Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-Finance | ₹13.0 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹13.1 LRejected-Finance BARBOTAY BUSTY ROCK GARDEN DARJEELING | JALPAIGURI | WEST BENGAL | 734001 | ₹13.1 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹13.1 LRejected-Finance AUCKLAND ZIGZAG ROAD MERRY VILLA DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | 734101 | ₹13.1 L | L3 | Rejected-Finance Rejected |
Tender Value
₹13.0 L
EMD Value
₹26,014
Closing Date
22 Jan 2026, 4:00 pmClosed
EXECUTIVE ENGG BED
EXECUTIVE ENGG BED OFFICE LOUIS JUBLEE COMPLEX
CONSTRUCTION OF KITCHEN TOILET AND PROTECTION WORK AT NAYA DHURA LEPCHA BUSTY DARJEELING GTA.
2026_GTA_985017_2
NIeT-28 2nd call/2025-26 Dated-08/01/2026
Open Tender
CIVIL WORKS
180 days
Darjeeling
EMD,PRE-QUALIFICATION,BID CAPACITY,Enit ,tender form 2911.iiFORM X Y,DECLARATION
3 documents required · 3 mandatory
₹1,005
₹26,014
3 Feb 2026
8 Jan 2026
24 Jan 2026
8 Jan 2026
22 Jan 2026
8 Jan 2026
Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom,bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made on the basis of measurement of finished quantity of work) a) With earth obtained from excavation of foundation.
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Stone Boulder 150 mm of N. Bengal variety delivered and stack at site
II) Cement concrete with 30 mm down graded shingles excluding shuttering (B) In ground floor (with N.B. Variety Stone metal)(a) (1:3:6) proporaton
Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS codes.24.423 (ii ) River Bazree
Reinforcement for reinforced concrete work in all sorts of structures including distribution of bar, stirups,binders etc.initial straightening and removing of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection complete as per drawing and direction.(a) For works in foundatio n, basement and upto roof of ground floor/ upto 4m i) Tor steel / Mild steel
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
100mmthickAutoclaveaeratedconcreteblockWorkwithsize625mmx250 mm x 100 mm-Grade-I, having drying Shrinkage less than 0.05% conformingtoIS:2185(Part-3)-1984madeupof flyash(conformingtoIS: 3812-1981,withpermissiblelossonignitionupto6%), lime,cementandlaid in Cement Mortar (1:6) complete in all respect as per direction & satisfaction of Engineer-in-Charge .
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface.(ii) (a) with (4:1) cement morter 20 mm thick plaster 144.60 Sq.M 247.20 35745.12 (ii) (b) with (4:1) cement morter 15 mm thick plaster
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface.(ii) (a) with (4:1) cement morter 20 mm thick plaster 144.60 Sq.M 247.20 35745.12 (ii) (b) with (4:1) cement morter 15 mm thick plaster
M.S. structural works in roof trusses with tubular sections conforming to IS: 806- 1957 & IS: 1161- 1958 connected to one another with bracket,gusset,cleats as per design,direction of Engineer-In-Charge complete including cutting to requisite size. fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS: 814- 1957 haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section. consumables such as electrodes, gas and hire charges of all tools and plants and labour required for the work including all incidental charges such as electricity charges, labour insurance charges etc.(Payment to be made on the basis of calculated weight of structural tubular members as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with the weight of finished structural members. The rates are considere d for a height of erection 8m./ 2nd. floor leves from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initial 8m. or part ther of.
Supplying, fitting&fixingZn-Alalloy(55%Al&45%Zn) coating of 150 grams per sq. metre (followed by colour coatedonbothside) steel sheetworkhavingminimumyield strengthof550Mpaof trapizoidalprofileofapprovedmake (excludingthesupportingframework) fittedandfixedwith 55mm&25mmself tappingscrew,EPDMWasher16mm dia&3mmth.washeretc. completewith150mmendlap andonecorrugationminimumsidelap.(Payment tobemade on area of finished work).
Aluminium sheet ridging fittedwith self tapping screws, EPDM washers etc complete.(Minimum 225mm end lapping).
Galvanised iron sheet eaves gutter fitted and fixed with necessary50mmX6mmM.Sflatbarclampsbent todesign, bolts,nuts,washersetc.complete.Eavesguttermadeof0.63 mm. sheets.(300mm End lapping)
P.V.C- False Ceiling :ProvidingFalseCeilingmadewithframeworkofsteel tubeof40mmx20mmofnot lessthan18gauge,thelongandcrosssectionwillbeweldedwitheachother 1000mm to 1200mmapart the entire frameworkwill be fixed inwall usingrawlplug or gutties or screws etc. and suspended fromceilingwithM.S flat 19mmx3mm as necessary,the entire frame will be painted with red oxide. PRINTED LAMINATEDP.V.CSection150mmx12mmx1.00mm(+/-0.01mm) of approvedquality and colourwill be fixedon the frame so that the entire frameworkwill not bevisible frombelowP.V.CSectionwill be fixedwith the framewiththehelpofselftappingsteelscrewsincludingallmaterialsandlabour charges including fitting,fixing the same andhoisting includingmending the damagesinallrespectandcostofpaintasrequiredasperdirectionofEngineer in-Charge . In ground floor.
Supplying,Fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc.(A) Floor With Sand Cement Mortar (1:4) 20 mm thick & 2mm thick cement slurry at back side of tiles using cement @2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20Kg/Sq.m(a) Area of each tile up to 0.09Sq.m.
AcrylicDistemper tointeriorwall,ceilingwithacoatofsolventbased interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface.
ProtectiveandDecorativeAcrylicexterioremulsionpaintofapprovedquality, as permanufacturer's specification and as per direction o Engineer-inChargetobeappliedoveracrylicprimerasrequired.Therate includes cost ofmaterial, labour, scaffoldingandall incidental charges but excluding the cost of primer.
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand parpering etc. in cluding using of approved putty etc. on the surface , if necessary.
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand parpering etc. in cluding using of approved putty etc. on the surface , if necessary.(b) On steel or other metal surface:
Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing).580 mm X 440 mm.
Wash basin white vitreous china of approved make (without fittings) supplied, fitted and fixed in position on 75mm X 75mm X 75mm wood blocks and C.I. Brackets including two coats of painting of C.I. Brackets. 630 mm x 450 mm size.
Supplying, fitting and fixing PVC pipes for underground work ofapproved make of Schedule 80 (medium duty) conforming to ASTMD -1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). withall necessary accessories, specials viz. socket, bend, tee, union, cross,elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc.fitted including ostofallmaterials ,jointing materials, cutting pipes,making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Paymentwill be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories,specials.)150 mm
Supplying, fitting and fixing PVC pipes for underground work ofapproved make of Schedule 80 (medium duty) conforming to ASTMD -1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). withall necessary accessories, specials viz. socket, bend, tee, union, cross,elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc.fitted including ostofallmaterials ,jointing materials, cutting pipes,making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Paymentwill be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories,specials.)150 mm
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.ii) With Bazree (N.B Variety) (SAIL/TATA/RINL)
Construction of septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (1:4) including two 560 mm dia. R.C.C. manhole cover(heavy type)of approved make supplied, fitted and fixed in the 100mm thick R.C.C (1:1.5:3) top slab with necessary fittings, 20mm thick cement plaster (4 : 1) with neat cement finish to the internal surfaces and 15 mm thick cement plaster (4 : 1) to outside wall upto 200 mm below G.L floor finished with 25 mm thick grey artificial stone over 100 mm thick R.C.C(1:1.5:3) bottom slab including supplying, fitting and fixing all necessry specials, fittings, S.W. tees, C.I. foot rest etc. including excavation earth in all sorts of soil, shoring, bailing out and pumping out water as necessary, ramming, dressing the bed and fefilling the sides of the tanks with earth, removing spoils, filling up the chamber with clear water, removing foreign materials from the chamber and including constructing attached inspection pit as per approved drawing and connecting all necessary pipes, joints etc. with internal plaster work and artificial stone flooring is to be done with admixture of water proofing compound @ 0.5% by weight of cement with all costs of labour and materials. Note:- (i) Finished level of Septic Tank should be 400 mm. from Ground Level. (ii) Height of 50 mm. Ventilation pipe &Mosquito proof mesh, should be follwed as per IS:2470,Part- I.Payment will be made separetly on the basis of actual height based on relevant I.S.Code.
Construction of circular soak well 2.5metre deep in all types of sandy soils with dry brick work…
Supplying, fitting and fixing PVC pipes for underground work ofapproved make of Schedule 80 (medium duty) conforming to ASTMD -1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). withall necessary accessories, specials viz. socket, bend, tee, union, cross,elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc.fitted including ostofallmaterials ,jointing materials, cutting pipes,making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Paymentwill be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories,specials.)150 mm
Supplying fitting and fixing Flat back urinals….
Supplying, fitting and fixing windows and ventilators with or withoutintegrated grills conforming to IS 1038-1975 and manufactured fromrolled steel sections conforming to IS 7452-1974 with non-frictionprojecting type, box type hinges, glazing clips, lugs locking bracket,handle plate etc, including hoisting in position, straightening ifrequired, fixing lugs in cement concrete ( 1:2:4) with stone chips 20mm down cutting holes and mending good damages to match withexisting surface complete in all respect excluding glazing.(Add extra @ 1.2 % for each additional floors upto 4th floor and @1.5% for each addl. Floor above 4th floor.)In Ground floorFlash butt welded windows and ventilators(No shop priming will be allowed to facilitate inspection ofworkmanship)Without integrated grill(b) Openable steel windows as per IS sizes with side hung shuttersand horizotal glazing bars. [The extra rate admissible for theopenable portion only]
(A)Wood work in posts,post plates,rafters for door and windows…
supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar , end bifurcated with necessary screws etc. by cement concrete (1:2:4) as per direction . ( cost of concrete will be paid separately).(a) 40mm x 6mm, 250mm Length .
Panel shutters of door and window, as per design (each panel consisting of single plank with out joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.In ground floor.(In case of non-supply of single plank, panel rate of reduction of 20% will be made).(iv) 25mm.thick shutters with 12 mm. thick panel of size 30 to 45cm.
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete (In all floors for internal wall & upto 6m height for external wall ).(ii) 4 mm. thick.
Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom,bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any.
Earthwork in filling in compound, tank, low land, ditchesetc.withgoodearth, in layersnot exceeding 150mm. includingbreakingclodsandconsolidating the same by ramming and dressing complete. (Paymentwillbemadeonprofilemeasurementbefore and after the work)
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 2.85 MB
BOQ_2403804.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid