| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | L1 | Accepted-AOC awarded | |
| 2 | L2₹15.2 L+₹1.9 L (14.7%)Rejected-Finance 3491 FAUJI BAKERY BASIS ROAD DAYARAM NAGAR 123106 | REWARI | HARYANA | 123106 | L2 | Rejected-Finance rejected | |
| 3 | L3₹16.1 L+₹2.9 L (21.7%)Rejected-Finance | L3 | Rejected-Finance rejected | |
| 4 | L4₹17.8 L+₹4.6 L (34.8%)Rejected-Finance | L4 | Rejected-Finance rejected |
Tender Value
₹17.6 L
EMD Value
₹35,240
Closing Date
18 Jan 2024, 5:00 pmClosed
XEN PWD B AND R REWARI
Garhi Bolni Road Rewari
Reconstruction of Boundary wall of Govt. College at Nahar Balance Work in Rewari Distt.
2024_HRY_342876_1
2024C7416C01 18A4 4A53 8CA9 F16009E62ABA648BAR
Open Tender
Civil Works - Buildings
Works
90 days
NAHAR
3 documents required · 3 mandatory
₹1,000
₹35,240
Yes
6 Mar 2024
11 Jan 2024
19 Jan 2024
11 Jan 2024
18 Jan 2024
11 Jan 2024
Amount
[11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand)
[11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand)
[11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
[11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer
[11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm)
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
[5.8.3]Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 3. From brick work in cement mortar
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level
[6.25.2]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers
[6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
[7.47.2]Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor IV level in : 2. Cement mortar 1:6 (1 cement : 6 Coarse sand)
[7.48.1]Brick work with modular extruded brunt fly ash clay sewer bricks (Conforming to IS: 4885 ) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth : 1. Cement Mortar 1:4 ( 1 cement : 4 coarse sand)
The Harshika Co. Op L&C Society
The Sat Sahib Coop L C Society Ltd.
THE S D COOPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .