Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
10 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Administrator
GP 2 KLD
Construction of Wall at Aaganbadi Kander Gulamaliwala
2026_PRD_592494_3
339-345 DATE 17-08-2026 GP 2 KLD THAR BADP
Open Tender
Civil Works
Percentage
120 days
GP 2 KLD
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MD RISL
₹20,000
Yes
11 Sept 2026
25 Aug 2026
11 Sept 2026
25 Aug 2026
10 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil disposal of surplus soil
with in a lead of 50m. | 61.56 | Cum | 143.92 | ₹8,859.72 |
| 2 | Cement concrete in foundation and plinth with brick ballast size 40mm including curing and compaction etc in 1:5:10 mix | 11.44 | Cum | 2,843.3 | ₹32,519.39 |
| 3 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 | 30.12 | cum | 4,542.12 | ₹1,36,795.03 |
| 4 | DPC with RCC 1:1.5:3 mix | 5.25 | cum | 5,705.33 | ₹29,952.98 |
| 5 | Brick work in super structure using bricks of class designation-75 in CM 1:6 | 71.89 | cum | 4,790.73 | ₹3,44,424.51 |
| 6 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3- graded stone aggregate 20mm nominal size) | 4.98 | cum | 5,705.33 | ₹28,431.94 |
| 7 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS:1786) bars | 498.34 | kg | 97.94 | ₹48,807.42 |
| 8 | Centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways with wooden members and removal of from work | 28.84 | sqm | 319.04 | ₹9,200.16 |
| 9 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 | 628.73 | sqm | 172.46 | ₹1,08,430.17 |
| 10 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete ( PWD BSR-2022-LESS -10%) | 628.73 | sqm | 75.6 | ₹47,531.72 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BID03DOCUMENTS.pdf
Tender Documents • 2.78 MB
BOQ_1051956.xls
BOQ • 0.23 MB
Corrlettergp2kld.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .