| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 CrAccepted-AOC MOH HUSAINPURA SHAHJAHANPUR | ₹11.8 Cr Quoted ₹12.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹12.7 CrRejected-Finance | ₹12.7 Cr | L2 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| 3 | L3₹12.8 CrRejected-Finance | ₹12.8 Cr | L3 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| 4 | L4₹12.9 CrRejected-Finance C BLOCK VISHAL ENCLAVE NEW DELHI 27 | NEW DELHI | DELHI | 110001 | ₹12.9 Cr | L4 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| 5 | L5₹13.1 CrRejected-Finance B 708 SECTOR C MAHANAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹13.1 Cr | L5 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
Tender Value
₹18.2 Cr
EMD Value
₹36.4 L
Closing Date
24 Feb 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
WIDENING AND STRENGTHENING OF PIHANI BUDHAGAON KULHAGHAT ROAD (ODR) LENGTH 8.45 KM IN DIST. HARDOI WITH FIVE YEAR MAINTENANCE
2025_CEUCZ_1007221_1
825/M/1MT/E-TENDER/UC/2025 DT 10.02.2025
Open Tender
Civil Works - Roads
365 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹36.4 L
Yes
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
8 Apr 2025
17 Feb 2025
24 Feb 2025
17 Feb 2025
24 Feb 2025
17 Feb 2025
20 Feb 2025
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location within all lifts and lead upto 1000 m. (Including Labour Cess but excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Compaction only) (Including Labour Cess but excluding GST)
Construction of embankment with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2 (Including Labour Cess but excluding GST)
Construction of subgrade and earthen shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Including Labour Cess but excluding GST)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Including Labour Cess but excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including Labour Cess but excluding GST)
Providing, laying and spreading graded stone aggregate to Stablized wet mix macadam (cement 1% OPC & 3.5% SS Bitumen emulsion by weight of mix) and specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, Laying in uniform layers with Paver in Subbase/ Base course on well prepared surface and density Compacting with vibratory roller to achieve the desired Density. (Including Labour Cess but excluding GST)
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom . (Including Labour Cess but excluding GST)
Providing and laying bituminious concrete using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. (Including Labour Cess but excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including Labour Cess but excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including Labour Cess but excluding GST)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including Labour Cess but excluding GST)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (Including Labour Cess but excluding GST)
RCC Grade M 25 Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications. (Including Labour Cess but excluding GST)
RCC Grade M 20 Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications.(Including Labour Cess but excluding GST)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including Labour Cess but excluding GST)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications (Including Labour Cess but excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (Including Labour Cess but excluding GST)
Maintenance of constructed road for next five years after the actual date of completion. The amount to be paid as total maintenance cost for Next five years in the form of installment as given below. (Rates are including labour cess but excluding GST) 1st year Zero and 2nd year after the actual date of completion @0.25% of total Construction cost.
3rd year @ 0.5% of total Construction cost
4th year @ 0.75% of total Construction cost
5th year @ 1.00% of total Construction cost
MAA Aadi Shakti Infrabuild India Pvt. Ltd. (BID ID -4992140)
M/s Nirbhay Constructions (BID ID -4976359)
rohit construction company (BID ID -4986313)
M/S SURYANSH INFRA DEVELOPERS PVT LTD (BID ID -4983189)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf