Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
18 Sept 2026, 3:00 pm
CPO-WORKS & SERV.
Refer tender docuemtns for further information regarding tender, specifications, terms and conditions, etc.
2600027826-HD-09050
5100027826
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹2.4 L
28 Aug 2026
28 Aug 2026
18 Sept 2026
18 Sept 2026
27 Aug 2026 - 11 Sept 2026
31 Aug 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Excavation Upto 1.5m | Excavation Upto 1.5m — EXCAVATION UPTO 1.5 M DEPTH: EXCAVATION IN ALL TYPES OF SOIL, FOR FOOTINGS, STEPS, PLINTH BEAMS, EQUIPMENT FOUNDATIONS, PILE CAPS, DRAINS, TRENCHES, MANHOLES, UNDERGROUND TANKS, ETC INCLUDING SHORING STRUTTING AS REQUIRED AS PER SITE CONDITION, DEWATERING WHERE REQUIRED (UNTIL FOUNDATION WORK IS COMPLETE). ITEM ALSO INCLUDES CARTING, STACKING IF REQUIRED BY HPCL EIC, SPREADING, LEVELLING AND COMPACTING/CONSOLIDATING SURPLUS MATERIALS WITHIN PLANT PREMISES AT UNOBJECTIONABLE AREA OR AS PER INSTRUCTION OF HPCL EIC. | - | cubic meter |
| 2 | Excavation Upto 1.5m | Excavation Upto 1.5m — "EXCAVATION FOR FOUNDATION UPTO REQUIRED IN HARD ROCK AND EXCAVATION SHALL BE DONE BY CHISELLING/PNEUMATIC DRILLING/TRACTOR/TRAILER MOUNTED JACK HAMMERS, AS PER IS STANDARD FOR HARD ROCK. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING AS REQUIRED AS PER SITE CONDITION, BACKFILLING AFTER THE CONSTRUCTION OF FOUNDATION, TRENCHES/PLINTH BEAM ETC COMPACTING BY THE SIDE OF THE FOUNDATION INCLUDING SPREADING, WATERING AND COMPACTION AND STACKING THE EXCAVATED DEBRIS AND STACK MEASUREMENT SHALL BE TAKEN APPLYING 50% DEDUCTION FOR VOIDS; HANDLING AND LIFTINGS AND TRANSPORTATION TO INSIDE THE PLANT BOUNDARY, AS DIRECTED BY THE HPCL ENGINEER IN CHARGE, COMPLETE. THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION WITH APPLICABLE RATE FOR DIFFERENT DEPTHS. EXCAVATION IN HARD ROCK UPTO 1.5 MT BLASTING WILL NOT BE PERMITTED. SCOPE INCLUDES OBTAINING APPROVAL FROM MINING DEPARTMENT/APPLICABLE DEPARTMENTS." | - | cubic meter |
| 3 | Excavation 1.5m Upto | Excavation 1.5m Upto — "EXCAVATION UP TO A DEPTH OF 3 METER ANY TYPE OF SOIL EXCLUDING HARD ROCK FOR FOUNDATION, PLINTH BEAM, TRENCHES, PAVEMENTS ETC. INCLUDING DRESSING THE SIDES, LEVELING, GRADING, RAMMING OF BOTTOM, BAILING OUT WATER IF ENCOUNTERED, SHORING, STRUTTING, BACK FILLING AND COMPACTING THE EXCAVATED EARTH IN THE SIDES OF FOUNDATIONS. RATE TO INCLUDE CARTING AWAY SURPLUS EXCAVATED EARTH, SPREADING, LEVELING AND COMPACTING, INSIDE OR OUTSIDE THE HPCL PREMISES TO ANUNOBJECTIONABLE PLACE ALL COMPLETE AS PER DIRECTION BY ENGINEER-IN-CHARGE. PAYMENT IS TO BE MADE AS PER PLAN DRAWING." | - | cubic meter |
| 4 | Excavation 1.5m Upto | Excavation 1.5m Upto — HARD ROCK EXCAVATION DEPTH 1.5 TO 3 METER WITH LEAD 300 METER: EXCAVATION IN HARD ROCK FROM DEPTH MORE THAN 1.5 METER AND UPTO 3 METER AND LEAD UP TO 300 METER, SCOPE INCLUDES MARKING, REMOVAL OF VEGETATION, DE-WATERING, CARRYING, CARTING, MAKING HEAPING AT DESIGNATED PLACES WITHIN PLANT PREMISES, MACHINERY, EQUIPMENT, INSTRUMENT, TOOLS, TACKLES, MANPOWER, SUPERVISION, DOCUMENTATION AS PER SPECIFICATION, ENGINEERING PRACTICES AND DIRECTION OF OWNER. | - | cubic meter |
| 5 | Excavation > 3m Dept | Excavation > 3m Dept — EXCAVATION BEYOND THE DEPTH OF 3 METER IN ANY TYPE OF SOIL EXCLUDING HARD ROCK FOR FOUNDATION, PLINTH BEAM, TRENCHES, PAVEMENTS ETC. INCLUDING DRESSING THE SIDES, LEVELING, GRADING, RAMMING OF BOTTOM, BAILING OUT WATER IF ENCOUNTERED, SHORING, STRUTTING, BACK FILLING AND COMPACTING THE EXCAVATED EARTH IN THE SIDES OF FOUNDATIONS. RATE TO INCLUDE CARTING AWAY SURPLUS EXCAVATED EARTH, SPREADING, LEVELING AND COMPACTING, INSIDE OR OUTSIDE THE HPCL PREMISES TO AN UNOBJECTIONABLE PLACE ALL COMPLETE AS PER DIRECTION BY ENGINEER-IN-CHARGE. PAYMENT IS TO BE MADE AS PER PLAN DRAWING. | - | cubic meter |
| 6 | Excavation > 3m in H | Excavation > 3m in H — HARD ROCK EXCAVATION DEPTH MORE THAN 3 METER WITH LEAD 300 METER: EXCAVATION IN HARD ROCK FOR DEPTH MORE THAN 3 METER AND LEAD UP TO 300 METER, SCOPE INCLUDES MARKING, REMOVAL OF VEGETATION, DE-WATERING, CARRYING, CARTING, MAKING HEAPING AT DESIGNATED PLACES WITHIN PLANT PREMISES, MACHINERY, EQUIPMENT, INSTRUMENT, TOOLS, TACKLES, MANPOWER, SUPERVISION, DOCUMENTATION AS PER SPECIFICATION, ENGINEERING PRACTICES AND DIRECTION OF OWNER. | - | cubic meter |
| 7 | Dewatering Excav Tre | Dewatering Excav Tre — DEWATERING EXCAVATED SURFACE/TRENCHES AND POOLS OF WATER IN THE AREAS BY USING PUMPS AND OTHER DEVICES, INCLUDING DISPOSING OF THE WATER TO A SAFE DISTANCE AS DIRECTED BY USING 3 HP TO10 HP PUMPS, WITH ALL CONSUMABLE LABOUR, REQUIRED TOOLS ETC. | - | Hour |
| 8 | Debris Disposal With | Debris Disposal With — DEBRIS DISPOSAL WITHIN PREMISE: CARRIAGE OF DEBRIS COMPRISING OF EARTH, MURUM, SAND CRUSHED METAL, STONE DUST ETC. AND DISPOSING THE SAME WITHIN COLONY PREMISES INCLUDING LOADING/UNLOADING LEVELING AT BOTH THE PLACES. IN A TRUCK CAPACITY OF TRUCK-2 BRASS. | - | Each |
| 9 | Debris Disposal Out | Debris Disposal Out — DISPOSAL OF BUILDING RUBBISH/ MALBA / SIMILAR UNSERVICEABLE, DISMANTLED OR WASTE MATERIALS BY MECHANICAL MEANS, INCLUDING LOADING, TRANSPORTING, UNLOADING TO APPROVED MUNICIPAL DUMPING GROUND OR AS APPROVED BY ENGINEER-IN-CHARGE, BEYOND 50 M INITIAL LEAD, FOR ALL LEADS INCLUDING ALL LIFTS INVOLVED. | - | cubic meter |
| 10 | Cleaning with Jet Pu | Cleaning with Jet Pu — PROVIDING AND APPLYING SERVICE OF WATER CLEANING WITH JET PUMP INCLUDING MAN POWER AND ALL NECESSARY TOOLS AS PER THE INSTRUCTIONS OF ENGINEER-IN-CHARGE. | - | Hour |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600027826-HD-09050.pdf
TENDER_DOCUMENT • 22.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].