| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹2.1 L+₹11,401 (5.80%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | V. SUNDARAM L1 | SRI ANGALAMMAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation depositing on Bank with initial lift of 2 meters in hard stilt clay stilt bleak cotton hard red earth Murrain, gravel stony earth and earth mixed with small size boulders and hard gravely soils (ss 20B) etc., complete.
All types of Soil | 25 | M3 | 198 ₹4,950 Lowest | 225 ₹5,625 |
| 2.00 | Plain Cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges including mixing, laying consolidating and curing etc., complete asper standard specification . | 2 | M3 | 5,572 ₹11,144 Lowest | 5,600 ₹11,200 |
| 3.00 | Centering for sides and soffits for all type of RCC work including cost of conveyance of all materials to site and all labour charges complete as per the specification.
Without Strutting | 33 | M2 | 489 ₹16,137 Lowest | 500 ₹16,500 |
| 4.00 | With Strutting | 16 | M2 | 978 ₹15,648 Lowest | 1,000 ₹16,000 |
| 5.00 | Plain Cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm ISS metal including mixing, laying, consolidating curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification. | 9 | M3 | 7,043 ₹63,387 Lowest | 7,100 ₹63,900 |
| 6.00 | Finishing the top of flooring with Granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 6 to 12mm stone chips – 25mm tk etc., Complete. | 7 | M2 | 169 ₹1,183 Lowest | 200 ₹1,400 |
| 7.00 | Supply to steel with fabrication including cost and conveyance of all materials to site and charges etc. complete | 500 | Kg | 81.85 ₹40,925 Lowest | 100 ₹50,000 |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix (One cement one and half sand and three aggregate) using 20mm ISS HBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 5 | M3 | 8,670 ₹43,350 Lowest | 8,700 ₹43,500 |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
17 Sept 2025, 3:00 pmClosed
E.O Karumandichellipalayam Town Panchayat
E.O Karumandichellipalayam Town Panchayat
Construction of Culvert at Ward No 09 Pethampalayam Road Selliamman Nagar in Karumandichellipalayam Town Panchayat
2025_DTP_604104_1
82/2025
Open Tender
Civil Works
Works
90 days
Karumandichellipalayam Town Panchayat
AS PER NORMS
2 documents required · 2 mandatory
₹0
₹2,500
22 Sept 2025
15 Sept 2025
17 Sept 2025
15 Sept 2025
17 Sept 2025
15 Sept 2025
15 Sept 2025 - 17 Sept 2025
Amount
Earth work excavation for foundation depositing on Bank with initial lift of 2 meters in hard stilt clay stilt bleak cotton hard red earth Murrain, gravel stony earth and earth mixed with small size boulders and hard gravely soils (ss 20B) etc., complete. All types of Soil
Plain Cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges including mixing, laying consolidating and curing etc., complete asper standard specification .
Centering for sides and soffits for all type of RCC work including cost of conveyance of all materials to site and all labour charges complete as per the specification. Without Strutting
With Strutting
Plain Cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm ISS metal including mixing, laying, consolidating curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification.
Finishing the top of flooring with Granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 6 to 12mm stone chips – 25mm tk etc., Complete.
Supply to steel with fabrication including cost and conveyance of all materials to site and charges etc. complete
Reinforced cement concrete 1:1.5:3 mix (One cement one and half sand and three aggregate) using 20mm ISS HBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
SRI ANGALAMMAN CONSTRUCTIONS (BID ID -1460093)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_722097.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .