Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
12 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer
Block Development Officer Sholinghur Block Ranipet District. 631102
Construction of Drainage cum Deck Slab at Bajanai koil street in Govindhacheri colony H/O Govindhacheri Panchayat in Sholinghur Block, Ranipet District
2023_RDTN_311089_1
B4/817/2022, Date 3.05.2023
Open Tender
Civil Works
Works
90 days
Sholinghur Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,000
12 May 2023
5 May 2023
12 May 2023
5 May 2023
12 May 2023
5 May 2023
Amount
Sholinghur Block
Construction of Drainage cum Deck slab at Bajanai Koil street in Govindacheri Colony H/O Govindacherri Panchayat in Sholinghur Block, Ranipet District
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Supply, fabrication for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. ., including all labor charges etc as directed by departmental officers.
Plain Cement Concrete 1 : 3 :6 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 20mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost of material to site and all labour charges etc., complete
Plasterring 1:4 mix 20mm thick including all materials to site and cost of conveyance and all labour charges etc. complete
Horizontal filter
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Plain Cement Concrete 1 : 3 :6 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 20mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Brickwork in CM 1:5 mix including cost and conveyance of material and all labour charges etc., complete
Plasterring 1:5mix 12mm thick including all materials to site and cost of conveyance and all labour charges etc. complete
Filling with 40mm metal including cost and conveyance of material and all labour charges etc., complete
Filling with sand including cost and conveyance of material and all labour charges etc., complete
Filling with gravel including cost and conveyance of material and all labour charges etc., complete
Supply and fixing of PVC pipe 180mm dia
Supply and fixing of PVC pipe 110mm dia
Supply and fixing of cuddapah slab including cost and conveyance of material and all labour charges etc., complete
Supply and fixing of steel grill including cost and conveyance of material and all labour charges etc., complete
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
BM GOKUL RAO
stage.html
html • 0.02 MB
finance_369219.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .