| 1 | L1₹3.4 LAccepted-Finance GORAKHPUR UTTAR PRADESH 273006 INDIA UDYAM UP 32 0070581 | GORAKHPUR | UTTAR PRADESH | 273006 | ₹3.4 L | L1 | Accepted-Finance Lowest Value |
| 2 | L2₹3.7 LRejected-Finance | ₹3.7 L | L2 | Rejected-Finance Highest Value |
| Sl No | Description | Qty | Unit | MS RK ERACTORS L2 | M/S V P ASSOCIATES WORKS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Shifting of empty oil tank of 20KL from 400KV S/S, Motiram Adda Gorakhpur Store to 220KV S/S, Basti Work Site(85Km approx) including loading, unloading, and transportation. | 1 | Job | 2,400 ₹2,400 | 22,000 ₹22,000 |
| 2.00 | Draining of transformer oil from main tank of 132/33kV 63MVA T/F I & II at 132kV S/S Harraiya and 63MVA T/F III at 220kV S/S Basti (for Y phase HV bushing replacement) into empty oil tank of 20KL capacity/Empty oil drum of 209Ltr Capacity.(4KL For each T/F). | 12 | KL | 480 ₹5,760 | 474 ₹5,688 |
| 3.00 | Replacement of Y-Phase HV Side(145KV) bushing (Tan Delta value High) by new spare bushing at 132kV S/S Harraiya (For 63MVA T/F I & II T&R make) and 220kV S/S Basti (For 63MVA T/F III T&R make) including replacment of gasket with O-ring. Gasket and O-ring will be provided by contractor. Old bushing to be handed over to store. | 3 | Job | 20,000 ₹60,000 | 17,980 ₹53,940 |
| 4.00Centrifuging of complete transformer oil using contractor’s own centrifuging machine, hoses, and accessories. The contractor shall provide all required T&P, skilled manpower, and carry out BDV measurement of oil at regular intervals to attain BDV more than 70kV as per the direction of the supervising engineer at following Substations: | |||||
| 4.01 | 132/33kV 63 MVA T/F 3rd at 220kV S/S Basti | 21,300 | Ltr. | 2.3 ₹48,990 | 1.95 ₹41,535 |
| 4.02 | 132/33kV 63 MVA T/F I & II at 132kV S/S Harraiya (Each T/F Oil Capacity 21300 Ltr.) | 42,600 | Ltr. | 2.3 ₹97,980 | 1.95 ₹83,070 |
| 4.03 | 132/33kV 20 MVA T/F II at 132kV S/S Kalwari | 10,560 | Ltr. | 2.3 ₹24,288 | 1.95 ₹20,592 |
| 4.04 | 132/33kV 20 MVA T/F at 132kV S/S Khalilabad | 10,560 | Ltr. | 2.3 ₹24,288 | 1.95 ₹20,592 |
| 5.00 | Tan-delta / capacitance test of T/F & Bushing after bushing replacement. | 3 | Job | 2,900 ₹8,700 | 2,550 ₹7,650 |
| 6.00 | Supply of new conservator Aircell (bladder type, Suitable for TAL make 63 MVA T/F I conservator) with mounting hardware, clamps, and gaskets | 1 | No. | 57,000 ₹57,000 | 54,500 ₹54,500 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
23 Dec 2025, 1:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY TRANSMISSION CIRCLE, 220 KV SUB-STATION, GIDAHI BASTI.
OIL CENTRIFUGING REPLACEMENT OF HIGH TAN DELTA VALUE Y PHASE HV BUSHING OF 132/33KV 63 MVA T/F AT 220KV S/S BASTI AND 132KV S/S HARRAIYA AND REPLACEMENT OF PUNCTURED AIRCELL IN CONSERVATOR OF 132/33KV 63MVA T/F AT 220KV S/S BASTI UNDER ETD-I BASTI.
2025_UPTCL_1097308_1
Short Term E-Tender No-46/ETC(B)/2025-26
Open Tender
Electrical Works
30 days
220 KV S/S Gidahi Basti
AS PER TENDER
2 documents required · 2 mandatory
₹590
UPSEB ELECTRICITY TRANSMISSION DIVN.
₹4,200
30 Dec 2025
8 Dec 2025
24 Dec 2025
8 Dec 2025
23 Dec 2025
8 Dec 2025
Amount
Shifting of empty oil tank of 20KL from 400KV S/S, Motiram Adda Gorakhpur Store to 220KV S/S, Basti Work Site(85Km approx) including loading, unloading, and transportation.
Draining of transformer oil from main tank of 132/33kV 63MVA T/F I & II at 132kV S/S Harraiya and 63MVA T/F III at 220kV S/S Basti (for Y phase HV bushing replacement) into empty oil tank of 20KL capacity/Empty oil drum of 209Ltr Capacity.(4KL For each T/F).
Replacement of Y-Phase HV Side(145KV) bushing (Tan Delta value High) by new spare bushing at 132kV S/S Harraiya (For 63MVA T/F I & II T&R make) and 220kV S/S Basti (For 63MVA T/F III T&R make) including replacment of gasket with O-ring. Gasket and O-ring will be provided by contractor. Old bushing to be handed over to store.
Centrifuging of complete transformer oil using contractor’s own centrifuging machine, hoses, and accessories. The contractor shall provide all required T&P, skilled manpower, and carry out BDV measurement of oil at regular intervals to attain BDV more than 70kV as per the direction of the supervising engineer at following Substations:
132/33kV 63 MVA T/F 3rd at 220kV S/S Basti
132/33kV 63 MVA T/F I & II at 132kV S/S Harraiya (Each T/F Oil Capacity 21300 Ltr.)
132/33kV 20 MVA T/F II at 132kV S/S Kalwari
132/33kV 20 MVA T/F at 132kV S/S Khalilabad
Tan-delta / capacitance test of T/F & Bushing after bushing replacement.
Supply of new conservator Aircell (bladder type, Suitable for TAL make 63 MVA T/F I conservator) with mounting hardware, clamps, and gaskets
Draining of conservator oil into clean temporary tanks/drums with proper earthing and bunding arrangement.
Dismantling of all pipe lines connected and removal of conservator tank from T/F body to ground opening of endcover and replacement of damaged aircell. Closing of endcover with suitable size new gaskets and erect it back to transformer body.
Installation of new Aircell with proper sealing and mounting, leak testing, and charging of Aircell with dry nitrogen gas to OEM specified pressure (typically 0.25 – 0.35 bar)
Refilling of filtered tranformer oil through centrifuging machine up to required level, followed by top-up and air-bleeding from Aircell connection.
MS RK ERACTORS (BID ID -5763776)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tender_Document_46.pdf
Tender Documents • 6.98 MB
BOQ_2020490.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid