| 1 | L-1₹53.7 LAccepted-AOC TILAK CHOWK WARORA TEHSIL WARORA DISTRICT CHANDRAPUR MS 442907 | WARORA | CHANDRAPUR | MAHARASHTRA | 442907 | ₹53.7 L | L-1 | Accepted-AOC Work awarded |
| 2 | L-2₹58.0 L+₹4.3 L (7.99%)Rejected-Finance | ₹58.0 L+₹4.3 L (7.99%) | L-2 | Rejected-Finance Due to L-2 bidder. |
Tender Value
₹76.6 L
EMD Value
₹95,800
Closing Date
23 May 2026, 5:00 pmClosed
Staff Officer (Civil), WCL, Majri Area.
At/Post Kuchana, Tahsil Bhadrawati, District Chandrapur (MS) 442503.
Dismantling of GI sheets and constructing new compound wall with barbed wire fencing, bitumen carpeting of internal approach road, making cement concrete platform and shifting of entrance gate and security check post of regional store of NMSA of MA
2026_WCL_359203_1
ma9511cive002-26-27/064 Dated 07052026
Open Tender
Civil Works - Buildings
Percentage
120 days
New Majri Sub Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹95,800
11 Jul 2026
8 May 2026
25 May 2026
8 May 2026
23 May 2026
9 May 2026
8 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPROACH ROAD FROM MAIN ROAD TO STORE ENTRY GATE :- | |||||
| 1.01 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification. | 337.5 | Cum | 85 | ₹28,687.5 |
| 1.02 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400- 2)Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification.Plant Mix MethodFor Grading-I Material | 135 | Cum | 2,236 | ₹3,01,860 |
| 1.03 | Water Bound Macadam Providing, laying, spreading and compactingstone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification.By Mechanical Means(i) Grading- I (63 to 45mm)a) Using Screening Type-A (13.2mm Agg.) | 135 | Cum | 2,229 | ₹3,00,915 |
| 1.04 | Water Bound MacadamProviding, laying, spreading and compactingstone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specificationBy Mechanical Means(ii) Grading- II (53 to 22.4mm(a) Using Screening Type-B (11.2mmAgg.) | 135 | Cum | 2,348 | ₹3,16,980 |
| 1.05 | Construction of Shoulders with approved material/selected soili/c excavation all lifts & leads i/c grading torequired slope &camber of 4% and compacting using vibratoryroller of 80 to 100 kN static weight to meetrequirement as per relevant clause of 400.Earthen Shoulders (CBR value >7) | 135 | Cum | 194 | ₹26,190 |
| 2CONSTRUCTION OF HUME PIPE CULVERT :- | |||||
| 2.01 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means in oundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan), includingdressing of sides and ramming of bottoms, for all lift, includinggetting out the excavated soil and disposal of surplusexcavated soil as directed, within a lead of 50 m.All kinds of soil | 25.2 | Cum | 200.85 | ₹5,061.42 |
| 2.02 | Supplying and filling in plinth with sand under floors, includingwatering, ramming, consolidating and dressing complete. | 3.36 | Cum | 2,191.15 | ₹7,362.26 |
| 2.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived fromnatural sources : 6 graded stone aggregate 20 mm nominalsize derived from natural sources) | 2.52 | Cum | 6,309.15 | ₹15,899.06 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 1.98 MB
Tendernotice_2.pdf
PDF • 2.68 MB
BOQ_372070.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .