Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Low Rate Quoted |
| 2 | L2₹4.2 LRejected-Finance | ₹4.2 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | N.K.Sankar L2 | G.Vijaya Constractor L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 19.36 | m3 | 130 ₹2,516.80 | 123 ₹2,381.28 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 24.5 | m3 | 5,000 ₹1.2 L | 4,953 ₹1.2 L |
| 3.00 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. | 114.95 | m3 | 350 ₹40,232.50 | 345 ₹39,657.75 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 29.12 | m3 | 6,400 ₹1.9 L | 6,330 ₹1.8 L |
| 5.00 | Provision for Bitumen pad 12mm Thick | 2.19 | m2 | 500 ₹1,095 | 479 ₹1,049.01 |
| 6.00 | Provision for Name Board Charges | 1 | No | 3,000 ₹3,000 | 3,000 ₹3,000 |
| 7.00 | GST 18% | 1 | No | 64,028.21 ₹64,028.21 | 63,317.91 ₹63,317.91 |
| 8.00 | LWF 1% | 1 | No | 3,557.12 ₹3,557.12 | 3,517.66 ₹3,517.66 |
Tender Value
₹4.2 L
EMD Value
₹4,200
Closing Date
3 Jul 2025, 4:30 pmClosed
BLOCK DEVELOPMENT OFFICER, CHEYYAR
BLOCK DEVELOPMENT OFFICE, CHEYYAR
Providing Cement Concrete Pavement (From Ramalingam House to Amman Koil) at Vadathandalam ADC ( Length-60m With-3.75m) in Vadathandalam
2025_RDTN_576500_1
PA12538VADATHANADCCC
Open Tender
Civil Works
30 days
BLOCK DEVELOPMENT OFFICE, CHEYYAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,200
25 May 2026
1 Jul 2025
3 Jul 2025
1 Jul 2025
3 Jul 2025
1 Jul 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Provision for Bitumen pad 12mm Thick
Provision for Name Board Charges
N.K.Sankar (BID ID -1390707)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid