| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-AOC HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹9.9 Cr Quoted ₹10.5 Cr | L1 | Accepted-AOC lowest quoted bidder |
| 2 | L2₹10.7 CrRejected-Finance 33 GURU ILLAM V T PANDIAN NAGAR 4TH STREET KARIAPATTI 626 106 | VIRUDHUNAGAR | TAMIL NADU | 626106 | ₹10.7 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹10.9 CrRejected-Finance 2 10 SIVAGANGAI MAIN ROAD VARICHIYUR POST MADURAI 20 | MADURAI | TAMIL NADU | 625001 | ₹10.9 Cr | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | R.R.CONSTRUCTIONS L2 | Suganya Constructions L1 | M/S.S.K.CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| .10Bridge | ||||||
| 1.00 | Earth work excavation in all classes of soil, and depositing on bank,with all leads and lifts as per SS20B,including all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary, etc., complete as per relevant standard specification, for DRESSING THE BED UPTO LOWEST BED LEVEL . | 500 | Cum | 140 ₹70,000 | 139.8 ₹69,900 | 144 ₹72,000 |
| 2.00 | Earthwork excavation in all classes of soils and depositing on bank with all leads and lifts, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION UNDER ABUTMENTS, RETURN WALLS AND PIERS as per section 300 of MoRT&H Specifications (V Revision) | 3,765.91 | Cum | 500 ₹18.8 L | 507 ₹19.1 L | 522 ₹19.7 L |
| 3.00 | Compacted Cement Concrete of Grade M15 (Nominal Mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS as per section 2100 of MoRT&H Specifications (V Revision). | 76.12 | Cum | 8,000 ₹6.1 L | 7,165 ₹5.5 L | 7,367 ₹5.6 L |
| 4.00 | Compacted Plain Cement Concrete M25 (Design mix) using 40 mm ISS size HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, potable water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for FOOTING UNDER ABUTMENTS, RETURN WALLS AND PIERS as per Sections 1500,1700 & 2100 of MoRT&(H) Specifications (Fifth Revision) | 786.96 | Cum | 10,000 ₹78.7 L | 10,109 ₹79.6 L | 10,395 ₹81.8 L |
| 5.00 | Vibrated Cement Concrete of grade M25 (Design Mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc., complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, RETURNS, AND PIERS - BELOW SILL as per section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision). | 422.36 | Cum | 11,000 ₹46.5 L | 11,227 ₹47.4 L | 11,545 ₹48.8 L |
| 6.00 | Vibrated Cement Concrete of grade M25 Design Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS - ABOVE SILL LEVEL. | 611.76 | Cum | 12,000 ₹73.4 L | 12,159 ₹74.4 L | 12,504 ₹76.5 L |
| 7.00 | Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS as per section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision) | 31.06 | Cum | 14,000 ₹4.3 L | 14,430 ₹4.5 L | 14,839 ₹4.6 L |
| 8.00 | Providing weep holes with Class 1 PVC pipes of 100 mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain from the backfill as per Appendix-8 of IRC: 78 (Part 1)-2024 & Section 2706 of MoRT&(H) Specifications (V Revision). | 172 | Rm | 200 ₹34,400 | 211 ₹36,292 | 217 ₹37,324 |
| 9.00 | Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete. | 104.08 | Sqm | 125 ₹13,009.75 | 128.5 ₹13,374.02 | 132 ₹13,738.30 |
Tender Value
₹10.0 Cr
EMD Value
₹5.2 L
Closing Date
7 Feb 2026, 11:00 amClosed
SE HNRR TIRUNELVELI
Office of the SE H, NRR, AR line Road, Tirunelveli-2
Construction of High Level Bridge at km 0/8 of Athikulam - Ulakkudi road in lieu of existing Causeway
2026_HWAY_645653_1
TNNo.25.1/25-26/Ulakkudi
Open Tender
Civil Works - Bridges
365 days
Virudhunagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5.2 L
Yes
25 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
Bridge
Earth work excavation in all classes of soil, and depositing on bank,with all leads and lifts as per SS20B,including all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary, etc., complete as per relevant standard specification, for DRESSING THE BED UPTO LOWEST BED LEVEL .
Earthwork excavation in all classes of soils and depositing on bank with all leads and lifts, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION UNDER ABUTMENTS, RETURN WALLS AND PIERS as per section 300 of MoRT&H Specifications (V Revision)
Compacted Cement Concrete of Grade M15 (Nominal Mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS as per section 2100 of MoRT&H Specifications (V Revision).
Compacted Plain Cement Concrete M25 (Design mix) using 40 mm ISS size HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, potable water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for FOOTING UNDER ABUTMENTS, RETURN WALLS AND PIERS as per Sections 1500,1700 & 2100 of MoRT&(H) Specifications (Fifth Revision)
Vibrated Cement Concrete of grade M25 (Design Mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc., complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, RETURNS, AND PIERS - BELOW SILL as per section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision).
Vibrated Cement Concrete of grade M25 Design Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS - ABOVE SILL LEVEL.
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS as per section 1500, 1700 & 2200 of MoRT&H Specifications (V Revision)
Providing weep holes with Class 1 PVC pipes of 100 mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain from the backfill as per Appendix-8 of IRC: 78 (Part 1)-2024 & Section 2706 of MoRT&(H) Specifications (V Revision).
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifications, for DECK SLAB, KERB & SAFETY KERB as per section 1500, 1700 & 2300 of MoRT&H Specifications (V Revision)
Providing and fixing EXPANSION JOINT of 20mm thickness with approved type of PVC water stopper of 300mm width in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc, complete as per section 2600 of MoRT&H Specifications (V Revision).
Vibrated Cement Concrete M15 grade (Nominal Mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete, working in heights and hire charges for tools and plants, and all other incidental charges etc., complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB, RAMP and SAFETY KERB RAMP as per section 1500,1700 & 2704 of MoRT&H Specifications (V Revision).
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifications, for SAFETY KERB RAMP in approach slab portion as per section 1500, 1700 & 2300 of MoRT&H Specifications (V Revision).
Vibrated reinforced cement concrete M30 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental changes etc., complete for APPROACH SLAB as per section 1500, 1700 & 2704 of MoRT&H Specifications (V Revision)
Vibrated cement Concrete M30 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for WEARING COAT of 75mm uniform thickness over deck slab and approach slab as per section 2702.2 of MoRT&H Specifications (V Revision).
Vibrated Reinforced Cement Concrete M40 (Design Mix) using 20mm ISS graded metal including cost and conveyance of all materials to site, including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete for RCC CRASH BARRIERS OVER DECK SLAB as per section 811, 1700 & 2703.3 of MoRT&H Specifications (V Revision).
Providing and fixing of G.I. drainage spouts 100mm dia as per GOT drawing SQ/701 with grating arrangements at top as shown in the drawing using 12mm X 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc., complete as per section 2705 of MoRT&H Specifications (V Revision).
Providing filter media behind the abutments and returns for 600mm thick with clean III graded material 53mm to 5.6mm and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., complete as per Cl. 710.1.4 & Appendix 8 of IRC : 78 (Part-1) - 2024
Filling behind Abutments and Wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for FILLING BEHIND THE ABUTMENTS AND WINGS.
Supply and fabrication of Fe-500 (HSD) required for all RCC items involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per section Section 1009.3, 1600 of MoRT&H Specifications (V Revision).
Supply and fabrication of Mild Steel Grade I required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete as per section Section 1009.3, 1600 of MoRT&H Specifications (V Revision).
Supply and fixing of High Quality of PVC pipes of 160mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.
Double cell box culvert
Earth work excavation in all classes of ordinary soils except hard rock requiring blasting and depositing on bank,with all leads and lifts as per SS 20B,Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams sheeting, shoring, bracing,and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for FOUNDATION OF BOX CULVERT as per section 300 of MORT&H Specifications (V Revision) and IS 1200 - 1992 Part 1 (IV Revision).
Vibrated Cement Concrete of grade M15 Nominal Mix (1:2:4) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELLING COURSE BELOW FOUNDATION.
Vibrated Reinforced Cement Concrete of grade M25 Design Mix using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASE SLAB, VERTICAL WALL AND DECK SLAB.
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for PARAPET OVER BOX CULVERT.
Supply and fabrication of Fe-500 (HYSD) STEEL required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete.
Providing and fixing of G.I. DRAINAGE SPOUT 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc.,. complete as per section 2705 of MORT&H Specifications (V Revision).
Triple cell box culvert
Earth work excavation in all classes of ordinary soils except hard rock requiring blasting and depositing on bank,with all leads and lifts as per SS 20B,Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams sheeting, shoring, bracing,and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for FOUNDATION OF BOX CULVERT as per section 300 of MORT&H Specifications (V Revision) and IS 1200 - 1992 Part 1 (IV Revision).
Vibrated Cement Concrete of grade M15 Nominal Mix (1:2:4) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELLING COURSE BELOW FOUNDATION.
Vibrated Reinforced Cement Concrete of grade M25 Design Mix using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASE SLAB, VERTICAL WALL AND DECK SLAB.
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for PARAPET OVER BOX CULVERT.
Supply and fabrication of Fe-500 (HYSD) STEEL required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete.
Providing and fixing of G.I. DRAINAGE SPOUT 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc.,. complete as per section 2705 of MORT&H Specifications (V Revision).
Dismantling the existing structures
Dismantling the existing Plain Cement Concrete in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Dismantling the existing Reinforced Cement Concrete in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Approach road
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Approach Road - 95% Compaction.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Approach Road - 97% Compaction.
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base Grade V including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mixplant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Basecourse onwell prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112,501,502 &900 .
Providing and laying Tack Coat over WBM/WMM surface (treated with primer)using 2.50 Kg of Bitumen Emulsion (RS1)per 10 sqm for preparatory to another bituminous construction over itincluding cost of material, labourcharges, rentals formachinery, fuel and all other incidental charges etc., complete asper Clause 503 of MORTH Rev-5.
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.30 kg per sqm on the existing BT surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No. 111, 112,501, 503 & 900.
Providing, laying 50 mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50 -13.20 mm, 0.43 cum of 13.20 - 2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required densityetc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tippertrucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 30 / 40 mm thick using 0.13 cum of 19.00 - 9.50 mm, 0.17 cum of 9.50 - 2.36 mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete 50mm with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 507 & 900.
Diversion road
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Diversion Road - 95% Compaction.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Divsrsion Road - 97% Compaction.
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base Grade V including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mixplant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Basecourse onwell prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Providing and laying Prime Coat over WBM / WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction overit, including cost of material, labour charges, rentals for machinery, fuel and allother incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
Providing and laying Tack Coat over WBM/WMM surface (treated with primer)using 2.50 Kg o fBitumen Emulsion (RS1)per 10 sqm for preparatory to another bituminous construction over itincluding cost of material, labourcharges, rentals formachinery, fuel and all other incidental charges etc., complete asper Clause 503 of MORTH Rev-5.
Providing laying and rolling of Close Graded Premix Carpet of compacted 20 mm thickness using 0.0162 cum of 13.20-11.20 mm, 0.1404 cum of 11.2-5.6 mm, 0.0729 cum of 5.60-2.80 mm, 0.0405 cum of2.80 mm and below (TypeB) graded HBG metal using 19 kg of VG30 bitumen for 10 sqm including premixing at CMP, conveyance by tipper lorry, laying by paver finisher and rolling by Vibratory Roller including cost and conveyance of allmaterials, hire charges of all T&P all labour charges, fuel and and allother incidental charges etc., Complete as per specification using CMP as per clause 508 of MORTH Rev-5.
Supply of NP3 Class RCC Pipe conforming to IS 458 / 2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications.
Hoisting and fixing of NP3 Class RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications.
PCC Retaining wall
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for Founadation of PCC Retaining wall.
VCC M10 grade (Nominal Mix 1:3:6) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Levelling course of PCC Retaining wall.
Vibrated Cement Concrete M20 grade (Nominal Mix 1:1.5:3) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, shoring strutting etc., complete as per standard specification for Foundation of PCC Retaining wall (Below sill level).
Vibrated Cement Concrete M20 grade (Nominal Mix 1:1.5:3) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, shoring strutting etc., complete as per standard specification for Stem of PCC Retaining wall (Above sill level).
Vibrated Cement Concrete M15 grade (Nominal Mix 1:2:4) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds,, shoring strutting etc., complete as per standard specification for Broken Parapet
Providing and fixing Seepage pipes of 100mm dia PVC pipes of required length for Retaining Walls including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the PCC Retaining Wall
Painting
Painting two coat with ready mixed plastic emulsion paint and approved priming coat over the cement surface complete surface complete including scrapping clean removal of dirt parts for crash barrier, safety kerb, hand rails, bridge bottom sides, deck slab bottom, abutment, return walls and retaining wall sides with approved quality and colour including cost and conveyance of all materials to site, labour charges etc. complete as per standard specification.
Painting two coat with ready mixed plastic emulsion paint and approved including priming coat over the cement surface complete including scrapping clean removal of drit of parts and for Zebra marking.
Cement Concrete Revetment
Earthwork excavation in all classes of soils depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation of Toe wall Revetment as per section 300 of Morth Specification (V Revision) and IS 1200:1992 Part 1(IV Revision).
Vibrated Cement Concrete of grade M15 Nominal Mix (1:2:4) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing of Toe wall.
Vibrated Cement Concrete of grade M15 Nominal Mix (1:2:4) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Bodywall of Toe wall
Gravel backing to revetment for 150mm thick, including cost and conveyance of gravel to worksite, and filling in layers, of 150mm thick, tamping, including watering with all leads for water and all other incidental charges etc, complete.
Manufacturing and fixing Cement Concrete Blocks of size 250 x 250 x 300 mm in CC 1:2:4 Nominal mix (M15) using 20mm ISS size HBG metal including cost conveyance of all materials to worksite and cement site including conveyance and handling charges for the same at both ends, including all other incidental charges, etc, complete for REVETMENTS
Pointing with cement mortar 1:3 flush pointing with concrete blocks of size 250 x 250 x 300 mm including finishing watering ,curing etc Complete complying with standard specification and as directed by the depaertmental officers as per MORTH Rev Specification
Calculation of SubTotal, GST and Total carried out by system automatically
Sub Total Amount for above all items
GST 18% for the above SubTotal Amount
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
PB_Ulakudi.pdf
Additional Documents • 3.01 MB
Pertchart_Athikulam.pdf
Additional Documents • 0.13 MB
PQ_Ulakudi.pdf
Tender Documents • 0.48 MB
BOQ_773859.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid