Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹52.9 L+₹58,186.50 (1.11%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹57.4 L+₹5.0 L (9.63%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹59.6 L+₹7.2 L (13.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹64.2 L+₹11.9 L (22.8%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹66.4 L
EMD Value
₹1.3 L
Closing Date
22 Dec 2020, 3:00 pmClosed
Executive Engineer, RCD,APWD, Wimberly Gunj
Executive Engineer, RCD,APWD, Wimberly Gunj
Construction of Compound wall around Abhudaya Complex Ferrar Gunj
2020_APWD_1639_1
NIT No. 62/EE/RCD/APWD/WG/2020-21
Open Tender
Civil Works - Others
Item Rate
180 days
Wimberly Gunj
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
EE, RCD APWD Wimberly Gunj
₹1.3 L
8 Apr 2021
2 Dec 2020
24 Dec 2020
2 Dec 2020
22 Dec 2020
11 Dec 2020
Amount
EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
CONCRETE WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
REINFORCED CEMENT CONCRETE
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :
1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
MASONRY WORK
Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately).
STEEL WORK
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
FINISHING
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work
P GANGA RAJU AND BROTHERS
M Abdul Hameed
T ROBERT KENNEDY
A Palani
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .