NIT No -PHE/GWDS 29 of 09/2020 Dated 23 -09-2020
Open Tender
Drilling Works
Item Rate
30 days
KUPWARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
EXECUTIVE ENGINEER PHE GROUND WATER DIV SRINAGAR
₹54,000
16 Oct 2020
24 Sept 2020
9 Oct 2020
24 Sept 2020
7 Oct 2020
24 Sept 2020
24 Sept 2020 - 7 Oct 2020
Amount
PART"A" Drilling/ boring of exploratory test bore well at mentioned site for construction of production tube wells. The job shall be inclusive of all logistic support in terms of men, machinery and stores at site. Job includes providing, fitting & lowering of 125 mm Dia Heavy Duty MS Pipe as casing of minimum thickness 5.4 mm for the well. The charges on account of loading/ unloading, shifting of men & machinery shall be arranged by the firm. The strata sampling is to be carried out along with drilling and the samples collected in the transparent plastic boxes duly labeled. The exploratory bore has to be cased simultaneously vide drilling in case of ODEX drilling or cased at the completion of drilling in open drilling. Sample collection of strata to be collected for examination. After every 10 ft. The specifications of the bore well shall be as under; i. Max depth of the bore ……. 150 M The inspection at every stage shall be carried out by departmental experts to determine the aquifer zones. The construction of Production well shall be decided after analyzing the litho-logy of the test bore. This shall be duly authenticated by the Site engineers/ drilling staff including the contracting agency as well. The decision for construction of full-fledged production Bore hole shall be then taken with proper ascertaining of quality and quantity of water.
Description of Work / Item(s)
Amount
PART A (ODEX) Drilling of a 200/250 mm dia Bore hole with ODEX attachment in all kind of Soils, Boulders, Hard-rock, saturated Soils, the drilling includes the cost of suitable casing Shoe, all consumables, water, fuel, lubricants and other accessories complete in all respect. The job includes Lowering of departmentally supplied well assembly i.e the screen and blind M.S pipes of 250/200mm diameter. As per the drawing issued by the site Engineers in accordance with the soil strata and the departmental requirement. (Screen/casing pipes shall be provided by the department FOR stores). The job includes the cost of face to face welding of casing assembly along the beveled edges/areas and strengthening of welding joints by additional ribs/supports to ensure the stout welding joint. The job includes the cost of pointed bail plug required to be fabricated and fitted at the bottom of the well assembly.
Development of tube well with back wash method with Air Compressor of minimum capacity 1000CFM (300 PSI air delivery system) with pumping pipe of minimum 100 mm dia. and air line of minimum 65 mm dia till well is thoroughly developed as per clause 4.2 of IS 11189 code 1985 with up to date amendments if any complete in all respects as per the direction of the Engineer in charge, for a minimum period of at least 40 hours. b) Development of tube well be continuous over pumping method with the submersible pump of suitable capacity not less than double the discharge established by the compressor. free of all sediments as per IS 11189 code 1985 with up to date amendments if any, for a minimum period of at least 30 hours. the draw down and the discharge to be established by running the pump continuously for 8houres in presence of the officer of the department not less than the rank of AEE. The complete well thus constructed is to be handed over to the territorial mechanical division for harnessing. Completion of test for yield to ensure that the quality of water is as laid down in IS-10500; 1983. the grouting & sealing of the tube well needs to be done to ensure safe sanitary conditions as per IS-2800; 1991. An apron around the well (mix shall be M10 grade) & slopping away from it to protect the well from pollution has to be constructed to prevent contaminated water flowing back into it. the casing pipe is to be anchored within the apron by welding ISMC-150 steel bracing with crates & sufficient welding area 2 mtr length each bracing embedded within the apron (4 bracing). the complete well thus constructed is to be handed over to the territorial mechanical division for harnessing. i. Apron Size= 2.5 mtr × 2.5 mtr. ii. Apron depth at skirt = 300 mm. iii. Apron depth at well casing= 350 mm.
Description of Work / Item(s)
Amount
PART "B" (GRAVEL PACKED) Artificial Gravel Packed Production Well: Construction of production well based on results of exploration data by a suitable method of drilling viz Direct circulation method / Reverse circulation method up to the desired depth as per the relevant IS codes of practice for construction and testing of tube wells / Bore wells, with time to time amendments in all kinds of soils , Boulders , Rocks , Collapsible strata , saturated soils etc with the requisite accessories required there of including Bentonite mud , foam , water Lubricants etc. The drilled bore hole is reamed up for open drilling and completed to the desired depth. Dia of Well …….. ≥ 500/550 mm
Lowering of departmentally supplied well assembly i.e the screen and blind M.S pipes of 300/250mm diameter. As per the drawing issued by the site Engineers in accordance with the soil strata and the departmental requirement. (Screen/casing pipes shall be provided by the department FOR stores). The job includes the cost of face to face welding of casing assembly along the beveled edges/areas and strengthening of welding joints by additional ribs/supports to ensure the stout welding joint. The job includes the cost of pointed bail plug required to be fabricated and fitted at the bottom of the well assembly.
The annular space between the casing pipe and the well surface has to be filled with a gravel pack to act as a filter medium. The gravel, to be used in tube well, is specified in Relevant IS Codes. (Quantity shall be subject to the actual measurements at site)
Development of tube well with back wash method with Air Compressor of minimum capacity 1000CFM (300 PSI air delivery system) with pumping pipe of minimum 100 mm dia. and air line of minimum 65 mm dia till well is thoroughly developed as per clause 4.2 of IS 11189 code 1985 with up to date amendments if any complete in all respects as per the direction of the Engineer in charge, for a minimum period of at least 40 hours. b) Development of tube well be continuous over pumping method with the submersible pump of suitable capacity not less than double the discharge established by the compressor. free of all sediments as per IS 11189 code 1985 with up to date amendments if any, for a minimum period of at least 30 hours. the draw down and the discharge to be established by running the pump continuously for 8houres in presence of the officer of the department not less than the rank of AEE. The complete well thus constructed is to be handed over to the territorial mechanical division for harnessing. Completion of test for yield to ensure that the quality of water is as laid down in IS-10500; 1983. the grouting & sealing of the tube well needs to be done to ensure safe sanitary conditions as per IS-2800; 1991. An apron around the well (mix shall be M10 grade) & slopping away from it to protect the well from pollution has to be constructed to prevent contaminated water flowing back into it. the casing pipe is to be anchored within the apron by welding ISMC-150 steel bracing with crates & sufficient welding area 2 mtr length each bracing embedded within the apron (4 bracing). the complete well thus constructed is to be handed over to the territorial mechanical division for harnessing. i. Apron Size= 2.5 mtr × 2.5 mtr. ii. Apron depth at skirt = 300 mm. iii. Apron depth at well casing= 350 mm.
M/s Rehmat Bore Wells
M/S JK WATER MISSION
M/s Rehmat Bore Wells
M/S JK WATER MISSION
M/s Rehmat Bore Wells
M/S JK WATER MISSION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .