EE ARCOT
110KV SS Arcot Campus Thazhanur
Works Contract for Erection and transportation of poles paving of HT LT lines DT erection and other allied works for 2 Nos Industrial SC Suresh Srinivasan and 4 Nos DCW Muhamad Needeem Abubakkar siddiqe Manigandan BandB Developer in Visharam sectio
2023_EB_300751_1
01
Open Tender
Electrical Works
Works
180 days
EE ARCOT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
27 Apr 2023
10 Apr 2023
18 Apr 2023
10 Apr 2023
17 Apr 2023
10 Apr 2023
Amount
Excavation of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual with Base Plate.
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane/Manual with Base Plate.
Excavation of RCC, REC, PSC poles above 8.00m length by using JCB/Manual with base plate.
Erection of RCC, REC, PSC poles above 8.00m length by using crane/Manual with base plate.
Excavation of metal supports above 9m/RSJ/Rail pole/Tubular pole with Steel plate.
Erection of metal supports above 9m/RSJ/Rail pole/Tubular pole with Steel plate.
Excavation of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding, Stay Plate etc.
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding, Stay Plate etc.
Fixing of HT Tapping X arm / V Cross arms 3 1/2, 4 1/2 & 5 feet
Fixing of LT 3 Phase cross arm
Fixing of LT single Phase cross arm
Fixing of HT / LT TI Fitting
Fixing of HT Pin Insulators (11/33KV)
Fixing of LT Pin Insulators
Fixing of HT 11KV stain disc
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor/AB Cable. (route length)
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor /AB Cable upto 7/3.35mm ACSR. (route length)
Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor/AB Cable. (route length)
Erection of Distribution transformer at structure above 25KVA to 100KVA DT.
Erection of DP structure with stay as per TNEB Std Including fixing of top Channel,Cross bracing,Concreating,painting,color wasing etc….
ERECTION of Single Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6', erection of poles, erection of base plate, erection of structure materials , erection of 11 KV GOS and HG Fuse, Structure Earthing complete , Pole concreting (2' x 2' x 6') for both base and sleeve including supply of jelly, sand and cement by the contractor in the ratio of concreting 1:2:4 , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5" , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pipe including erection of cement collar and painting of pole with Distember (paint and earth bit collar to be supplied by contractor) (with centre support)
Transporting of all types of poles by bullock cart or other vehicle (for all size of poles including loading and unloading) for a lead upto 5KM
Transporting of Distribution Transformer / Line materials from Sub stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Loading/Unloading of DT upto 100KVA
Loading/Unloading of variouse size of REC, RCC,PSC Poles upto 8.0m length
Loading/Unloading of variouse size of REC, RCC,PSC Poles above 8.0m length
Loading/Unloading of metal Poles of all sizes
Loading/Unloading of line material
Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit
Dismandling of Stay set complete without Stay rod
Dismandling of conductor of upto 7/3.35/AB Cable including Transporting the conductor to the nearest road side and stocking in coils
Dismandling of conductor of above 7/3.35/AB Cable including Transporting the conductor to the nearest road side and stocking in coils
Dismandling of Cross arm clamps, TI fittings hardwares, insulators etc.
Earthing of poles with GI wires 4/ 6/8 SWG by coil earthing
Cement Concrete of ratio for individual poles shall be in the ratio of 1:2:4 (1 part Cement, 2 parts coarse sand and 4 parts 20mm aggregate stones chips)(material +labour) sleeve concreting of poles
clamp alteration
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .