| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance C M SUB DIVISION CBE 027 KOTHAGIRI H COIMBATORE 18 TAMIL NADU | ₹11.4 L | L1 | Admitted-Finance |
| 2 | L2₹11.6 LAdmitted-Finance | ₹11.6 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | OM SAKTHI CONSTRUCTION AND BUILDERS L1 | M.Parameshwaran L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Construction of Retainingwall at Thuneri Nattakkal Road (Ch 1180) H/o Kengarai of Kotagiri Block | |||||
| 1.10Civil Work | |||||
| 1.20 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation etc complete. | 47.5 | cum | 369 ₹17,527.50 | 376 ₹17,860 |
| 1.30 | Drilling Holes in Hard Rock 16mm Dia size including all cost and conveyance and Labour charges etc complete | 40 | Nos | 600 ₹24,000 | 612 ₹24,480 |
| 1.40 | Supplying and fabricating, placing in position m.s. or R.T.S for all Reinforced cement concrete works as per the design given including the cost of steel and bindingwire in all floors etc. complete complying with standard specification. | 0.13 | MT | 1,06,345 ₹13,399.47 | 1,08,472 ₹13,667.47 |
| 1.50 | Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed. | 7.13 | cum | 7,449 ₹53,111.37 | 7,598 ₹54,173.74 |
| 1.60 | Supplying and erecting, centering for sides and soffits including necessary supports and strutting up to 3.30 m.height for the following surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size.90cm.x 60cm and 10 B.G stiffened with mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak (country wood) joists of size 10cm x 6.5cm. spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centres complete complying with standard specifications. The payment for centering shall be given after the concrete is laid.) The retrieved materials should be taken back by the contractor. For Super structure | 100 | Sqm | 737 ₹73,700 | 752 ₹75,200 |
| 1.70 | Cement concrete 1:3:6 using 40mm size hard broken granite stone jelly for flooring including well rammed, curing etc. including cost of materialls and labour charges etc complete complying with standard specification and as directed for the following items. | 100.09 | cum | 7,732 ₹7.7 L | 7,887 ₹7.9 L |
| 1.80 | Provision for Weep Holes | 1 | LS | 8,500 ₹8,500 | 8,670 ₹8,670 |
| 1.90 | Provision for Name Board and Photographic charges | 1 | No | 2,000 ₹2,000 | 2,040 ₹2,040 |
Tender Value
₹11.5 L
EMD Value
₹11,500
Closing Date
17 Feb 2026, 3:00 pmClosed
Block Development Officer BP
Panchayat Union Kotagiri
Construction of Retainingwall at Thuneri Nattakkal Road (Ch 1180) H/o Kengarai Panchayat of Kotagiri Block of The Nilgiris
2026_RDTN_655598_1
State Finance Commission (District Panchayat) 2025-26
Open Tender
Civil Works
180 days
Thuneri nattakkal Road
As per Tender Condition
3 documents required · 3 mandatory
₹0
₹11,500
Yes
18 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
Civil Work
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation etc complete.
Drilling Holes in Hard Rock 16mm Dia size including all cost and conveyance and Labour charges etc complete
Supplying and fabricating, placing in position m.s. or R.T.S for all Reinforced cement concrete works as per the design given including the cost of steel and bindingwire in all floors etc. complete complying with standard specification.
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and soffits including necessary supports and strutting up to 3.30 m.height for the following surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size.90cm.x 60cm and 10 B.G stiffened with mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak (country wood) joists of size 10cm x 6.5cm. spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centres complete complying with standard specifications. The payment for centering shall be given after the concrete is laid.) The retrieved materials should be taken back by the contractor. For Super structure
Cement concrete 1:3:6 using 40mm size hard broken granite stone jelly for flooring including well rammed, curing etc. including cost of materialls and labour charges etc complete complying with standard specification and as directed for the following items.
Provision for Weep Holes
Provision for Name Board and Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
PriceBid.pdf
Tender Documents • 0.29 MB
TechBid.pdf
Tender Documents • 0.64 MB
BOQ_787076.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid