Loading…
Loading…
Tender Value
₹34 L
EMD Value
₹68,000
Closing Date
14 Jul 2026, 4:00 pm6d left
Executive Engineer R and B Division Khaltsi
Office of the Executive Engineer R and B Division Khaltsi
Construction of TSO office at Khaltsi (by way of compound walling and land development). Under SDP
2026_PWD_19100_1
12 of R and B Khaltsi of 2026-27
Open Tender
Civil Works - Others
30 days
Khaltsi
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Executive Engineer R and B Division Khaltsi
₹68,000
22 Jun 2026
22 Jun 2026
16 Jul 2026
23 Jun 2026
14 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m. All kinds of soil 80% | 285.26 | Cum | 278.09 | ₹79,327.95 |
| 2 | b) Ordinary Rock 20% | 71.32 | Cum | 504.48 | ₹35,979.51 |
| 3 | Earth work in excavation by manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 27.61 | Cum | 445.86 | ₹12,310.19 |
| 4 | Dumping stone including cost of stones in Horizontal on level | 79.29 | Cum | 953.03 | ₹75,565.75 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.8 | Cum | 5,725.33 | ₹16,030.92 |
| 6 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with, Cement mortar 1:6 (1 cement : 6 coarse sand) including the cost and carriage of cement . complete job. | 87.47 | Cum | 5,730.39 | ₹5,01,237.21 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level,
excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | 4.44 | Cum | 11,102.31 | ₹49,294.26 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. Including the cost and carriage of steel. complete job. | 557.85 | Kgs | 109.33 | ₹60,989.74 |
| 9 | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal size) | 52.51 | Cum | 14,111.48 | ₹7,40,993.81 |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). Second class Kail wood | 0.17 | Cum | 1,01,823.34 | ₹17,309.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_45520.xls
BOQ • 2.58 MB
Download all tender documents and submit your bid