Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance As per system generated through eprocurement site |
| 2 | L2₹2.0 Cr+₹3.7 L (1.88%)Accepted-Finance | ₹2.0 Cr+₹3.7 L (1.88%) | L2 | Accepted-Finance As per system generated through eprocurement site |
| Sl No | Description | Qty | Unit | Ms YARKUM AGENCY L2 | M/s Aruna Enterprises L1 |
|---|---|---|---|---|---|
| 1.00SH : I : FORMATION CUTTING=0.800 km | |||||
| 1.01 | Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 3,119.02 | cum | 254 ₹7,92,231.08 Lowest | 254 ₹7,92,231.08 Lowest |
| 1.02 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross
sections.) | 12,476.08 | cum | 430 ₹53,64,714.4 Lowest | 430 ₹53,64,714.4 Lowest |
| 2.00SH: II: CC PAVEMENT | |||||
| 2.01 | Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | 2,475 | sqm | 220 ₹5,44,500 Lowest | 220 ₹5,44,500 Lowest |
| 2.02 | Centring and shuttering including strutting, propping etc. and removal of form work for: a) Foundation and Plinth. | 455.4 | sqm | 752 ₹3,42,460.8 Lowest | 752 ₹3,42,460.8 Lowest |
| 2.03 | Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) | 742.5 | cum | 3,150 ₹23,38,875 Lowest | 3,150 ₹23,38,875 Lowest |
| 2.04 | DLC:-Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) | 247.5 | cum | 7,125 ₹17,63,437.5 Lowest | 7,125 ₹17,63,437.5 Lowest |
| 2.05 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing ) | 495 | cum | 15,750 ₹77,96,250 | 15,001 ₹74,25,495 Lowest |
| 3.00SH:III:Cross Drainage | |||||
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
23 Mar 2026, 1:20 pmClosed
Executive Engineer, Sangram division, PWD, A.P.
O/o EE, Sangram Division, PWD, Kurung Kumey District, A.P
C/o CC Pavement road from Nyapin Sangram PWD road to Pingtey under Panyu circle
2026_PWDAP_3104_1
SGMD/eNIT/W-44/2025-26/12
Open Tender
Civil Works
Item Rate
365 days
Pingtey, Kurung Kumey district
Tender fee and EMD
4 documents required · 4 mandatory
₹5,000
Executive Engineer, Sangram Division, PWD
₹2.0 L
Yes
23 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
16 Mar 2026 - 21 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH : I : FORMATION CUTTING=0.800 km | |||||
| 1.01 | Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 1 | cum | 1.25 | ₹1.25 |
| 1.02 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross
sections.) | 1 | cum | - | - |
| 2SH: II: CC PAVEMENT | |||||
| 2.01 | Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | - | sqm | 100 | - |
| 2.02 | Centring and shuttering including strutting, propping etc. and removal of form work for: a) Foundation and Plinth. | 1 | sqm | 53 | ₹52.95 |
| 2.03 | Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) | - | cum | 10 | - |
| 2.04 | DLC:-Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) | - | cum | 22 | - |
| 2.05 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing ) | - | cum | - | - |
| 3SH:III:Cross Drainage | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 5.76 MB
BOQ_3304.xls
BOQ • 0.40 MB
BoQPingtey.rar
PDF • 0.10 MB
BOQ_3304.rar
PDF • 0.11 MB
CorrigendumBoQ.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .