Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹2.6 L A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | L1 | |
| 2 | L2₹3.0 L+₹40,667.81 (15.5%) A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | L2 | |
| 3 | L3₹3.9 L+₹1.2 L (47.5%) A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | L3 | |
| 4 | L4₹4.8 L+₹2.2 L (85.3%) A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. | L4 |
| Sl No | Description | Qty | Unit | Kamlesh Kumar Sharma L2 | Satish Shyam Surya L3 | Sajad Ahmed L4 | Ashwani Vij L1 |
|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -47 ₹3,02,299.28 | -32.32 ₹3,86,030.48 | -15 ₹4,84,819.6 | -54.13 ₹2,61,631.47 Lowest |
Tender Value
₹5.7 L
EMD Value
₹11,408
Closing Date
13 Jul 2024, 3:00 pmClosed
AE-C-4
Inderpreet Singh
Bemloe Shimla
A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla. Subwork/Packages: A/R & M/O GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer Hill Shimla.
81507
110/2024-25/EE-I/AE-II/Shimla
OPEN
Civil Works - Others
NCB
15 days
Shimla, Himachal Pradesh
10 documents required · 10 mandatory
₹11,408
Not Applicable
13 Jul 2024
10 Jul 2024
13 Jul 2024
13 Jul 2024
12 Jul 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 0.93 MB
NIT.pdf
document • 2.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .