Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -37.50% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.0 L+₹20,296.95 (7.22%)Admitted-Fee/PreQual/Technical/Finance | -32.99% | ₹3.0 L+₹20,296.95 (7.22%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.1 L+₹24,302.33 (8.64%)Admitted-Fee/PreQual/Technical/Finance | -32.10% | ₹3.1 L+₹24,302.33 (8.64%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.1 L+₹25,967.49 (9.23%)Admitted-Fee/PreQual/Technical/Finance | -31.73% | ₹3.1 L+₹25,967.49 (9.23%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.2 L+₹38,253.67 (13.6%)Admitted-Fee/PreQual/Technical/Finance | -29.00% | ₹3.2 L+₹38,253.67 (13.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
13 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
CONSTRUCTION OF LANE NEAR THE HOUSE OF MUKHTAR AHMAD WANI MOHAMMAD SHAFI AHANGAR MOHAMMAD SALEEM WANI AT CHAND PORA GODOODBAGH
2026_HAUDD_314116_4
SHORTTerm NOTICE INVITING ETENDER No. 04 of 2026-2027 Dated 01.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
42 days
SALEEM WANI AT CHAND PORA GODOODBAGH
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹207
FA/CAO AC NO 0216010200000007
₹9,000
17 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labourers for site clearance | 13 | No. | 553 | ₹7,189 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 32.95 | Cum | 7,104.35 | ₹2,34,088.33 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,466.88 | Kgs | 123.2 | ₹1,80,719.62 |
| 4 | Carriage of material by mechanical means.
A. Sand/Stone Aggregate | 44 | Cum | 409.94 | ₹18,037.36 |
| 5 | Carriage of material by Head Load
A. Sand/Stone Aggregate | 33 | Cum | 303.3 | ₹10,008.9 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1017131.xls
BOQ • 0.29 MB
Andum45-pages.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .