| 1 | 1₹16.6 LAccepted-AOC KOTTANADU PUDUR NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | ₹16.6 L | 1 | Accepted-AOC L1 |
| 2 | 2₹16.8 LRejected-AOC | ₹16.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MAHA SAKTHI CONSTRUCTION L1 | Malarkodi Sankar L2 |
|---|---|---|---|---|---|
| 1.00Construction of Community hall buliding at kokkalai H/O Kokkalai | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 60.74 | cum | 263.78 ₹16,022 | 263.78 ₹16,022 |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 10.43 | cum | 5,322.52 ₹55,513.88 | 5,322.52 ₹55,513.88 |
| 4.00 | Collection and supply of gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 28.88 | cum | 280.34 ₹8,096.22 | 280.34 ₹8,096.22 |
| 5.00Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | |||||
| 6.00 | Basement | 4.64 | cum | 7,329.08 ₹34,006.93 | 7,329.08 ₹34,006.93 |
| 7.00 | above basement | 20.65 | cum | 7,421.95 ₹1.5 L | 7,421.95 ₹1.5 L |
| 8.00Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) for column footing and Plinth beam | |||||
| 9.00 | Footing Side | 45.05 | sqm | 547.5 ₹24,664.88 | 547.5 ₹24,664.88 |
| 10.00 | For column and sunshade | 34.2 | sqm | 1,095 ₹37,449 | 1,095 ₹37,449 |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
11 Dec 2025, 3:00 pmClosed
BDO BP
BDO Office Elachipalayam
Construction of Community Hall at Kokkalai H/o. Kokkalai in Elachipalayam Block of Namakkal District under MLACDS 2025-26
2025_RDTN_629248_2
3228/2025
Open Tender
Civil Works
180 days
Kokkalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,000
Yes
10 Mar 2026
5 Dec 2025
11 Dec 2025
5 Dec 2025
11 Dec 2025
6 Dec 2025
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Collection and supply of gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Basement
above basement
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) for column footing and Plinth beam
Footing Side
For column and sunshade
Beam bottom
roof slab and lintel beam
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Weathering course with brick jelly lime concrete in the proportion of 32:12.5 by volume including cost and conveyance of all and labour charges etc. complete.
Finishing the top of roof with one course of pressed tiles of size 20 X 20 X 2 mm laid in CM 1:3 12 mm thick mixes with W.P. compound laid 2 % weight of cement etc., complete.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supply of steel doors and windows including cost and convyance and all charges etc complete.etc complete
Rolling shuter 2.44x2.10m[2171PER SQ]
Window W (1.20x1.30m)
Door (1.20x2.10m)[3709PER SQ]
Labour charges for fixing Doors alongwith frames in position etc., complete (finished work) as per serial no 114 and item no 19
Labour charges for fixing Windows and Ventilators alongwith frames in position etc., complete (finished work) as per serial no 115 and item no 20
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours
Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete
Oil Distempering Two Coats over Plastering Surface including cost and conveyance of materials and labour charges etc complete
Emulsion Painting two coats with approved Paint over one coat of Primaring coat of Cement Paint over new cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T W Clamps, Plug, Shoes, bend, Screws, nails etc., complete
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_752473.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_752473.xls
BOQ • 0.25 MB
Schedule_community.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid