| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr Quoted ₹1.9 Cr | L1 | Accepted-AOC WORK AWARDED |
| 2 | L2₹1.9 Cr+₹3.3 L (1.79%)Rejected-AOC ERODE 638 002 | ERODE | TAMIL NADU | 638002 | ₹1.9 Cr+₹3.3 L (1.79%) | L2 | Rejected-AOC SECOND LOWEST |
| 3 | L3₹1.9 Cr+₹6.2 L (3.32%)Rejected-AOC | ₹1.9 Cr+₹6.2 L (3.32%) | L3 | Rejected-AOC THIRD LOWEST |
| Sl No | Description | Qty | Unit | A SURESHKUMAR L1 | R SURESHMANI L2 | ksn construction L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling, Clearing away and carefully stacking materials useful for re-use of Reinforcement Cement Concrete etc., complete as directed by the departmental officers. | 17.3 | Cu.m | 4,615 ₹79,839.5 Lowest | 4,770 ₹82,521 | 4,850 ₹83,905 |
| 2.00 | Dismantling, Clearing away and carefully stacking materials useful for re-use of Brick Masonry in cement mortar walls under 3m high etc., complete as directed by the departmental officers. | 44.45 | Cu.m | 305 ₹13,557.25 Lowest | 320 ₹14,224 | 320 ₹14,224 |
| 3.00 | Dismantling, Clearing away and carefully stacking materials useful for re-use of Doors and Windows including removal of frames, hinges and fastenings etc., complete as directed by the departmental officers. | 28.5 | Cu.m | 165 ₹4,702.5 Lowest | 170 ₹4,845 | 180 ₹5,130 |
| 4.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 395 | Cu.m | 260 ₹1,02,700 Lowest | 270 ₹1,06,650 | 280 ₹1,10,600 |
| 5.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 34 | Cu.m | 115 ₹3,910 Lowest | 120 ₹4,080 | 120 ₹4,080 |
| 6.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 148 | Cu.m | 2,115 ₹3,13,020 Lowest | 2,190 ₹3,24,120 | 2,220 ₹3,28,560 |
| 7.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 383 | Cu.m | 490 ₹1,87,670 Lowest | 510 ₹1,95,330 | 520 ₹1,99,160 |
| 8.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 132 | Cu.m | 160 ₹21,120 Lowest | 170 ₹22,440 | 170 ₹22,440 |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 22 | Cu.m | 5,860 ₹1,28,920 Lowest | 5,880 ₹1,29,360 | 5,980 ₹1,31,560 |
| 10.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 76 | Cu.m | 5,860 ₹4,45,360 Lowest | 5,880 ₹4,46,880 | 5,980 ₹4,54,480 |
Tender Value
₹1.8 Cr
EMD Value
₹1.0 L
Closing Date
22 Aug 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
O/o. The SE, PWD Buildings C and M Circle, Vellore
Construction of 8 Additional Class room building in GHSS at Panamadangi in Vellore District
2025_PWD_594329_1
14/VLR-CLE/25-26-14/29.07.2025
Open Tender
Civil Works - Buildings
Lump-sum
180 days
PANAMADANGI IN VELLORE DISTRICT
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.0 L
19 Nov 2025
19 Aug 2025
22 Aug 2025
19 Aug 2025
22 Aug 2025
19 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .