Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | -35.00% | ₹2.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.6 L+₹10,444.17 (4.23%)Admitted-Fee/PreQual/Technical/Finance | -32.25% | ₹2.6 L+₹10,444.17 (4.23%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.7 L+₹27,388.88 (11.1%)Admitted-Fee/PreQual/Technical/Finance R O BAGHJOGI LANKER RAINAWARI SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -27.79% | ₹2.7 L+₹27,388.88 (11.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.1 L+₹62,684.03 (25.4%)Admitted-Fee/PreQual/Technical/Finance | -18.50% | ₹3.1 L+₹62,684.03 (25.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.3 L+₹79,784.51 (32.3%)Admitted-Fee/PreQual/Technical/Finance | -14.00% | ₹3.3 L+₹79,784.51 (32.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.8 L
EMD Value
₹7,600
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
Upgradation of lane/drain b.w.o Cement Concrete from h/o Mohd Hussain Dar to Abdul Rashid Sofi, Syedpora
2026_HAUDD_315318_24
SHORT Term NOTICE INVITING ETENDER No. 10 of 2026-2027 Dated 09.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Hussain Dar to Abdul Rashid Sofi, Syedpora
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹213
FA/CAO AC NO 0216010200000007
₹7,600
26 Jul 2026
9 Jul 2026
22 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance including removal of unservicable /Unhygeinic material complet job | 2 | No. | 553 | ₹1,106 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 24.08 | Cum | 7,104.35 | ₹1,71,072.75 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,540.81 | Kgs | 123.2 | ₹1,89,827.79 |
| - | Raising of RCC Polycrate Manhole cover and frame slab to required level including necessary concreting in M15 grade shuttering and making good the damage as required all complete job | 7 | No. | 400 | ₹2,800 |
| - | Carriage of material by mechanical Transport: Sand/Aggregate | 32.5 | Cum | 344.49 | ₹11,195.93 |
| - | Carriage of material by Manual Means/ Head Loadt: Sand/Aggregate | 14.57 | Cum | 200.67 | ₹2,923.76 |
| - | Add Provision of Signboard/Photograph/unforseen items | 1 | Job | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1022615.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .