| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86,480Accepted-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹1.0 L+₹12,976 (14.3%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder |
Tender Value
Refer Docs
EMD Value
₹1,100
Closing Date
11 Jun 2021, 2:00 pmClosed
SE/ES
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
Annual maintenance works in Boiler Feed Pump Motors 4A 4B and 4C and Condensate Extraction Pump Motors 4A and 4B during Unit IV Annual overhaul for the year 2021 2022
2021_EB_201631_1
SE/ES/TTPS/102/2021-22
Open Tender
Electrical Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹1,100
Yes
25 Feb 2022
28 May 2021
12 Jun 2021
28 May 2021
11 Jun 2021
28 May 2021
Charges for carrying out annual maintenance works Boiler Feed Pump Motors BFP 4A, 4B & 4C: Charges for removing the cooler pipe line and cooler from the motor. Dismantling the cooler cover, cleaning the cooler tubes by wire brush, air and with water. Changing the gaskets and reassembling it, checking the cooler tubes for leak, hydraulic testing of cooler with 4 Kgf / cm2 pressure for six hour duration and reerecting the cooler. Checking the motor terminal tightness and taking IR value and PI value including cost of Nitrille rubber gasket (15 Kg) and anti corrosive paint (1 lit)
Charges for annual Maintenance works of Condensate Extraction Pump Motors CEP 4A & 4B: Removing of CEP Motor cooler top cover and fan. Cleaning of tubes by brush and air. Cleaning the fan and cover. Checking of motor terminal tightness. Taking IR values and PI values. Grease packing in DE and NDE bearings. Assembly of cooler cover after completion of work including Cost of Consumables and hire charges for T&P etc.
Charges for removal and refixing of floor grills at 15.5 mt level for lifting and re-erecting the coolers in the HT Motors: Removal of floor M.S. grills at 15.5 mt level by EOT Crane after providing adequate barricades for safety measure to lift coolers from the motors and refixing the M.S.grills in position. After completion of work, Removal of M.S.grills by EOT crane at 15.5 mt level after providing adequate barricades for safety measure to reerect the coolers in their motors and refixing the floor M.S.grill in its position including Cost of Consumables and hire charges for T&P etc.
C.ABDULLA ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .