| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.5 CrAccepted-AOC 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICATION 124103 | JHAJJAR | HARYANA | 124103 | ₹18.5 Cr Quoted ₹18.8 Cr | 1 | Accepted-AOC Awarded due to L-1 |
| 2 | 2₹19.5 CrRejected-AOC | ₹19.5 Cr | 2 | Rejected-AOC Rejected due to L-2 |
Tender Value
₹15.9 Cr
EMD Value
₹31.8 L
Closing Date
16 Nov 2023, 3:00 pmClosed
AMAN Mor
EE PHE Division Bahadurgarh
(Recall) Chhara. Const. of 1 No. STP of 3.0MLD based on SBR, MPS consisting of RCC Collecting tank, Screening Chamber of suitable size for 3.00MLD Capacity, B.Masonry B.Wall 760M, Devp.land scapping, road, 3Nos. Staff Qtr. of 40.88Sqm, P.Machinery
2023_HRY_327654_1
2023D7AF25C7 25A9 42EA 976D F289F3547CF9593PUH
Open Tender
Civil Works
730 days
CHHARA
Eligibility criteria as per the approved DNIT.
3 documents required · 3 mandatory
₹20,000
₹31.8 L
Yes
14 Mar 2024
8 Nov 2023
16 Nov 2023
8 Nov 2023
16 Nov 2023
8 Nov 2023
Amount
MS Grating Cover of 450 x 450 mm size
Provision for restoration of water connection damaged due to laying of sewerage network complete in all respect.
Lowering salt glazed stoneware pipes and specials into trenches for all depths and laying out the same to correct alignment gradient, level etc in trenches including all dressing and trimming of bed and sides of trenches, if required, trimming and cutting of concrete beds and joint holes, supporting the pipes and specials, in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benching hunching and envelopes are completed. The sewer shall rest on the bed at every point throughout its length and to ensure this, it shall be grouted in without extra charge by the contractor with lime surkhi mortar, in the case of lime concrete beds and 1:3 cement sand mortar in the case of cement concrete beds including cartage from Divisional Store or nearest Railway station to site of work. The internal diameter of sewer being :-` 500mm i/d
Jointing and fixing salt glazed stoneware pipes and special in trenches using cement sand mortar 1:1 and best white Italian tarred hemp/yarn including finishing and trowel ling of each joint at an angle of 45 degrees with the longitudinal axis of the pipes, watering, keeping the joints covered and wetted till the same are cured, testing the sewer lines for leakages and making all leakages and defect good, complete as laid down in the contract specifications.. 500mm i/d
Cutting glazed stoneware pipes and specials chipping and finishing the cut surface to a uniform finish and roughing the part of the pipes, if any entering the sockets of the adjacent pipes complete, to the satisfaction of the engineer-in-charge of the works. 500mm i/d
Construction of HT/LT Panel room, PLC room, Centrifuge house, blower room and lab cum office building including doors, windows and fitting etc. at STP site covered area with RCC framed structures of brick work vitrified glzed tiles flooring, powder coated aluminium frame of size 100 x 45mm of 10 guage for door frame, 45mm x 45mm of 10 guage for window frame with 5mm thick glass AIS/Saint Gobin/Modi Float
Providing and installation of 6 No. CCTV cameras (2 at MPS and 4 at STP ) including cost of Wiring DVR, cable, lens etc. complete in all respects
SEWAGE TREATMENT PLANT :- Design, construction, erection, testing and commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping MCC Panel room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device, Real Time Water Quality Monitoring with Data Collection System (Online analyzer), Piping and Instrumentation works with PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid document and including following components including OandM of 5 Years after 12 months defect liability period after 3 months trail run period. i) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED energy outdoor suitable size reputed make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 7 mtr high including all accessories along the road and path complete in all respect. ii) Supply and installation of 1 No. Main Gate of (SS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg) at STP site. as per satisfaction of Engineer-incharge. iii) Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect of the NIT, including packing dry sludge in 20Kg Bag and supplying the same Market KisanSewa Kendra or as directed by Engineer-in-charge within lead as pointed at clause 4.4.5 of NIT including operation and maintenance of 5 Years after 12 months defect liability period after 3 months trail run period. iv) Providing and installation of 2 nos. pumping sets of suitable size (1 working and 1 standby) with head 15 mtrs. in chlorination tank to disposed off the treated effluent including all fittings, instrumentations, electric panel board etc. as per design complete in all respect including operation and maintenance of 5 Years after 12 months defect liability period after 3 months trail run period. v) Supply, Installation, Testing, Commissioning, operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 3.00 MLD STP at Village for Online (Continuous) measuring of PH, total Suspended Solids (TSS) Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cable, local data acquisition and display the data of continuous basis for up linking the data of CPCB, HSPCB and PHED, TUV Board approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender: Multi-parameter measuring converter, for connecting up to 18 intelligent seniors Scope including 8 analog inputs/Outputs(4 Inputs and 4 outputs) (o/4- 20Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement plant of 3.00 MLDSTP at with integrated with automatic cleaning. Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum).Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (Minimum) Data Transfer to CPCB, HSPCB and PHED Servers during 1 year of OandM after commissioning after 3 months trail period (including 1 year of defect liability period). Providing GSM 3G, 4G Modem with mobile network connectivity including network charges for 5 year of OandM after commissioning after 3 Months trail run (after 1 year defect liability period)
MAIN PUMPING STATIONS:- Design, construction, erection, testing and commissioning of MPS and following components including OandM for 5 years after 1 year defect liability period after 3 months trial run period. i) Panel room of 30 sqm. covered area, Pump Chamber of 8.53 x 3.96 Mtrs., HT Metering Panel Room of 4.50 x 3.66 Mtrs and PLC room including toilet block of 20 Sqmtr. covered area with RCC framed structure of brick work vitrified glazed tiles flooring, Powder coated aluminium frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin / Modi Float, The toilet block shall be with one half staff urinal and One European W/C, one wash hand basin as per approved drawings. ii) RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 3.00 MLD average flow with peak factor of 3.00, land scaping of the campus complete in all respect. Providing and installing 1 No motor of 3DWF,2 Nos. of 1DWF and 2 Nos. 0.50 DWF with 15 Mtr Head each with suitable LT Panel Board equipped with all safety devices, automotive capacitor bank and submersible cable from LT panel to pump set complete in all respect. iii) K9 DI pipe of suitable Dia at MPS Including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valve, non return valves as per requirements even for bye-pass arrangements complete in all respect. iv) 3 nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. v) Supply and installation of 2 nos. mechanical course screens of minimum length 6 mtrs. for 3.00 MLD average flow with peak factor of 3.0. 1. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in scope of work. 2. All the infrastructure except construction of Staff quarter ,Boundary wall (except Main Gate) and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. 3. All the pumping machinery, panel board, Level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. 4. The size and quantities of all the above components will be as per approved structural /Hydraulic /Mechanical /Electric design to be approved by Department before actual execution of work including OandM of 5 Years after 12 months defect liability period after 3 months trail run period.
Operation and Maintenance of Sewerage Network complete scope of work mentioned in the DNIT Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Chahar Construction Co
M/s Bhagwati Prasad Sharma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf