Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.5 LAccepted-AOC SONKH ROAD DURGAPURI MATHURA SONKH ROAD MATHURA UTTAR PRADESH 281001 | MATHURA | UTTAR PRADESH | 281001 | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹11.5 L+₹3.1 L (36.2%)Rejected-AOC | L-2 | Rejected-AOC Reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.5 L
EMD Value
₹10,000
Closing Date
22 Jan 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC 1 AGRA
B-690 Kamla Nagar Agra
For the work of Installation of 3 Phase LT meter on the PTW connections in the area of EDD 1 Agra under the jurisdiction of ETD Agra
2021_DVVNL_628182_2
25/EDCA/2021-22
Open Tender
Electrical Works
Piece-work
365 days
B-690 Kamla Nagar Agra
As per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹10,000
17 May 2022
7 Jan 2022
22 Jan 2022
7 Jan 2022
22 Jan 2022
7 Jan 2022
180 days
Safe Carriage of 3 Phase LT meter with box and cable from store centre to concerning Test Lab & Test Lab to work site with loading and unloading at both respective ends. (Approx distance 0 to 50 kms)
A) Installation of 3 Phase LT meter of PTW connection at appropriate outside location and height (at least 5 feet), than connecting the meter with HT/LT distribution network/line and consumer's cut out/electrical fitting work includes proper completion and submission of sealing certificate to the concern supervisory engineer with the pre and post work photograhps and entry of meter advise in billing data by providing meter advise report in prescribed M.S. excel format and conversion consumers to MU base billing. B) Review of connection for confirming MU base billling after 10-15 days of meter installation as per billing parameter and providing meter reading in KWH and maximum demand (MD) in M.S. Excel format. NOTE :- The Contractor will have to arrange all concern items, such as clamp, nut & bolts, Tape, M-Seal etc. for the metering work and submitting the data in M.S. Excel to A.E. (M), EE(Test) for making MU Billing.
Laying Fixing and dressing of cable 35/16 mm x 3½ including fitting of clamps on cable support etc and connect to main supply (As per Required)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .