Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance | ₹8.2 L | L1 | Admitted-Finance |
| 2 | L2₹8.6 LAdmitted-Finance | ₹8.6 L | L2 | Admitted-Finance |
| 3 | L3₹9.6 LAdmitted-Finance | ₹9.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | New Way Construciotn L1 | SHRI SAI TRANSMISSION CONSTRUCTION L2 | Saurabh Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00VARIABLE EXECUTION CHARGES (LABOR) 33 KV Cable Fault (Labor) | ||||||
| 1.01 | Assistance Basis: Rectification of 33KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, back filling & leveling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | 100 | Job | 2,30,000 ₹2.3 L | 3,00,000 ₹3 L | 2,50,000 ₹2.5 L |
| 1.02 | Assistance Basis: Replacement of 33KV Indoor/Outdoor Cable box using Indoor/ Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/ holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal | 80 | Job | 1,44,000 ₹1.4 L | 96,000 ₹96,000 | 1,60,000 ₹1.6 L |
| 2.00VARIABLE EXECUTION CHARGES (LABOR) 11 KV Cable Fault (Labor) | ||||||
| 2.01 | Assistance Basis: Rectification of 11KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & leveling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | 100 | Job | 1,80,000 ₹1.8 L | 2,10,000 ₹2.1 L | 2,00,000 ₹2 L |
| 2.02 | Assistance Basis: Replacement of 11KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/ installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal | 80 | Job | 1,16,000 ₹1.2 L | 99,040 ₹99,040 | 1,20,000 ₹1.2 L |
| 3.00Extra Charges | ||||||
| 3.01 | Fuel Charges | 1,500 | Km | 1,48,500 ₹1.5 L | 1,50,000 ₹1.5 L | 2,25,000 ₹2.3 L |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
8 May 2026, 12:00 pmClosed
SE, EDC, VARANASI
Superintending Engineer ELECTRICITY DISTRIBUTION CIRCLE, Purvanchal Vidyut Vitran Nigam Limited, Bhikharipur, Post- B.L.W Varanasi-221004
The work of locating and repairing damaged underground cables, 33 KV and 11 KV lines through departmental fault locator machines.
2026_PVVNV_1141028_1
05/EDC(V)/2026-27
Open Tender
Electrical Works
365 days
VARANASI
Please refer as per tender document
3 documents required · 3 mandatory
₹1,180
Yes
EE, EDD-Baraipur, Varanasi
₹8,500
Yes
26 May 2026
23 Apr 2026
8 May 2026
23 Apr 2026
8 May 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
VARIABLE EXECUTION CHARGES (LABOR) 33 KV Cable Fault (Labor) | - | - | - | - | - | |
| 1.01 | Assistance Basis: Rectification of 33KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, back filling & leveling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | 100 | Job | - | - | ITEM 1 |
| 1.02 | Assistance Basis: Replacement of 33KV Indoor/Outdoor Cable box using Indoor/ Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/ holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal | 80 | Job | - | - | ITEM 2 |
VARIABLE EXECUTION CHARGES (LABOR) 11 KV Cable Fault (Labor) | - | - | - | - | - | |
| 2.01 | Assistance Basis: Rectification of 11KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & leveling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | - | Job | - | - | ITEM 3 |
| 2.02 | Assistance Basis: Replacement of 11KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/ installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal | - | Job | - | - | ITEM 4 |
Extra Charges | - | - | - | - | - | |
| 3.01 | Fuel Charges | - | Km | - | - | ITEM 16 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
05TD.rar
Tender Documents • 1.91 MB
BOQ_2130626.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid