Minor Irrigation Department
technical assistant
Construction of Checkdam cum LLC across halla near Bidalapura, Huralagurki, Yambarahalli, Bommavara, Hadonahalli, Koramangala villages of Devanahalli Vidhanasabha Constituency, Bengaluru Rural District
MI/2025-26/DA/WORK_INDENT7747/CALL-2
MI/2025-26/DA/WORK_INDENT7747/CALL-2
Open
Dam and Allied works
Two Tender Document System(Two Cover)
Minor Irrigation Division Bengaluru
7 documents required · 7 mandatory
3.2 To qualify for award of this contract, each tenderer in his name should have in the last five years Period (2020-21 to 2024-25) b) Satisfactory completion as a prime contractor for at least one similar work such as Construction of Box culvert/check dam/Pick up/Barrage/ Barrage cum Bridge/Anecut/Check dam cum cause way/Bandaras/Aqueduct works of value not less than Rs.120.29 Lakhs
3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years period. (c) Executed in any one year the following minimum quantities of work: (Usually 80% of Annual Requirement for work costing up to Rs. Lakhs)1-Earthwork in excavation ,Embankment and de-silting combined qtys.-35774.0 CUM,2-cement concrete both RCC and PCC-1628.0 cum, 3-Reinforcement of Steel-22.60 t, 4-Revetment/pitching-808.0 SQM
liquid assets and /or availability of credit facilities of not less than Rs. 80.20 Lakhs (Credit lines/letter of credit/certificates from banks for meeting the fund requirement etc.) in the format to be as prescribed in bid document
3.2 To qualify for award of this contract, each tenderer in his name should have in the last five years Period (2020-21 to 2024-25) a) Achieved in at least two financial years a minimum financial turnover (In all classes of Civil Engineering Construction works) of Rs.481.18 lakhs
Annual Turnover Certificate along with Balance sheet certified/attested by Chartered Accountants should be uploaded with 18-Digits system generated unique number UDIN Number
Details of Existing commitments and on-going works as per bid document and Details Works for which Tenders already submitted as per section 3 of Standard bid document K/W-4
Similar Nature of Work done Certificate issued by officer not below the rank of Executive Engineer
Bidder should quote the rates excluding GST
List of existing commitments and ongoing works
List of works for which tenders already submitted
Contractor should produce the updated IT clearance Certificate
Contractor Registration/Company Registration Certificate/PWD registration certificate
Contractor should produce the gst Registration Certificate along with latest updated gst Clearance Certificates
Tender application amount will not be refundable
Conditional tender will not be considered
₹5,000
₹3.6 L
9 Mar 2026
7 Feb 2026
11 Mar 2026
9 Mar 2026
18 Feb 2026
TENTATIVE PHYSICAL/FINANCIAL ACTIVITY CHART
Construction of Checkdam Cum LLC across halla near Bidalapura, Huralagurki, Yambrahalli, Bommavara, Hadonahalli and Koramangala villages in Devanahalli Vidhanasabha Constituency, Bengaluru Rural District
MI/2025-26/DA/WORK_INDENT7747/call-2
SL NO Item Name Unit Quantity Rate (INR) Total (INR) 1st month 2nd month 3rd month 4th month 5th month 6th month 7th month 8th month 9th month
PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii )By mechanical means using Dozer (a)In area of light jungle.( Item No. 2.5 (ii) a , Page No. 9, Schedule Of Rates For Road and Bridge works 2023-2024 , Public Work Department , Volume -3 ) 100Sqmtr 260.00 393.00 102180.00 28.89 11353.33 28.89 11353.33 28.89 11353.33 28.89 11353.33 28.89 11353.33 28.89 11353.33 28.89 11353.33 28.89 11353.33 28.89 11353.33 260.00 102180.00 0.00
2 De-silting of tank bed /Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and complete as per specification. (Item No 3.12, Page No. 140 , Department minor irrigation & ground Water Development Department KarnataKa power corporation limited uniform common scheDule of rates 2023-24,government of KarnataKa,VOLUME - 4) CUM 33480 54.00 1807920.00 3720.00 200880.00 3720.00 200880.00 3720.00 200880.00 3720.00 200880.00 3720.00 200880.00 3720.00 200880.00 3720.00 200880.00 3720.00 200880.00 3720.00 200880.00 33480.00 1807920.00
3 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including Cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m.( Item No. 1.14.1 , Page No. 8, Common Schedule Of Rates For Engineering Department 2023 - 24 , Public Work Department , Volume -1 ) CUM 2459.64 102 250883.28 273.29 27875.92 273.29 27875.92 273.29 27875.92 273.29 27875.92 273.29 27875.92 273.29 27875.92 273.29 27875.92 273.29 27875.92 273.29 27875.92 2459.64 250883.28 0.00
4 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth CUM 421.24 363 152910.12 46.80 16990.01 46.80 16990.01 46.80 16990.01 46.80 16990.01 46.80 16990.01 46.80 16990.01 46.80 16990.01 46.80 16990.01 46.80 16990.01 421.24 152910.12
5 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. (Item No 2.13, Page No. 39, Department minor irrigation & ground Water Development Department KarnataKa power corporation limited uniform common scheDule of rates 2023-24,government of KarnataKa,VOLUME - 4) CUM 206.98 5989.00 1239603.22 23.00 137733.69 23.00 137733.69 23.00 137733.69 23.00 137733.69 23.00 137733.69 23.00 137733.69 23.00 137733.69 23.00 137733.69 23.00 137733.69 206.98 1239603.22 0.00
6 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification. (Item No 1.12, Page No. 130, Department minor irrigation & ground Water Development Department KarnataKa power corporation limited uniform common schedule of rates 2023-24,government of KarnataKa,VOLUME - 4) CUM 1,742.76 6843.00 11925706.68 193.64 1325078.52 193.64 1325078.52 193.64 1325078.52 193.64 1325078.52 193.64 1325078.52 193.64 1325078.52 193.64 1325078.52 193.64 1325078.52 193.64 1325078.52 1742.76 11925706.68
7 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates cum 85.09 8080.80 687595.27 9.45 76399.47 9.45 76399.47 9.45 76399.47 9.45 76399.47 9.45 76399.47 9.45 76399.47 9.45 76399.47 9.45 76399.47 9.45 76399.47 85.09 687595.27
8 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technial specification. e. Dam and Allied works .(Item No 2.11(e) , Page No. 18 ,Common Schedule Of Rates For Engineering Department 2023-24 , Public Work Department , Volume -1 ) t 28.254 69,749.00 1970688.25 3.14 218965.36 3.14 218965.36 3.14 218965.36 3.14 218965.36 3.14 218965.36 3.14 218965.36 3.14 218965.36 3.14 218965.36 3.14 218965.36 28.25 1970688.25
9 Construction of Embankment by excavating the available approved Gravell/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, Transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications , including cost of labour, rolling, water, all materials, usage and all appurtenenaces required to complete the work cum 2700 474.00 1279800.00 300.00 142200.00 300.00 142200.00 300.00 142200.00 300.00 142200.00 300.00 142200.00 300.00 142200.00 300.00 142200.00 300.00 142200.00 300.00 142200.00 2700.00 1279800.00
10 Providing impervious embankment adjacent to masonry / concrete structure and filling trial pits using impervious approved soil from borrow area in layers of 100 to 150 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, picking previous layer, spreading soil in layer of specified thickness, sorting-out, breaking clods, levelling, sectioning edges / sides, watering, compacting to density control of not less than 95 percent using pneumatic tampers / vibrating earth rammers and all other ancillary operations complete. cum 5656.85 623.00 3524217.55 628.54 391579.73 628.54 391579.73 628.54 391579.73 628.54 391579.73 628.54 391579.73 628.54 391579.73 628.54 391579.73 628.54 391579.73 628.54 391579.73 5656.85 3524217.55 0.00
11 Providing and constructing dry size stone pitching using 200 to 250mm size stones with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour,hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. Sqm 1010 388.00 391880.00 112.22 43542.22 112.22 43542.22 112.22 43542.22 112.22 43542.22 112.22 43542.22 112.22 43542.22 112.22 43542.22 112.22 43542.22 112.22 43542.22 1010.00 391880.00 0.00
12 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification. CUM 71.35 1278.00 91185.30 7.93 10131.70 7.93 10131.70 7.93 10131.70 7.93 10131.70 7.93 10131.70 7.93 10131.70 7.93 10131.70 7.93 10131.70 7.93 10131.70 71.35 91185.30
13 Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification. m 297.56 337.00 100277.72 33.06 11141.97 33.06 11141.97 33.06 11141.97 33.06 11141.97 33.06 11141.97 33.06 11141.97 33.06 11141.97 33.06 11141.97 33.06 11141.97 297.56 100277.72
14 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 unit 110.00 3,335.00 366850.00 12.22 40761.11 12.22 40761.11 12.22 40761.11 12.22 40761.11 12.22 40761.11 12.22 40761.11 12.22 40761.11 12.22 40761.11 12.22 40761.11 110.00 366850.00 0.00
15 Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting unit 228.00 733.00 167124.00 25.33 18569.33 25.33 18569.33 25.33 18569.33 25.33 18569.33 25.33 18569.33 25.33 18569.33 25.33 18569.33 25.33 18569.33 25.33 18569.33 228.00 167124.00
1st Milestone 2nd Milestone 3nd Milestone 0.00
LOC 9623528.5552 Milestones and liquidity damages
7217646.42 MILESTONES AMOUNT Liquidity damage
Mile Stone 1 8019607.13 8,020.00 Per day 8019.61 Rs 80.20 Lakhs
Mile Stone 2 8019607.13 8,020.00 Per day 16039.21 Rs 80.20 Lakhs
Mile Stone 3 8019607.13 8,020.00 Per day 24058.82 Rs 80.20 Lakhs
1.333333333 EMD 24058821.39 24,060.00 Per day Per day Rs 240.59 Lakhs
revetment 1010.00 sqm 808.00 808.0sqm
Annual turn over Rs 481.18 Lakhs
Line of credit Rs 80.20 Lakhs
Similar nature of work Rs 120.29 Lakhs
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
gov orders.zip
Others - OTHERS • 12.78 MB
kw-4-bid document INDENT7747 CALL-2 BIDALAPURA.docx
Tender Document • 1.37 MB
PHY -FINANCIAL CHART INDENT7747 300 Lakhs FINAL.xlsx
Others - PHY AND FIN CHART • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .