Loading…
Loading…
Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹72.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹73.0 L+₹26,622.08 (0.37%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical D 5 CC COLONY DELHI 7 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 4 | Not Admitted-Fee/PreQual/Technical UNKNOWN | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹68.3 L
EMD Value
₹1.4 L
Closing Date
4 Mar 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
External outer development and additional work of construction of Nursing College at Baran (Excluding cost of Cement)
2026_RSRDC_542266_1
RSRDC NIT No. 734/2025-26 Dated 25.02.2026 Sl No 2
Open Tender
Civil Works - Buildings
Percentage
90 days
Nursing College at Baran
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹1,180
PD RSRDC UNIT BARAN THROUGH NEFT/RTGS/IMPS
₹1.4 L
18 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
4 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas
(exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 43.2 | CUM | 124 | ₹5,356.8 |
| 2 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc.Good soil of earth | 1,698.75 | CUM | 240 | ₹4,07,700 |
| 3 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | 369 | CUM | 1,327 | ₹4,89,663 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size). | 247.04 | CUM | 2,121 | ₹5,23,971.84 |
| 5 | Provinding and laying of paver block as per IS 15658 : 2006 (Indian standerd for Precast concrete block for Paving -specification) and IRC :SP:63-2004(guidelines for the use of interlocking concrete blockPavement) (from BIS approved manufactrers M-40,80mm thick to be used in medium-traffic (Medium trafficis defind as a daily traffic of 150-450 commercial vehicles exceeding 30 KN laden weight , or an equivalent of 0.5 to 2.0 MSA for a design life of 20years) like city streets, small and medium market roads, low volume roads ,ytility cuts on arterial roads, etc. Categary A Denated units to key into each other on four faces zigag shape as per IRC SP 63:2004 | 2,460 | Sqm | 851 | ₹20,93,460 |
| 6 | Add extra over rates of item No. 11.38, A to C if colored paver blocks are used | 2,460 | Sqm | 163.2 | ₹4,01,472 |
| 7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix
1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 8.1 | CUM | 2,080 | ₹16,848 |
| 8 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level.
('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) | 1,053 | KG | 77 | ₹81,081 |
| 9 | Steel work in built up tubular trusses including cutting, hoisting ( height upto 10 m)fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. Hot finished welded type tubes. | 15,000 | K.G. | 76 | ₹11,40,000 |
| 10 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape whenever required.1.60 mm thick with zinc coating not less than 275 gm/m2 | 300 | SQM | 1,296 | ₹3,88,800 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
spltcAlongwithPDBankDetails.pdf
Tender Documents • 0.43 MB
various_Circulars_Office_Orders.pdf
Tender Documents • 0.73 MB
agreement.pdf
Tender Documents • 0.45 MB
AnnexureABCDandRTPPAct.pdf
Tender Documents • 8.80 MB
BOQ_966673.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .