Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-AOC | ₹23.9 L Quoted ₹24.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹38.0 L+₹13.7 L (56.4%)Rejected-AOC | ₹38.0 L+₹13.7 L (56.4%) | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹68,925
Closing Date
19 Dec 2024, 5:00 pmClosed
Commissioner M.Corp. Solan
Commissioner M.Corp. Solan
Construction of Gabion Wall at Solid Waste Management Plant Salogra belonging to MC Solan.
2024_UDDHP_96243_1
9547 dt. 30.11.2024
Open Tender
Civil Works
Item Rate
90 days
M.Corp. Solan
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,500
Commissioner M.Corp. Solan
₹68,925
22 Mar 2025
7 Dec 2024
20 Dec 2024
7 Dec 2024
19 Dec 2024
7 Dec 2024
Amount
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Centering and shuttering including strutting, propping etc. and removal of form for :Foundations,footings,bases of columns etc. and mass concrete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) i) Foundation.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
Providing and laying of boulder apron laid in wire crates with 4 mm dia Gl wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Less 60% Recovery of serviceable Stone
Subhash Chand Rana (BID ID -463547)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .