Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹2.8 L
Closing Date
19 Aug 2026, 11:00 pmClosed
Directorate of Municipal Administration
Sunil Kumar K S
Tender for the work of Missing Links and Rectification Works Proposed for Existing UGD System of Arasikere City.
DMA/2026-27/WS/WORK_INDENT60942
DMA/2026-27/WS/WORK_INDENT60942
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
DMA City Municipal Council Arasikere
5 documents required · 5 mandatory
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Work done certificate
Annual turn over certificate
Line of Credit Certificate
PWD Civil registration certificate
satisfactory Performance Certificate
₹5,000
₹2.8 L
3 Aug 2026
3 Aug 2026
21 Aug 2026
19 Aug 2026
11 Aug 2026
Tender for the work of Missing Links and Rectification Works Proposed for Existing UGD System of Arasikere City.
Conducting Topographical GIS survey for the proposed Water Supply / UGD scheme to the city / town with latest total station survey equipments. The work shall include collection of field data from loca...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specifications, including setting out, c...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specifications, including setting out, c...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specifications, including setting out, c...
Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specifications, including setting out, constru...
Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specifications, including setting out, constru...
Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specifications, including setting out, constru...
Earth work excavation for pipeline trenchesby mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specification, including setting out, construction of shoring, ...
Earth work excavation for pipeline trenchesby mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specification, including setting out, construction of shoring, ...
Earth work excavation for pipeline trenchesby mechanical means above 600 mm (Depth upto 1.50m) trench width as per drawing and technical specification, including setting out, construction of shoring, ...
Crack Groove Cutting: Groove shall be cut using hand held electrically operated concrete cutting machine of size of 50 mm wide and 75 mm deep on each side of the crack to form as "V"groove . After the...
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. ...
Providing and Filling in foundation with granite / trap broken metal 100mm and down size with approved M-Sand including hand packing, ramming, watering including cost of all materials and labour with ...
Providing, lowering, laying, fixing, testing and commissioning of SW JUNCTION PIPES, conforming to IS: 651:1992 with latest amendments, of sizes, including conveying to work site and caulking with hem...
Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights...
Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying tru...
Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying tru...
Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying tru...
Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work sit...
Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work sit...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/ Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approv...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5...
Desilting of sewerlines by mechanical (Jetting,Sucking,Grabber,Scrapper etc.,) means ,setting up the over pumping arrangements,rodding and dislodging of accumulative silt from the pipeline ,removal of...
Desilting of sewerlines by mechanical (Jetting,Sucking,Grabber,Scrapper etc.,) means ,setting up the over pumping arrangements,rodding and dislodging of accumulative silt from the pipeline ,removal of...
Dewatering the sewage / storm water by using reqired HP submersible pump for the diversion of storm/ sewage during the execution of work.Considering for one Pump : 10 hp pump (Outfall RA - 15) do du...
Providing and laying Ductile Iron pipes of class - conforming to IS 8329:2000 with latest amendments, conveyiing to work site, rolling and lowering into trenches, laying true to line, level and perfec...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine agg...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately Bituminous course
Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately Granular course
Dismantling of Cement Concrete Pavement Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at design...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carria...
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 usi...
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
Providing and laying Bituminous Macadam with 120 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-40 at 3.4percentage by weight of...
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats with bituminous binder VG-30 Case - I : Type A...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For drain form works consider 20 Percentage
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-4-ASK NMPC UGD Work.doc
Tender Document • 1.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .