SE/EEDC/Erode
948 EVN Road, Erode-9.
Works Contract in C and I sub division of South division.
2020_EB_181611_1
049/20-21
Open Tender
Miscellaneous Works
Works
365 days
SE/EEDC/ERD
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
30 Jul 2021
29 Sept 2020
13 Oct 2020
29 Sept 2020
12 Oct 2020
29 Sept 2020
Amount
Excavation of pole pit size of 2'x2'x6' upto 27'(8.0m) Pole by using JCB or manual
Stay pit 4.5' to 5' by using JCB or manual
Excavation of pole pit size of 2'X2'X6' upto 9.14'mtr Pole by using JCB or manual
Excavation of RSJ pole pit above 30' by using JCB or manual
Hard rock requires without blasting(where houses are located)
Erection of RCC poles/metal poles upto 27'(8.0m) pole by using JCB or manual
i)Erection of PSC poles/metal poles upto 30'(9.14m) pole by using JCB or manual ii)Erection of PSC poles/metal poles upto 30'(9.14m) pole by using JCB or manual iii)Erection of RSJ,Rail,fabricated poles 30'(9.14m) pole by using JCB or manual
Erection of stay set complete
Fixing of HT "V" cross arms (all types)/Channel cross arms/Guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase ph X arm
Fixing of HT/LT TI fittings
Fixing of HT Pin insulator 11KV
Fixing of HT Pin insulator 22KV
Fixing of HT Pin insulator 33KV
Fixing of HT 11KV strain Disc
Fixing of LT pin insulators
Fixing of LT shackle with MP
Fixing of Aluminium Knob
Earthing of pole with pin including burying ,looping and binding
Paving of Conductor, stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/4.09mm
Paving of Conductor, stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/3.35mm ACSR or 7/3.0 AAAC
Paving of Conductor, stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/2.59mm ACSR or 7/2.11ACSR
Structure concreting of poles with size (2'x2'x6') including cost of jelly,sand,cement with mixture of 1:3:6 and plastering of concrete with ratio 1:2
Sleeve concreting with size (2'x2'x3') including cost of excavation jelly,sand,cement with mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials
Stay concreting of stay with size 1.5'x1.5'x3.0' including cost of 40 mm jelly,sand and cement(with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2
Erection of double pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works -Excavation of pole pit sizing 3'x3'x6',Transporting of pole pit location 2 Nos, erection of pole 2Nos,Excavation of stay pit 4 Nos, erection stay 4set,Mass concreting (Jelly and sand supplied by contractor),Assembling of structure materials Top chennal 1set,Belting and angle and HG fuse angle, Erection of AB switch,Erection of HG fuse set complete, Structure earthing complete the pits and earth tubs and 3pipes complete,Feeding arrange with open type fuse unit,HT/LT LAS fixing and jumbering, Fixing of support insulator angle and erection 3Nos pin insulator, HT jumbering complete, painting of all clamps and other iron materials and painting of structure poles including paint brushes sundries etc,LTbus bar arrangements, Fixing of danger board,erection of transformer
Dismantling of double pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works -dismantling of pole pit sizing 3'x3'x6',Transporting of pole pit location 2 Nos,dismantlingof pole 2Nos,dismantling of stay pit 4 Nos, erection stay 4set,dismantlingof structure materials Top chennal 1set,Belting and angle and HG fuse angle, dismantling of AB switch,Erection of HG fuse set complete, Structure earthing complete the pits and earth tubs and 3pipes complete,Feeding arrange with open type fuse unit,HT/LT LAS fixing and jumbering,dismantling of support insulator angle and erection 3Nos pin insulator, HT jumbering complete, ,LTbus bar arrangements, dismantling of danger board,erection of transformer.
LT split neutral guarding
Guarding arrangements with Flat guarding including fixing of 2Nos. Cross arms
HT guarding
Transports of poles /Materials /Conductors and other materials(excluding loading and unloading charges) for below 8 kms
Transports of poles /Materials /Conductors and other materials(excluding loading and unloading charges) for above 8 Kms for addl. Kms
Loading of poles 27'.0"
Loading of poles 30'.0"/RSJ pole
Unloading of poles 27'.0"
Unloading of poles 30'.0"/RSJ pole
Transporting of poles from road side to pole per pit including loading and unloading of pole by using JCB or manual up to 200m
Transporting of poles from road side to pole per pit including loading and unloading of pole by using JCB or manual up to 1 KM
Loading or unloading of transformer upto 200KVA for each
Loading or unloading of transformer above 200KVA for each
Resagging of HT line with ACSR 7/4.09mm
Resagging of HT /LT line with ACSR 7/3.35mm
Resagging of HT /LT line with ACSR 7/2.59mm
Erection of street light including fixture fitting
Erection of street light service
Releasing of grills from RCC poles
Releasing of single phase service and re fixing
Releasing of three phase service and re fixing(upto 50HP)
Releasing of three phase service and re fixing(above 50HP)
Erection for double pole structure D.P)complete with following works -Excavation of pole pit sizing 2'x2'x6',erection of poles, erection of base plate,erection of structure materials, erection of AB switch and HG fuse, Structure earthing complete, (Excluding pole concrete ), erection of metering set, HT LAS fixing and LAS earthing through PVC pipe 0.5",erection of stay set complete, jumpering, erection of support angles and insulators if any, alteration of materials in lathe works if any, provision of danger board, 3nos earth pits including erection of cement collar,painting of metal parts,(all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor)
Dismantling of double pole structure D.P)complete with following works -dismantling of pole pit sizing 2'x2'x6',dismantling of poles, dismantling of base plate,dismantling of structure materials, dismantling of AB switch and HG fuse, Structure earthing complete, (Excluding pole concrete ), dismantling of metering set, HT LAS fixing and LAS earthing through PVC pipe 0.5",dismantling of stay set complete, jumpering, erection of support angles and insulators if any, alteration of materials in lathe works if any, provision of danger board, 3nos earth pits including erection of cement collar,painting of metal parts,(all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor)
Labour charges for alteration of back clamps to suit for the works
Labour charges for alteration of stay clamps to suit for the works
Releasing of ACSR/AAAC conductors from conductor drum and colling ACSR 7/3.35,7/2.59,AAAC 7/2.50,7/3.15MM(per km)
Cutting of cocunut leaves (per tree)
Drilling of hole in channel only 3/4" &1" per hole
Cutting of flat
Cutting of channel
Cutting of Angle
Cutting of pipe
Dismandling of RCC pole 9.14mtr/RSJ pole
Dismandling of RCC/PSG pole 8.0mtr/7.5mtr
Dismandling of 'V' X arm,channel X arm,guarding X arm(all types)
Dismandling of LT 3 phase X arm
Dismandling of LT single phase X arm
Dismandling of HT/LT TI fitting
Dismandling of 11KV strain disc
Dismandling of 22KV pin insulator
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium knob
Dismandling of stay set
Dismandling of ACSR 7/3.35mm conductor
Dismandling of ACSR 7/2.59mm/ 7/2.11mm conductor
Dismandling of street light service
Loading of materials
Unloading of materials
Dismandling of MVL/SVL fitting
Dismandling of 1x40w FTL fitting
Loading of LT armoured cable drum from stores using crane lorry, safe transporting to site and safe unloading at the work site without any damage using crane lorry. This includes labour for loading, unloading, transporting and rent, for crane lorry, all T and P such as crow bars, sling shackle etc., that must be brought by the conductor.
Recolling / laying / remoble of LT UG cable from the excavated trench including drawing the cable brought RCC / GI pipe whereever necessary for road crosing without any damaged and incluing provison of signal board, danger board, light loading, transporting charges, unloading of toolsand plant etc., Cable size of 2*16 sq mm
Recolling / laying / remoble of LT UG cable from the excavated trench including drawing the cable brought RCC / GI pipe whereever necessary for road crosing without any damaged and incluing provison of signal board, danger board, light loading, transporting charges, unloading of toolsand plant etc., Cable size of 4*240 sq mm
Earth work excavation of 0.75 Mt avg deepth, 0.45mt avg width in hard stiff clay shales muerran gravel, stoney eartha and mixed with small size boulters and gravelly soil for and bedding as disrected by the engieer in charge at site and incuding proving labour for watching over the excavated trnch during day and night to avoid any accident cause to animals and human being including cast of signal board, danger light, barry cate arrangements, red and light etc. (this excludes black topping charges)
Labour charges for removing of black topping portion of 0.45M thickness by using chisel. Hammer and pick axe and including cost of signal board and danger light and providing watch amd word staff to prevent any accident caused to the cattle and human beings including sharpening charges of chisel and including excavation of road cutting using JCB/ air compresser drill and day and night time and avoiding any damage to the telecom and water lines etc.
Providing sand betting with good quality of sand to a depth of 6" in the excavated cable trnch In cluding cost of sand, labour, and labour charges for transport, lead, lift and etc coplete.
Drawal laying of RCC "V" troughs in the excavated cable trench from stores / work site including transporation without any damage. This includes all lead, lift safe unloading, safe loading and safe transport etc.
Refilling the cable trunch and duct with excavated earting layer, ramming and consolidated property in layers of 6" and the top brought in line with the exg surface including labour, lead, lift etc complete.
Erection of 140 mm dia GI/PVC pipe for ercashing the LT cable at terminaton structure.
Erection of Single pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of structure pole pit 2'x2'x6' by using JCB or manual, Transporing of pole from road side to pole pit by using JCB or manual, Erection of poles by using JCB or manual, Excavation of stay pit by JCB or manual, erection of stay set complete , Mass concreting for poles, Stay concreting , erection of structure materials ( tapping channel, transformer bed structure) ,erection of AB switch Erection of HG fuse,structure earthing complete with 3 pits and earth loops, fixing of MCD box, HT-LAS fixing, LT-LAS fixing, HT jumpering complete, Painting of all clamps, other materials and painting of structure pole, LT cable arrangement and fixing of danger Board.
Dismantling of Single pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of structure pole pit 2'x2'x6' by using JCB or manual, Transporing of pole from road side to pole pit by using JCB or manual, Erection of poles by using JCB or manual, Excavation of stay pit by JCB or manual, erection of stay set complete , , Stay concreting ,dismantling of structure materials ( tapping channel, transformer bed structure) ,dismantling of AB switch dismantling of HG fuse,structure earthing complete with 3 pits and earth loops, fixing of MCD box, HT-LAS fixing, LT-LAS fixing, HT jumpering complete, , LT cable arrangement and Dismantling of danger Board.
ALEX POWER ENGINEERING
CMR ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .