| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC BETAPUR | ₹9.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.0 L+₹16,238 (1.65%)Rejected-Finance | ₹10.0 L+₹16,238 (1.65%) | L2 | Rejected-Finance L2 |
| 3 | L3₹12.1 L+₹2.3 L (23.1%)Rejected-Finance | ₹12.1 L+₹2.3 L (23.1%) | L3 | Rejected-Finance L3 |
| 4 | L4₹15.6 L+₹5.8 L (59.2%)Rejected-Finance | ₹15.6 L+₹5.8 L (59.2%) | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.8 L
Closing Date
15 Jul 2021, 10:30 amClosed
EE NS ALHW PORT BLAIR
EE NS ALHW PORT BLAIR
Construction of retaining wall rear side of the type III Qtr. No.SC- 21 at ALHW colony, Shadipur in Port Blair
2021_ALHW_636321_1
ALHW/DCE-A/EE/NS/T-05/2021-22
Open Tender
Civil Works
Works
60 days
PORT BLAIR
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
13 Aug 2021
2 Jul 2021
16 Jul 2021
5 Jul 2021
15 Jul 2021
6 Jul 2021
6 Jul 2021 - 13 Jul 2021
Amount
Earthwork excavation in foundation trenches and column and plinth etc in all kinds of soil lead up to 100 Mtrs. and lift upto 1.5 Mtrs including stacking the excavated earth not more than 3 M from the edge of excavation and then rerturning the soil in 15 cm layers when required in plinths and sides of the foundation etc. consolidating each deposited layers by watering, ramming and the disposing offal surplus excavated soil in a lead of 30 Mtrs. as directed by the engineer, including cost of all labour charges cost of minor tools, GST,labour welfare cess etc complete.
Supplying and filling in plinth with Quarry Dust under floors including, watering, ramming consoldating and dressing,cost of all labour charges,cost of minor tools, GST, labour welfare cess etc complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteirng - -including cost of cement, local stone aggregates, Pulvarised sand, all labour charges,cost of minor tools,transportation charges, GST,labour welfare cess etc complete. complete. All work upto plinth level. 1:3:6 (1 cement, 3 pulvarised sand and 6 graded local stone aggregate 20mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering& shuttering, finishing and reinforcement - All work .including cost of cement,mainland river sand, local stone agregates, transportation charges of all materials to work site, all labour charges minor tools,GST,labour welfare cess etc complete. 1:1½:3 (1 cement, 1½ Mainland river sand, 3 graded local stone aggregate 20mm nominal size)
Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc. and removal of the same from reinforced cement concrete and plain concrete work as directed by the Engineer In Charge, including cost of cantering and shuttering, all labour charges, cost of binding materials, cost of transportation charges of all materials to work site, cost of ballies, labour welfare cess, GST ,cost of minor tools etc. complete.
Providing and fixing Tor steel reinforcement for Superstructure R.C.C. work including cost of tor steel,cutting, bending, binding, and placing in position cost of binding wire, all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine , vibrator, labour welfare cess, GST etc complete. minor tools etc. complete.
Providing and fixing on weep hole with unplasticised, PVC pipes 50 mmdia including cost of pipe , all labour charges, labour welfare cess,GST, transportation charges of all materials to work site, scaffolding charges, cost of minor tools and plants etc. complete.
Plastering with cement mortar in 12 mm thick with 1:4 (one cement four sand) cement mortar as directed by the EIC, including cost of cement and including cost of mainland river sand, all labour charges, transportation charges of all materials in work site, scaffolding charges, cost of minor tools and plants,labour welfare cess,GST etc. complete.
SAKTI PADA DAS
M/s SAGAR ENTERPRISES
M/s. P. L. RAVI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .