| 1 | L1₹4.7 CrAccepted-AOC BEHIND A R D FILLING CENTRE GRAM AKBARPUR TEHSIL KHATOLI DISTRICT MUZAFFARNAGAR PREVIOUS ADDRESS GRAM GHASIPURA P O MANSURPUR DISTRICT MUZAFFARNAGAR UTTAR PRADESH PIN CODE 203001 | MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 203001 | ₹4.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.7 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹4.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹4.7 CrRejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹4.7 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹4.7 CrRejected-Finance GRAM ALIPUR MORNA TEHSIL MAWANA DISTRICT MEERUT UTTAR PRADESH 245001 | 245001 | ₹4.7 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹4.7 CrRejected-Finance N 1 PARSAKHEDA BAREILLY NEW ADDRESS 163 SUBHASH NAGAR BAREILLY UTTAR PRADESH PIN CODE 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹4.7 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | NARESH KUMAR L4 | M/S SUDHIR KUMAR CONTRACTOR L6 | M/s Dinesh Contractor and Supplier L1 | MS ROAD LINES INDIA PVT LTD L5 | BHAMAR SINGH L2 | Preeti Buildcon Private Limited L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation in all type of soil with dressing and disposal. i/c cost of material, labour,royalty, T&P etc including all taxes complete as directed by Engineer in charge | 3,450 | Cum. | 65 ₹2.2 L | 64.84 ₹2.2 L | 64.06 ₹2.2 L | 64.79 ₹2.2 L | 64.52 ₹2.2 L | 64.58 ₹2.2 L |
| 2.00 | Supply/Providing, Laying, pitching and packing 20-40 kg.cut/split stone in mechanically woven double twisted Hexagonal shaped wiremesh gabion box/Crate of size 1.5 X 1.5 X 0.50m, mesh size 10cm X 12 cm,10 SWG G.I wire including all cost of labour material, and T&P etc with all taxes required for proper completion of work as per Engineer-in-charge. | 7,026 | Cum. | 4,892 ₹3.4 Cr | 4,910.56 ₹3.5 Cr | 4,851.67 ₹3.4 Cr | 4,906.74 ₹3.4 Cr | 4,886.57 ₹3.4 Cr | 4,892.05 ₹3.4 Cr |
| 3.00 | Supply/Providing, pitching and packing 20-40 kg.cut/split stone on shank slope including all cost of labour material, and T&P etc with all taxes required for proper completion of work as per Engineer-in-charge. | 928 | Cum. | 3,481.71 ₹32.3 L | 3,495.29 ₹32.4 L | 3,453.37 ₹32.0 L | 3,492.57 ₹32.4 L | 3,478.21 ₹32.3 L | 3,481.71 ₹32.3 L |
| 4.00 | Supply/Providing, filling of HDPE woven bags confirming to BIS No. 11652-2014 of cement bags size with local earth in nylon crate including laying in proper with loading, unloading and carriage i/c cost of material, labour, royalty, T&P etc complete as directed by Engineer in charge. | 2,09,892 | No. | 30.32 ₹63.6 L | 30.44 ₹63.9 L | 30.07 ₹63.1 L | 30.41 ₹63.8 L | 30.29 ₹63.6 L | 30.3 ₹63.6 L |
| 5.00 | Supply/Providing of Silt/sand from river bed at river bank by Mud pump including stacking, T&P etc for proper completion of work. | 2,384 | Cum. | 98.61 ₹2.4 L | 99.06 ₹2.4 L | 97.87 ₹2.3 L | 98.98 ₹2.4 L | 98.57 ₹2.3 L | 98.67 ₹2.4 L |
| 6.00 | Supply/Providing and laying of geotextile sheet made of 200 gsm woven multifilament with pegs including preparation of surface including all cost of labour, materials and T&P etc. complete | 5,855 | Sqm. | 103.16 ₹6.0 L | 103.56 ₹6.1 L | 102.32 ₹6.0 L | 103.48 ₹6.1 L | 103.05 ₹6.0 L | 103.1 ₹6.0 L |
| 7.00 | R.R Masonry in 1:4 Cement Mortar including cost of all material, labour, T&P and carriage etc. all complete. | 86.5 | Cum. | 6,331.92 ₹5.5 L | 6,356 ₹5.5 L | 6,280.39 ₹5.4 L | 6,351.69 ₹5.5 L | 6,325.57 ₹5.5 L | 6,331.9 ₹5.5 L |
| 8.00 | Cement Concrete in 1:2:4 on Stone Masonry including cost of all material, labour, T&P and carriage etc. all complete. | 9.6 | Cum. | 6,123.19 ₹58,782.62 | 6,147 ₹59,011.20 | 6,073.36 ₹58,304.26 | 6,142.3 ₹58,966.08 | 6,117.05 ₹58,723.68 | 6,123.1 ₹58,781.76 |
| 9.00 | Earth work in embankment by power transported earth with a lead up to 3 KM including excavation, loading, unloading, mannual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time of Govt. orders. | 3,675 | Cum. | 329.74 ₹12.1 L | 332 ₹12.2 L | 327.05 ₹12.0 L | 330.77 ₹12.2 L | 329.41 ₹12.1 L | 329.7 ₹12.1 L |
| 10.00 | Providing and laying bricks (M-150) on edge pitching (kharanja) in sand including preparation of sub grade and filling joints with local sand including cost of sand, brick and all labour,T&P etc.required for proper completion of work. | 594 | Sqm. | 432.76 ₹2.6 L | 434.45 ₹2.6 L | 429.24 ₹2.5 L | 434.11 ₹2.6 L | 432.32 ₹2.6 L | 432.5 ₹2.6 L |
Tender Value
₹5.3 Cr
EMD Value
₹10.5 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE GNSM Meerut
Office of SE GNSM Meerut
As per the NIT
2026_UPIDC_1123087_7
08/SE/2025-26
Open Tender
Civil Works
90 days
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹10.5 L
Office of SE GNSM Meerut
7 Apr 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
11 Mar 2026
Earth Work in excavation in all type of soil with dressing and disposal. i/c cost of material, labour,royalty, T&P etc including all taxes complete as directed by Engineer in charge
Supply/Providing, Laying, pitching and packing 20-40 kg.cut/split stone in mechanically woven double twisted Hexagonal shaped wiremesh gabion box/Crate of size 1.5 X 1.5 X 0.50m, mesh size 10cm X 12 cm,10 SWG G.I wire including all cost of labour material, and T&P etc with all taxes required for proper completion of work as per Engineer-in-charge.
Supply/Providing, pitching and packing 20-40 kg.cut/split stone on shank slope including all cost of labour material, and T&P etc with all taxes required for proper completion of work as per Engineer-in-charge.
Supply/Providing, filling of HDPE woven bags confirming to BIS No. 11652-2014 of cement bags size with local earth in nylon crate including laying in proper with loading, unloading and carriage i/c cost of material, labour, royalty, T&P etc complete as directed by Engineer in charge.
Supply/Providing of Silt/sand from river bed at river bank by Mud pump including stacking, T&P etc for proper completion of work.
Supply/Providing and laying of geotextile sheet made of 200 gsm woven multifilament with pegs including preparation of surface including all cost of labour, materials and T&P etc. complete
R.R Masonry in 1:4 Cement Mortar including cost of all material, labour, T&P and carriage etc. all complete.
Cement Concrete in 1:2:4 on Stone Masonry including cost of all material, labour, T&P and carriage etc. all complete.
Earth work in embankment by power transported earth with a lead up to 3 KM including excavation, loading, unloading, mannual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time of Govt. orders.
Providing and laying bricks (M-150) on edge pitching (kharanja) in sand including preparation of sub grade and filling joints with local sand including cost of sand, brick and all labour,T&P etc.required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
technical_2091956.pdf
techsummary_2091956.pdf
finance_2091956.pdf
BOQ Comparative Chart
xlsx
finsummary_2091956.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
TDLOT7.pdf
Tender Documents • 1.56 MB
BOQ_2091956.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid