Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹73.5 L+₹1.8 L (2.53%)Rejected-Finance GRAM NAGLA KHUJI POST DADON ATROLI ALIGARH UTTAR PRADESH | ALIGARH | ALIGARH | UTTAR PRADESH | L2 | Rejected-Finance L2 | |
| 3 | L3₹75.9 L+₹4.3 L (5.97%)Rejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | L3 | Rejected-Finance L3 | |
| 4 | L4₹82.4 L+₹10.8 L (15.1%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical As per Uploaded |
| Sl No | Description | Qty | Unit | M/S RAM CHARAN YADAV L1 | M/S MEERA CONSTRUCTION L4 | M/S ADITYA CONSTRUCTION COMPANY L3 | M/S JEET CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge including cost of all material, T&P, Labour taxes etc. but excluding GST. with proper completion of work. | 1,216.06 | M3 | 40 ₹48,642.4 Lowest | 100 ₹1,21,606 | 80 ₹97,283.1 | 77.2 ₹93,879.83 |
| 2.00 | Earth work in filling for making escape section with all lead & lift beyond 30m. Manual compaction and dressing to profile including cost of all labour, T&P,taxes etc. but excluding GST.with proper completion of work. | 861.6 | M3 | 101 ₹87,021.6 | 90 ₹77,544 Lowest | 148.23 ₹1,27,717.29 | 143.05 ₹1,23,251.88 |
| 3.00 | Dismantling reinforced cement concrete including stacking of dismantled materiala as directed by engineer-in-charge within a distance of 60m. including cost of all labours, T&P, taxes etc. but excluding GST.with proper completion of work. | 3.36 | M3 | 350 ₹1,176 | 100 ₹336 Lowest | 588.23 ₹1,976.44 | 567.67 ₹1,907.39 |
| 4.00 | Preparation of sub grade before laying of Boulder pitching including watering compaction and preparation of surface excluding cost of earth including cost of all material, labours, T&P, taxes etc. but excluding GST.with proper completion of work. | 1,792.12 | M2 | 20 ₹35,842.4 | 15 ₹26,881.8 Lowest | 15.69 ₹28,111.19 | 15.13 ₹27,114.78 |
| 5.00 | Centering & Shuttering for C.C & R.C.C work with all lead & lift required including cost of all material , labour, T&P taxes etc. but excluding GST.with proper completion of work. | 1,348.77 | M2 | 110 ₹1,48,364.7 Lowest | 550 ₹7,41,823.5 | 164.7 ₹2,22,146.47 | 158.95 ₹2,14,385.64 |
| 6.00 | Laying C.C. M-10 (1:3:6) in foundation with cement, coarse sand of F.M not less then 2.00 and hard stone ballast (4.75-20.00mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 64.12 | M3 | 7,500 ₹4,80,900 Lowest | 9,000 ₹5,77,080 | 9,454.63 ₹6,06,230.66 | 9,124.32 ₹5,85,051.4 |
| 7.00 | Laying C.C, M-15 (1:2:4) with cement ,coarse sand of FM not less then 2.00 and hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 69.55 | M3 | 8,800 ₹6,12,040 Lowest | 10,000 ₹6,95,500 | 9,591.96 ₹6,67,120.65 | 9,309.83 ₹6,47,498.68 |
| 8.00 | Laying C.C, M-20 (1:1.5:3) with cement ,coarse sand of FM not less then 2.00 and hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 33.91 | M3 | 9,000 ₹3,05,190 Lowest | 9,000 ₹3,05,190 Lowest | 9,979.35 ₹3,38,399.65 | 9,630.03 ₹3,26,554.32 |
| 9.00 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 12.98 | MT | 65,000 ₹8,43,505 | 70,000 ₹9,08,390 | 52,861.04 ₹6,85,977.66 | 51,014.3 ₹6,62,012.57 Lowest |
| 10.00 | Laying R.C.C, M-20 (1:1.5:3) with cement, coarse sand of FM not less then 2.00 and hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 135.72 | M3 | 9,200 ₹12,48,624 | 9,000 ₹12,21,480 Lowest | 9,979.35 ₹13,54,396.96 | 9,600 ₹13,02,912 |
Tender Value
₹97.1 L
EMD Value
₹1.9 L
Closing Date
7 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Restoration work of Nandaur Scape in District Santkabir Nagar.
2026_UPIDC_1201633_2
06/S.E/2026-27
Open Tender
Civil Works
Item Wise
150 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,146
₹1.9 L
17 Nov 2026
28 Oct 2026
7 Nov 2026
28 Oct 2026
7 Nov 2026
28 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge including cost of all material, T&P, Labour taxes etc. but excluding GST. with proper completion of work. | 1,216.06 | M3 | - | - |
| 2 | Earth work in filling for making escape section with all lead & lift beyond 30m. Manual compaction and dressing to profile including cost of all labour, T&P,taxes etc. but excluding GST.with proper completion of work. | 861.6 | M3 | - | - |
| 3 | Dismantling reinforced cement concrete including stacking of dismantled materiala as directed by engineer-in-charge within a distance of 60m. including cost of all labours, T&P, taxes etc. but excluding GST.with proper completion of work. | 3.36 | M3 | - | - |
| 4 | Preparation of sub grade before laying of Boulder pitching including watering compaction and preparation of surface excluding cost of earth including cost of all material, labours, T&P, taxes etc. but excluding GST.with proper completion of work. | 1,792.12 | M2 | - | - |
| 5 | Centering & Shuttering for C.C & R.C.C work with all lead & lift required including cost of all material , labour, T&P taxes etc. but excluding GST.with proper completion of work. | 1,348.77 | M2 | - | - |
| 6 | Laying C.C. M-10 (1:3:6) in foundation with cement, coarse sand of F.M not less then 2.00 and hard stone ballast (4.75-20.00mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 64.12 | M3 | - | - |
| 7 | Laying C.C, M-15 (1:2:4) with cement ,coarse sand of FM not less then 2.00 and hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 69.55 | M3 | - | - |
| 8 | Laying C.C, M-20 (1:1.5:3) with cement ,coarse sand of FM not less then 2.00 and hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 33.91 | M3 | - | - |
| 9 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 12.98 | MT | - | - |
| 10 | Laying R.C.C, M-20 (1:1.5:3) with cement, coarse sand of FM not less then 2.00 and hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding centering and shuttering including cost of all material, Labour, T&P taxes etc. but excluding GST.with proper completion of work. | 135.72 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.14 MB
BOQ_2273903.xls
BOQ • 0.28 MB
Buklet1_2_merged.pdf
Tender Documents • 3.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .