| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | L1 | Accepted-AOC AOC DONE | |
| 2 | L2₹15.8 L+₹74,868.80 (4.96%)Rejected-Finance R O VILLAGE SHANAN P O A G SHIMLA THE DISTT SHIMLA | L2 | Rejected-Finance Non-Responsive due to L2 Bidder | |
| 3 | L3₹16.2 L+₹1.1 L (7.15%)Rejected-Finance | L3 | Rejected-Finance Non-Responsive due to L3 Bidder | |
| 4 | L4₹17.1 L+₹2.0 L (13.1%)Rejected-Finance VILLAGE P O HARIPUR SANDHOLI TEHSIL BADDI DISTT SOLAN HP | SOLAN | HIMACHAL PRADESH | 171102 | L4 | Rejected-Finance Non-Responsive due to L4 Bidder | |
| 5 | L5₹17.1 L+₹2.0 L (13.3%)Rejected-Finance | L5 | Rejected-Finance Non-Responsive due to L5 Bidder |
Tender Value
₹14.2 L
EMD Value
₹28,500
Closing Date
9 Jul 2021, 11:00 amClosed
Executive Engineer HP PWD Division Nalagarh
Executive Engineer HP PWD Division Nalagarh
C/o Link road to village Pahari Chikni G.P. Bowasni 0/0 to 3/500 (SH- F/C Km 0/0 to 1/500 and C/o 900mm dia RCC Hume Pipe Culvert at RD 0/060, 0/260, 0/690, 0/980, 1/160, 1/330 and 1/485).
2021_PWD_49290_1
TA-2901-05 date- 16.06.2021
Open Tender
Civil Works
Item Rate
180 days
Nalagarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹28,500
3 Jan 2022
1 Jul 2021
9 Jul 2021
1 Jul 2021
9 Jul 2021
1 Jul 2021
Amount
Cutting in earth work in all height of soil including saturated soil comprising of pick work, jumper work, soft blasting work and hard blasting work including chiseling wedging out of rock where blasting is prohibited and transportation of un useful material for filling in road way embankments for grade improvement and leveling to required grades and then disposing of surplus excavated earth in required width of the road or approved dumping site through all modes including head lead, animal lead or mechanical means along with leveling fine dressing of soil ,all labour ,machineries ,materials tools required and safety measures and other incidental necessary to labour if required including carriage of materials with in all leads and lifts and as per the entire satisfaction of Engineer in Charge. Note :- The recovery of stones @0.0333 cum of executed quantity @ 170/-( Rupees one hundred seventy) per cubic meter will be recovered from the contractor .
Earth work in excavation for foundation of structure up to 3 mtr. depth as per drawing and technical specification clause 1104 including setting out, construction souring and dressing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved materials rate as per item No. 9.1 within all lead and lifts and carriage of materials as per the direction of the Engineer in-charge.
Providing concrete 1;4;8 and curing complete including form work. as per drawing and technical specification clause 802,803.1202&1203 within all lead and lift as per direction of Engineer-in-Charge.
Plain cement concrete M-10 (136 nominal size) in leveling course below open foundation of head walls as per drawing and technical specification clause 802,803.1202&1203 (Rate as per item No. 11’ within all lead and lifts and carriage of materials as per the direction of the Engineer in-charge.
Providing and laying reinforcement cement concrete pipe NP-2 for culverts on first class bending of granular materials in signal rough including fixing collars with cement motar 1:2 but excluding excavation protection work back filling concrete and masonary work in head walls and parapets clause 1108 C-600 mm dia. rate as per item No. 11.4 (ii)within all lead and lift as per direction of Engineer-in-Charge
Providing weep holes in brick masonary, plain reinforcement cement concrete abutments, wing walls, return wall with 100 mm dia PVC pipe extending through the full width of structure with slope of 1(v) : 20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7. within all lead and lifts and carriage of materials as per the direction of the Engineer in-charge.
Providing and filling filter media with granular crushed aggregate as per specification to thickness of not less than 6oo mm with smaller size toward the soil and bigger size toward the wall and providing over the entire surface behind abutment, wing wall return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8. within all lead and lifts and carriage of materials as per the direction of the Engineer in-charge.
Construction of embankment with material from borrow pits with lift up 1.5 mtr and transporting to site spreading to grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 with in lead of 1000 mtr . Chapter 3.4. clause 301.5 as per direction of Engineer-in-charge, including loading un-loading and carriage by all means .
Construction of unlined surface drain of average cross -section area 0.40Sqm in soil to specified lines ,grades, levels and dimension . Excavated material to be used in embankment with lift up to 3.00 mtr and lead of 50 mtr as per Technical specification clause 307. . and with in all leads and lifts and as per entire satisfaction of the Engineer-in-charge.
Ajay Thakur
HUKAM SINGH CONTRACTOR
Hardeep Singh Bedi
SHYAM LAL GOVT CONTRACTOR
JASWINDER KUMAR
rehana
JITENDER KUMAR
ASHISH THAKUR
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .