| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-Finance | L1 | Accepted-Finance NA | |
| 2 | L2₹13.5 L+₹58,267.16 (4.51%)Accepted-Finance | L2 | Accepted-Finance NA | |
| 3 | L3₹13.5 L+₹58,716.78 (4.55%)Accepted-Finance | L3 | Accepted-Finance NA | |
| 4 | L4₹13.5 L+₹59,871.77 (4.64%)Accepted-Finance | L4 | Accepted-Finance NA |
| Sl No | Description | Qty | Unit | SHANMUGAVELU L2 | SOBIYA SRI CONSTRUCTIONS L4 | R GNANASEKARAN L1 | PRAVIN ANAND L3 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of New Anganwadi Building at Krishnapuram Village in Vannankundu panchayat (Roofing with PUFF Panel) | |||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 39.58 | m3 | 263 ₹10,409.54 | 263 ₹10,409.54 | 250 ₹9,895 | 240 ₹9,499.2 Lowest |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 8.23 | m3 | 4,500 ₹37,035 | 6,506 ₹53,544.38 | 6,500 ₹53,495 | 2,000 ₹16,460 Lowest |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 19.77 | m3 | 120 ₹2,372.4 | 120 ₹2,372.4 | 100 ₹1,977 Lowest | 120 ₹2,372.4 |
| 5.00 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 30.35 | m3 | 5,500 ₹1,66,925 | 6,247 ₹1,89,596.45 | 5,100 ₹1,54,785 Lowest | 6,400 ₹1,94,240 |
| 6.00 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 13.8 | m3 | 9,989 ₹1,37,848.2 | 10,248 ₹1,41,422.4 | 9,500 ₹1,31,100 Lowest | 10,000 ₹1,38,000 |
| 7.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,203.7 | KG | 90 ₹1,08,333 | 91 ₹1,09,536.7 | 70 ₹84,259 Lowest | 90 ₹1,08,333 |
| 8.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 85.2 | Sqm | 540 ₹46,008 Lowest | 547 ₹46,604.4 | 540 ₹46,008 Lowest | 540 ₹46,008 Lowest |
| 9.00 | Above Basement | 34.48 | Sqm | 1,090 ₹37,583.2 | 1,095 ₹37,755.6 | 1,050 ₹36,204 | 1,000 ₹34,480 Lowest |
| 10.00 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 283.54 | Sqm | 291 ₹82,510.14 | 270 ₹76,555.8 | 250 ₹70,885 Lowest | 293 ₹83,077.22 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Developement Officer (B.Pt)
Block Developement Officer (B.Pt),Thiruppullani Union Office.
TPL01/Construction of New Anganwadi Building at Krishnapuram Village in Vannankundu panchayat (Roofing with PUFF Panel)
2026_RDTN_723607_1
RMD/TPL/A2/3865/2026
Open Tender
Civil Works
Item Rate
Thiruppullani
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
16 Nov 2026
6 Nov 2026
12 Nov 2026
6 Nov 2026
12 Nov 2026
6 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New Anganwadi Building at Krishnapuram Village in Vannankundu panchayat (Roofing with PUFF Panel) | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 39.58 | m3 | - | - |
| 3 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 8.23 | m3 | - | - |
| 4 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 19.77 | m3 | - | - |
| 5 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 30.35 | m3 | - | - |
| 6 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 13.8 | m3 | - | - |
| 7 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,203.7 | KG | - | - |
| 8 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 85.2 | Sqm | - | - |
| 9 | Above Basement | 34.48 | Sqm | - | - |
| 10 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 283.54 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_868718.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
P01vannankundu.pdf
Tender Documents • 0.74 MB
BOQ_868718.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .