| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.4 Cr+₹2.4 L (1.73%)Rejected-Finance | ₹1.4 Cr+₹2.4 L (1.73%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹1.4 Cr+₹2.9 L (2.06%)Rejected-Finance 20 OLD RAJ MOHALLA INDORE 452002 | INDORE | MADHYA PRADESH | 452002 | ₹1.4 Cr+₹2.9 L (2.06%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹1.4 Cr+₹5.9 L (4.25%)Rejected-Finance | ₹1.4 Cr+₹5.9 L (4.25%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹1.5 Cr+₹16.4 L (11.9%)Rejected-Finance | ₹1.5 Cr+₹16.4 L (11.9%) | L5 | Rejected-Finance Not Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
9 Sept 2023, 6:00 pmClosed
AGM (Engg.-Civil-II)
DABH Airport, Indore
GRADING, LEVELING IN EXTENDED OPERATIONAL AREA NEAR RUNWAY 25 BEGINNING and COVERING OF EXISTING OPEN DRAIN BY MS GRILL/JALI IN OPERATIONAL AREA AT D.A.B.H. AIRPORT, INDORE.
2023_AAI_164844_1
AAI/INDORE/CIVIL/2023-24/03
Open Tender
Civil Works
Item Rate
180 days
DABH Airport
Please refer Tender Document
2 documents required · 2 mandatory
₹1,180
₹3.5 L
21 Mar 2024
18 Aug 2023
11 Sept 2023
19 Aug 2023
9 Sept 2023
19 Aug 2023
19 Aug 2023 - 31 Aug 2023
Amount
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing welded square mesh composed of mild steel wire as drawn, fabricated into mesh of size 50mm x 50mm formed by the process of electric welding,consisting essentially of a series of longitudinal and transverse wires arranged substantially at right angles to each other and then welded together at all points of intersection in the required size of the frame all complete as per the direction and satisfaction of the Engineer-In-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls. Under 20 cm wide
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Earthwork in excavation in all kinds of soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimiming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location with all lifts and leads upto 1000m within airport premises as per satisfaction and direction of Engineer-In-Charge.
Construction of embankment with Good earth/ Moorum brought out from approved quarry out side the airport premises. The complete operation will include spreading the Moorum, dressing, levelling, providing camber, grading with motor grader and consolidating with vibratory roller 8-10 tonne capacity including making good the undulation etc. as per technical specifications and drawings complete and directions of Engineer-in-Charge. (Cost includes all leads ,taxes, royalty and operations)
Filling Available excavated earth in Airport operational area premises inlucing all leads etc complete ( excluding Rock) in embankment or depressions in accordance with requirements of lines, grades and in cross sections in layers not exceeding 20cm in depth consolidating each deposit layer by watering and ramming and every third top most layer with 8-10 tonne vibratory roller / soil compactor etc complete as per direction and satisfaction of Engineer Incharge. Payment to be made for compacted quantity only.
M/S SANJAY VERMA
Nayan Engineering Corporation
Y SAHITYA
ravi abrol
LION INFRASTRUCTURE AND TRANSMISSION
GRID ENGINEERS
Umiya Construction
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .