Tender Value
Refer Docs
EMD Value
₹92,400
Closing Date
10 Jun 2026, 10:00 am5d left
PO DUDA BIJNOR
O/O PO DUDA BIJNOR
VILL FAREEDPUR QAZI STHIT FIRE STATION PARISAR MAI INTERLOKING ROAD NIRMAN WORL
2026_TACPD_1156542_4
107
Open Tender
Civil Works
180 days
BIJNOR
PLEASE REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹854
PO DUDA BIJNOR
₹92,400
3 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | E/W in cutting or in embankment in ordinary soil including ramming and dressing the surface to required levels and slopes.excavated earth carted from distance up to 5.0Km as per direction of Er. I/c S.I.No. 253(a)+ chapter 3 | 268.41 | M2 | 208 | ₹55,829.28 | Dismentling of old and damage C.C Road including stacking of dismental material as directed by Engineer in charge with in a distance 60M i/c all T&P etc . Required for proper Completion of work.S.I.no 697. |
| 2 | Concrete with 40 mm.S/ ballast,C/ sand of 2.25 fm. And cement in proportion 8:4:1 in base i/c Supply of all materials Labour and T&p Etc.S I no 281 CH-5 | 4.8 | M3 | 6,720 | ₹32,256 | Disposal of dismentling c.c. road material with cartage upto distance 3.00 km i/c loading and unloading 80% of Item no 1 including T&P etc . Required for proper completion of work. S.I.no 231(a). |
| 3 | M 150 Class Brick Work 1:3 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 307 | 13.25 | M3 | 5,310 | ₹70,357.5 | Dismentling of B.O.E / interlocking tiles soling & Stacking of dismantalled bricks / tilesat side (labour only)S.I.no 2 (non schedule Item ch.-18) |
| 4 | 12 MM thick Plaster with one part of cement and Three part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 583. | 57.6 | M2 | 215 | ₹12,384 | M 150 Class Brick Work 1:4 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 307 (a) |
| 5 | W.B.M. G-3 (22.4- 53 mm stone ballast) providing] laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness] hand packing] rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 aspser Technical Specifiaction Clause 405. | 69.75 | M3 | 3,072.7 | ₹2,14,320.82 | 12 MM thick Plaster with one part of cement and four part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 584. |
| 6 | S/Laying of 80mm thick I Shadped Vibrator made interlocking Cement Conc Paver Block(cement gray and red colour) i/c joint filling with local sand i/c all complete at site | 558.03 | M2 | 910 | ₹5,07,807.3 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 10:5:1 including supply of all materials labour and completion of the work .S I no 281 a |
| 7 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279 a | 1.1 | M3 | 7,400 | ₹8,140 | Column |
| 8 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work S.I. 284 | 1.2 | M3 | 8,010 | ₹9,612 | Supply and Laying Stone Ballast with Fine sand i/c leveling / Compaction by 8-10 ton road roller etc labour and T&P Proper Completion of Work. |
| 9 | M.S. or Iron work in plain work such as R.C.C. or R.B. work including bending for proper completion of work and including supply of steel as per complete | 1.2 | Qtl | 8,120 | ₹9,744 | Supply and Laying of New 80mm thick pavers block Vibratour Made i/c joints filling with local sand i/c supply of all materials labour and T&P Proper Completion of Work. |
| 10 | S/F Sine Board at site including material labour and T&P etc.as per direction of Engineer incharge. etc complete. | 1 | Nos | 3,150 | ₹3,150 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279 a |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_2167112.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid