Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC accepted |
| 2 | L2₹5.2 LRejected-AOC | ₹5.2 L | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | PACHESWARI L1 | K TECH FOUNDATION L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 16 | M3 | 4,739 ₹75,824 | 4,800 ₹76,800 |
| 2.00 | Earth work excavation deploying earth moving machinery
for desilting channel having a width of more than 10m
and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete | 28 | M3 | 113 ₹3,164 | 115 ₹3,220 |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 | 64 | M2 | 366 ₹23,424 | 370 ₹23,680 |
| 4.00 | Plain Cement concrete 1:2:4 (one cement, Two crushed stone sand, Four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.-10 m3 | 6.5 | M3 | 6,755 ₹43,907.50 | 6,800 ₹44,200 |
| 5.00 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) | 96 | M2 | 286 ₹27,456 | 290 ₹27,840 |
| 6.00 | Supply and fixing of 20/30mm thick Kadapha stone slab with including cost and conveyance of all materials and including all labour charges etc complete.SOR page no.19 | 108.5 | M2 | 413 ₹44,810.50 | 450 ₹48,825 |
| 7.00 | Providing and laying in position ,Standardised Concrete Mix M-20 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials). | 15 | M3 | 8,550 ₹1.3 L | 8,600 ₹1.3 L |
| 8.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 754 | Kg | 93 ₹70,122 | 95 ₹71,630 |
| 9.00 | Removal of excavated excess earth including conveyance charges and all labour charges for filling etc complete | 19 | M3 | 103 ₹1,957 | 110 ₹2,090 |
| 10.00 | Supply and Fixing of SFRC Manhole including conveyance charges and all labour charges for filling etc complete 450mmx450mm Size | 32 | Nos | 2,700 ₹86,400 | 2,800 ₹89,600 |
Tender Value
₹6.1 L
EMD Value
₹6,100
Closing Date
9 Apr 2025, 3:00 pmClosed
The Commissioner, Tambaram Corporation
Muthurangan Street,West TAmbaram
Construction of SWD Palayathamman Koil Street to ward No 65 in Zone V in Tambaram City Municipal Corporation.
2025_DMA_539757_7
003/2025/E1/Z5
Open Tender
Civil Works
90 days
Tambaram City Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,100
10 Jan 2026
7 Apr 2025
9 Apr 2025
7 Apr 2025
9 Apr 2025
7 Apr 2025
Amount
Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete.
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete
Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30
Plain Cement concrete 1:2:4 (one cement, Two crushed stone sand, Four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.-10 m3
Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306)
Supply and fixing of 20/30mm thick Kadapha stone slab with including cost and conveyance of all materials and including all labour charges etc complete.SOR page no.19
Providing and laying in position ,Standardised Concrete Mix M-20 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials).
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Removal of excavated excess earth including conveyance charges and all labour charges for filling etc complete
Supply and Fixing of SFRC Manhole including conveyance charges and all labour charges for filling etc complete 450mmx450mm Size
K TECH FOUNDATION (BID ID -1286927)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid